Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ELV-00294, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Per 10CFR50,App J + (09:01:41, 3 December 2024)
- ELV-00292, Annual Operating Rept Part I + (09:01:42, 3 December 2024)
- ML20235U678 + (09:01:42, 3 December 2024)
- B12700, Corrects Error in 821029 Environ Rept OL Stage Re Mortality Coefficient of Winter Flounder Used in Second of Two equivalent-adult Methods.Revised Calculations Encl + (09:01:43, 3 December 2024)
- ML20235U675 + (09:01:44, 3 December 2024)
- ML20235U674 + (09:01:45, 3 December 2024)
- ML20235U673 + (09:01:45, 3 December 2024)
- ML20235U672 + (09:01:46, 3 December 2024)
- ML20235U669 + (09:01:47, 3 December 2024)
- ML20235U670 + (09:01:47, 3 December 2024)
- ML20235U665 + (09:01:48, 3 December 2024)
- ML20235U664 + (09:01:49, 3 December 2024)
- TXX-6850, Interim Deficiency Rept CP-87-100 Re Three Containment Isolation Penetrations That May Lack Relief Protection. Initially Reported on 870910.Evaluation Continuing.Next Rept Will Be Submitted by 871211 + (09:01:49, 3 December 2024)
- ML20235U662 + (09:01:50, 3 December 2024)
- IR 05000483/1989002 + (09:01:51, 3 December 2024)
- ML20235U661 + (09:01:51, 3 December 2024)
- ELV-00273, Forwards Sixth Suppl to Summary Rept of Startup Test Program.Initial Summary Rept Submitted on 870831.Suppl Addresses Remaining Startup Tests Incomplete as of Last Submittal + (09:01:53, 3 December 2024)
- ML20235U656 + (09:01:53, 3 December 2024)
- ML20235U650 + (09:01:54, 3 December 2024)
- ML20235U654 + (09:01:54, 3 December 2024)
- ML20235U648 + (09:01:55, 3 December 2024)
- IR 05000321/1987024 + (09:01:56, 3 December 2024)
- TXX-6560, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Initially Reported on 860616. Nonconformance Rept Review Program Scheduled for Completion by Fuel Load.Next Rept Will Be Submitted by 871120 + (09:01:56, 3 December 2024)
- 05000302/LER-1989-004, :on 890201,numerous Cells in Train a & B Batteries Found to Have Electrolyte Level Above Max Level Allowed by Tech Specs Resulting in Batteries Being Declared Inoperable.Caused by Overfilling of Cells + (09:01:58, 3 December 2024)
- ML20235U643 + (09:01:59, 3 December 2024)
- ML20235U642 + (09:01:59, 3 December 2024)
- IR 05000206/1989005 + (09:02:00, 3 December 2024)
- ML20235U641 + (09:02:00, 3 December 2024)
- 05000440/LER-1987-064, :on 870909,feedwater Pump Overspeed & Change in Feedwater Flow Control Signal Resulted in Reactor Scram,Hpcs Injection & RCIC Initiation.Caused by Procedural Error in Periodic Test Instruction (Pti).Pti Revised + (09:02:02, 3 December 2024)
- TXX-6801, Interim Deficiency Rept CP-87-89 Re Voltage Drop Between Class 1E Batteries & Station Uninterruptible Power Supply. Initially Reported on 870903.Evaluation Continuing to Determine Impact on 125 Volt Dc Sys Design.Next Rept 880115 + (09:02:03, 3 December 2024)
- ML20235U637 + (09:02:03, 3 December 2024)
- ML20235U634 + (09:02:04, 3 December 2024)
- ML20235U635 + (09:02:04, 3 December 2024)
- BSEP-89-0168, Responds to Violations Noted in Insp Repts 50-324/88-41 & 50-325/88-41.Corrective Actions:Std Operating Procedure SPO-02.6 Revised to Include Specific Directions for Following Plant Overtime Policy Guidelines + (09:02:05, 3 December 2024)
- IR 05000458/1987015 + (09:02:06, 3 December 2024)
- ML20235U631 + (09:02:07, 3 December 2024)
- 05000325/LER-1988-030, :on 881130,testing of Safety Relief Valves Revealed That 9 of 11 Valves Tested Lifted at Pressures Outside Tech Spec Tolerance of +/- 1%.Caused by Corrosion Induced Bonding of Pilot Valved Disc + (09:02:08, 3 December 2024)
- 05000341/LER-1987-029, :on 870615,surveillance Requirement for Determining Operability of Circuits Inadequate.Caused by Misinterpretation of Tech Spec.Surveillance Procedure Revised to Reflect Surveillance Requirement + (09:02:10, 3 December 2024)
- ML20235U628 + (09:02:10, 3 December 2024)
- ML20235U627 + (09:02:11, 3 December 2024)
- 05000368/LER-1988-018, :on 880922,breached Penetration Identified in Tech Specs Fire Barrier Wall FB-2081-02.In Dec 1983,breach Found Acceptable Due to Penetration Sealed on Opposite Side of Adjacent Wall.Caused by Personnel Error + (09:02:13, 3 December 2024)
- ML20235U624 + (09:02:13, 3 December 2024)
- ML20235U621 + (09:02:14, 3 December 2024)
- ML20235U620 + (09:02:15, 3 December 2024)
- ML20235U618 + (09:02:15, 3 December 2024)
- ML20235U617 + (09:02:16, 3 December 2024)
- ML20235U615 + (09:02:17, 3 December 2024)
- ML20235U612 + (09:02:19, 3 December 2024)
- 1CAN028914, Forwards Response to 890216 Request for Addl Info on High Pressure Interface (HPI) Backflow Event.New Design Using Redundant Check Valves as Supplemented by Testing & Maint Considered Adequate to Preclude Any Future HPI Conditions + (09:02:20, 3 December 2024)
- ML20235U610 + (09:02:20, 3 December 2024)
- ML20235U608 + (09:02:21, 3 December 2024)
- 05000260/LER-1987-009-02, :on 870911,while Pressure Switch in RWCU Being Recalibr,Lead from Test Equipment Slipped Out of Connection & Created Short Circuit Which Blew Fuse.Blown Fuse Replaced + (09:02:23, 3 December 2024)