Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235Y217 + (08:31:50, 3 December 2024)
- ML20235Y214 + (08:31:50, 3 December 2024)
- ML20235Y213 + (08:31:51, 3 December 2024)
- ML20235Y209 + (08:31:52, 3 December 2024)
- ML20235Y201 + (08:31:55, 3 December 2024)
- ML20235Y198 + (08:31:56, 3 December 2024)
- A06535, Responds to Concern Re Reactor Trips Attributed to Reactor Pressure Control Sys Noted in Insp Rept 50-245/87-04. Corrective Actions:Licensed Operator Requalification Training Addressed Event & Simulator Exercises Conducted + (08:31:57, 3 December 2024)
- ML20235Y193 + (08:31:58, 3 December 2024)
- ML20235Y196 + (08:31:58, 3 December 2024)
- ML20235Y187 + (08:32:00, 3 December 2024)
- ML20235Y192 + (08:32:00, 3 December 2024)
- PNO-II-87-049, on 870716,augmented Insp Team Formed After Licensee Calculated Possible Leak Rate of 600 Gpm.Util Will Visually Inspect Steam Generator for More Precise Reading on Occurrence & Reconstructing Circumstances of Event + (08:32:02, 3 December 2024)
- ML20235Y186 + (08:32:02, 3 December 2024)
- ML20235Y183 + (08:32:03, 3 December 2024)
- ML20235Y182 + (08:32:03, 3 December 2024)
- ML20235Y175 + (08:32:05, 3 December 2024)
- ML20235Y171 + (08:32:06, 3 December 2024)
- ML20235Y170 + (08:32:07, 3 December 2024)
- 05000424/LER-1987-038, :on 870620 & 25,shutdown Rod Banks Partially Withdrawn & Reactor Manually Tripped After Receipt of RPI Urgent Alarm Annunciator.Caused by Detector/Encoder Card Failure.Card Replaced + (08:32:09, 3 December 2024)
- ML20235Y163 + (08:32:09, 3 December 2024)
- ML20235Y153 + (08:32:11, 3 December 2024)
- ML20235Y152 + (08:32:11, 3 December 2024)
- ML20235Y150 + (08:32:12, 3 December 2024)
- IR 05000309/1987004 + (08:32:13, 3 December 2024)
- ML20235Y143 + (08:32:14, 3 December 2024)
- ML20235Y139 + (08:32:15, 3 December 2024)
- IR 05000322/1983011 + (08:32:16, 3 December 2024)
- ML20235Y136 + (08:32:16, 3 December 2024)
- ML20235Y133 + (08:32:17, 3 December 2024)
- 05000440/LER-1987-044, :on 870624 & 28,RCIC Sys Automatically Isolated.Caused by Pressure Oscillations in Rcic/Leak Detection High Flow Instrument Process Lines.Leaking Transmitter Test Connection Repaired + (08:32:19, 3 December 2024)
- ML20235Y128 + (08:32:19, 3 December 2024)
- ML20235Y124 + (08:32:20, 3 December 2024)
- ML20235Y123 + (08:32:21, 3 December 2024)
- ML20235Y117 + (08:32:22, 3 December 2024)
- ML20235Y116 + (08:32:23, 3 December 2024)
- 05000213/LER-1987-008, :on 870625,control Rod 31 Dropped Into Core & Overfeed to Steam Generator 2 Occurred.Caused by Faulty Fuse & Inadequate Maint Procedure,Respectively.Fuse Replaced & Procedure Revised + (08:32:25, 3 December 2024)
- PNO-IV-87-034, on 870720,turbine Trip/Reactor Trip Occurred W/Electrical Distribution Sys (345 Kv) Disturbance Occurring Prior to Trip.Trip Caused by Transformer Failure in Plant Switchyard.Transformer Investigation Under Assessment + (08:32:27, 3 December 2024)
- ML20235Y095 + (08:32:28, 3 December 2024)
- ML20235Y087 + (08:32:29, 3 December 2024)
- ML20235Y091 + (08:32:29, 3 December 2024)
- ML20235Y078 + (08:32:31, 3 December 2024)
- ML20235Y077 + (08:32:32, 3 December 2024)
- ML20235Y075 + (08:32:33, 3 December 2024)
- B12503, Forwards Revised Environ Qualification of Electrical Equipment Master List.Changes to Original List Due to Equipment Replacement & Clarification of Equipment/Component Certification Data + (08:32:34, 3 December 2024)
- ML20235Y064 + (08:32:36, 3 December 2024)
- ML20235Y060 + (08:32:37, 3 December 2024)
- ML20235Y059 + (08:32:37, 3 December 2024)
- ML20235Y057 + (08:32:38, 3 December 2024)
- ML20235Y052 + (08:32:39, 3 December 2024)
- ML20235Y049 + (08:32:40, 3 December 2024)
- ML20235Y051 + (08:32:40, 3 December 2024)
- ML20235Y048 + (08:32:41, 3 December 2024)