Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236G860 + (06:55:13, 3 December 2024)
- 05000456/LER-1987-033, :on 870702,control Room Ventilation Return & Makeup Fans Tripped During Monthly Surveillance Test.Caused by Inadvertent Power Shutoff to Dampers by Nonlicensed Personnel.Fans Restarted + (06:55:15, 3 December 2024)
- ML20236G857 + (06:55:15, 3 December 2024)
- W3P87-1736, Responds to Violations Noted in Insp Rept 50-382/87-08. Corrective Actions:Access to Change Accounts Removed from All Except Sys Manager & Access to programs,PE-34, Restricted + (06:55:16, 3 December 2024)
- 05000382/LER-1998-011, :on 980603,TS 3.0.3 Entry Was Noted.Caused by Component Cooling Water Makeup Check Valve Failing Ist. Operability of a Train of CCW Was Restored Immediately & Check Valve Internals Were Replaced + (06:55:18, 3 December 2024)
- ML20236G853 + (06:55:18, 3 December 2024)
- ML20236G850 + (06:55:19, 3 December 2024)
- ML20236G851 + (06:55:19, 3 December 2024)
- ML20236G849 + (06:55:20, 3 December 2024)
- ML20236G845 + (06:55:22, 3 December 2024)
- ML20236G846 + (06:55:22, 3 December 2024)
- ML20236G844 + (06:55:23, 3 December 2024)
- ML20236G843 + (06:55:24, 3 December 2024)
- ML20236G838 + (06:55:25, 3 December 2024)
- ML20236G841 + (06:55:25, 3 December 2024)
- BECO-87-123, Forwards Suppl to Tech Spec 4.3.C.1, Scram Insertion Times, Per NRC Request.Suppl Modifies Util 851115 Proposed Change by Requiring Operable Control Rods to Be Subjected to Scram Time Test After Reactor Shutdown + (06:55:26, 3 December 2024)
- ML20236G833 + (06:55:27, 3 December 2024)
- ML20236G834 + (06:55:27, 3 December 2024)
- ML20236G832 + (06:55:28, 3 December 2024)
- ML20236G830 + (06:55:28, 3 December 2024)
- ML20236G829 + (06:55:29, 3 December 2024)
- ML20236G824 + (06:55:30, 3 December 2024)
- ML20236G826 + (06:55:30, 3 December 2024)
- ML20236G823 + (06:55:31, 3 December 2024)
- ML20236G822 + (06:55:32, 3 December 2024)
- ML20236G819 + (06:55:33, 3 December 2024)
- 3F0798-02, Provides Notification That Two Related NRC Commitments Are Being Combined & Revised & That Due Date for New Commitment Is Being Extended,In Response to Violations Noted in Insp Rept 50-302/97-12 + (06:55:35, 3 December 2024)
- A98034, 1997 Annual 10CFR50.59 Summary Rept + (06:55:35, 3 December 2024)
- ML20236G816 + (06:55:36, 3 December 2024)
- ML20236G814 + (06:55:37, 3 December 2024)
- ML20236G812 + (06:55:37, 3 December 2024)
- ML20236G811 + (06:55:38, 3 December 2024)
- ML20236G808 + (06:55:39, 3 December 2024)
- ML20236G810 + (06:55:39, 3 December 2024)
- ML20236G806 + (06:55:40, 3 December 2024)
- LIC-98-0091, Forwards Fort Calhoun Station May 1998 Performance Indicators Rept + (06:55:41, 3 December 2024)
- TXX-6882, Interim Deficiency Rept CP-87-52 Re Apparent Inadequacy in Vendor Info Used as Design Input Which Could Result in Unsatisfactory Class 1E Battery Capabilities.Initially Reported on 870729.Next Rept Will Be Submitted by 880113 + (06:55:41, 3 December 2024)
- HBL-87-047, Forwards Rev 3 to Custodial Safstor Facility QA Plan.Changes Include Clarification of Sections Re Packaging & Transportation,Fire Rating of Storage Containers,Audit Frequency & Ref to Reg Guide + (06:55:42, 3 December 2024)
- TXX-6628, Advises That Util Will Not Adopt Rev 15 to Code Case N-71. Util Will Continue to Use Criteria of Rev 9 in Design of Plant Pipe Supports Fabricated from A500 Grade B (cold-formed) Structural Tube Shape + (06:55:43, 3 December 2024)
- U-603037, Provides Response to Violations Noted in Insp Rept 50-461/98-10.Corrective Actions:All Individuals Involved W/Incident Were Counseled by Supervisor - Radiological Operations on Expectations for Job Performance + (06:55:44, 3 December 2024)
- ML20236G791 + (06:55:44, 3 December 2024)
- 05000344/LER-1987-017, :on 870417,positive Pressure of 0.125 Inches of Water Could Not Be Maintained.Caused by Air Leakage Through Cable Penetrations in Control Room Floor.Operating Procedures Revised + (06:55:46, 3 December 2024)
- B17335, Submits Summary of Changes to & Errors Discovered in ECCS Evaluation Models or Applications of Models for Mnps,Unit 2, Per 10CFR50.46(a)(3)(ii) + (06:55:47, 3 December 2024)
- 05000413/LER-1998-007-01, :on 980608,missed TS Surveillance on Containment Penetration Testing Due to Literal Compliance Issue.Caused by Inappropriate Implementation of Staggered Test Requirement.Affected Penetrations Successfully Tested + (06:55:49, 3 December 2024)
- ML20236G779 + (06:55:49, 3 December 2024)
- ML20236G778 + (06:55:50, 3 December 2024)
- ST-HL-AE-2397, Forwards Description of Change in Initial Test Program,Per FSAR Section 14.Description Addresses Deletion of Reactor Upper Internals & Reactor Head Installation as Prerequisites to Moveable Incore Detector Sys Checkout Procedure + (06:55:51, 3 December 2024)
- ML20236G774 + (06:55:55, 3 December 2024)
- ML20236G771 + (06:55:55, 3 December 2024)
- ML20236G767 + (06:55:56, 3 December 2024)
- 1CAN108704, Application for Amend to License DPR-51,extending Term of License to 40 Yrs.Fee Paid + (06:55:57, 3 December 2024)