Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235T771 + (09:11:49, 3 December 2024)
- 05000414/LER-1987-025-01, :on 870903,automatic Main Feedwater Isolation & Main Turbine Generator Trip Occurred Due to hi-hi Steam Generator Water Level.Caused by Personnel Error & Mgt Deficiency.Incident Reviewed W/Personnel + (09:11:51, 3 December 2024)
- ML20235T769 + (09:11:52, 3 December 2024)
- ML20235T764 + (09:11:53, 3 December 2024)
- ML20235T765 + (09:11:53, 3 December 2024)
- ML20235T763 + (09:11:54, 3 December 2024)
- ML20235T761 + (09:11:55, 3 December 2024)
- IR 05000483/1987013 + (09:12:06, 3 December 2024)
- ML20235T758 + (09:12:07, 3 December 2024)
- ML20235T754 + (09:12:08, 3 December 2024)
- PNO-IV-89-013, on 890120,manual Turbine/Generator Trip Initiated When Hydrogen Fueled Fire Occurred in Main Generator.Testing Revealed That Wall Thickness of Bottom Mounted Instrumentation Thimble Tubes Below Requirement + (09:12:09, 3 December 2024)
- ML20235T752 + (09:12:10, 3 December 2024)
- ML20235T750 + (09:12:10, 3 December 2024)
- ML20235T749 + (09:12:11, 3 December 2024)
- ML20235T747 + (09:12:12, 3 December 2024)
- ML20235T748 + (09:12:12, 3 December 2024)
- 05000482/LER-1989-003, :on 890131,discovered That Several Lugs Improperly Crimped Per Current Stds,Resulting in Degradation of Fire Protection Sys.Caused by No Specific Unique Util Imposed Crimping Stds for Panels + (09:12:15, 3 December 2024)
- ML20235T742 + (09:12:16, 3 December 2024)
- ML20235T743 + (09:12:16, 3 December 2024)
- ML20235T739 + (09:12:17, 3 December 2024)
- ML20235T737 + (09:12:18, 3 December 2024)
- ML20235T735 + (09:12:19, 3 December 2024)
- ML20235T734 + (09:12:20, 3 December 2024)
- ML20235T733 + (09:12:21, 3 December 2024)
- ML20235T729 + (09:12:22, 3 December 2024)
- ML20235T728 + (09:12:23, 3 December 2024)
- ML20235T727 + (09:12:24, 3 December 2024)
- ML20235T725 + (09:12:26, 3 December 2024)
- ML20235T721 + (09:12:27, 3 December 2024)
- ML20235T720 + (09:12:28, 3 December 2024)
- ML20235T717 + (09:12:28, 3 December 2024)
- ML20235T716 + (09:12:29, 3 December 2024)
- ML20235T715 + (09:12:31, 3 December 2024)
- ML20235T709 + (09:12:32, 3 December 2024)
- ML20235T707 + (09:12:33, 3 December 2024)
- ML20235T708 + (09:12:33, 3 December 2024)
- ML20235T706 + (09:12:34, 3 December 2024)
- B12692, Proposed Tech Spec Pages 3/4 4-8,3/4 9-1,3/4 9-1a,5-5 & B 3/4 9-1,changing Requirements for Cycle 2 Operation.Safety Evaluation Encl + (09:12:35, 3 December 2024)
- ML20235T704 + (09:12:35, 3 December 2024)
- ML20235T702 + (09:12:36, 3 December 2024)
- ML20235T701 + (09:12:37, 3 December 2024)
- ML20235T700 + (09:12:38, 3 December 2024)
- ML20235T699 + (09:12:38, 3 December 2024)
- ML20235T698 + (09:12:39, 3 December 2024)
- ML20235T697 + (09:12:39, 3 December 2024)
- ML20235T696 + (09:12:40, 3 December 2024)
- LR-N899025, Responds to NRC Bulletin 88-007,Suppl 1.GE Interim Stability Recommendations Revised to Provide Manual Scram Initiation Under All Operating Conditions When Two Recirculation Pumps Trip W/Reactor in Run Mode + (09:12:41, 3 December 2024)
- ML20235T693 + (09:12:41, 3 December 2024)
- ML20235T692 + (09:12:42, 3 December 2024)
- ML20235T691 + (09:12:43, 3 December 2024)
- ML20235T689 + (09:12:44, 3 December 2024)