Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-9201, Submits Final Response to NRC Bulletin 88-008 Re Thermal Stresses in Piping Connected to RCS & Requests That Requirement to Record Data Be Suspended.Summary of Analysis Performed by Westinghouse on Subj Encl + (04:39:32, 26 May 2025)
- ML20092E558 + (04:40:17, 26 May 2025)
- PMNS20200295, Public Meeting Notice + (04:41:09, 26 May 2025)
- 05000282/LER-1995-011, :on 950809,deficiencies in Inservice Surveillance of Cooling Water Sys.Caused by Inadequate Review of ISI Interval That Ended 931216.Performed Hydrostatic Testing of CR Chiller Cooling Water Strainers + (04:41:56, 26 May 2025)
- 05000333/LER-1992-002, :on 920107,15,17,18,22 & 24,calculations Indicated That Valve Operator Design for motor-operated Valves Would Not Provide Adequate Valve Stem Thrust,Per Generic Ltr 89-10.Operator Declared Inoperable + (04:42:21, 26 May 2025)
- 05000387/LER-1984-012-01, Revised LER 84-012-01:on 840225,due Date & Violation Date Inadvertently Omitted from Cover Sheet of Quarterly Surveillance Procedure SI-072-301.Administrative Procedures Revised + (04:42:24, 26 May 2025)
- ML20092C843 + (04:42:27, 26 May 2025)
- ML20092C621 + (04:42:58, 26 May 2025)
- DCL-92-003, Forwards Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs. W/920207 Release Memo + (04:43:20, 26 May 2025)
- ML20092C375 + (04:43:24, 26 May 2025)
- 05000445/LER-1995-004-01, Forwards Suppl LER 95-004-001 for CPSES Unit 1,because Time Requirements for Action Statements Not Met,Per Enforcement Discretion for Testing Tdafwp at Mode 3,granted by NRC + (04:43:42, 26 May 2025)
- 05000244/LER-1992-001, :on 920105,containment Ventilation Isolation Occurred Due to Actuation Signal from Containment Particulate Radiation Monitor.Cause Is Unknown.Cvi Sys Returned to pre-event Status + (04:44:12, 26 May 2025)
- TAC:53255 + (04:44:17, 26 May 2025)
- TAC:42964 + (04:44:36, 26 May 2025)
- HL-1453, Application for Amends to Licenses DPR-57 & NPF-5,modifying Instrumentation SRs by Adding Action Statements Which Allow Instruments Channels to Be Inoperable for Required Surveillance Testing W/O More Restrictive Actions + (04:44:52, 26 May 2025)
- TXX-9202, Forwards Response to Reg Guide 9.3 Which Updates Activities That Have Occurred Since Antitrust Operating License Review, Per 911205 Request + (04:46:44, 26 May 2025)
- 05000324/LER-1982-121-03, Electrical Trip of Traverse in-core Probe (TIP) Drive Motor Occurred While TIP Detector Partially Inserted Into Core.Caused by Defective Tubing.Tubing Replaced + (04:46:50, 26 May 2025)
- 05000325/LER-1982-005-03, Chlorine Detectors 1-X-AT-2977 & 2-X-AT-2977 Did Not Properly Respond to Applied Test Signals.Caused by Out of Tolerance Response Time & Corrosion of Armature.Detectors Cleaned or Replaced + (04:47:14, 26 May 2025)
- 05000296/LER-1979-005, Updated LER 79-005/01T-2:on 790506,RHR Svc Water Supply to RHR HX 2B Isolated Standby Coolant Supply.Caused by Lack of Administrative Control Over Sys Cross Connect Valves. Controls Improved + (04:47:19, 26 May 2025)
- TAC:M79912 + (04:48:18, 26 May 2025)
- ML20091S333 + (04:48:41, 26 May 2025)
- 05000369/LER-1995-003, :on 950627,turbochargers Associated W/Edgs Failed Due to Design Oversight.Remaining Compressor Impellers Evaluated &/Or Replaced + (04:48:45, 26 May 2025)
- ML20091S175 + (04:48:52, 26 May 2025)
- ML20091S166 + (04:48:54, 26 May 2025)
- ML20091R702 + (04:49:45, 26 May 2025)
- ML20091R415 + (04:50:07, 26 May 2025)
- A09829, Informs That Review of Issues Re Facility Activities for Allegation RI-91-A-0210 Complete.Comments Encl + (04:51:52, 26 May 2025)
- 05000374/LER-1991-013, :on 911007,breaker for Supply Fan Tripped & Smoke Observed Coming Out of Switchgear .236X Compartment 302B.Caused by Overheating of Relay,Resulting in Mechanical Binding.Relay Replaced + (04:51:58, 26 May 2025)
- 05000387/LER-1984-017-01, Updated LER 84-017-01:on 840310,during Performance of Weekly Preventive Maint Activity,Spray Pond Riser Networks A-1 & B-2 Found Frozen.W/Advent of Mild Weather,Networks Thawed & Pumped down.Long-term Fixes Investigated + (04:52:34, 26 May 2025)
- TXX-9203, Interim Deficiency Rept CP-92-03 Re Potential Loss of RHR Due to Flooding of Pump Room.Initially Reported on 911126. Caused by Walkdown Sheet Failing to Address HVAC Vent. Reportability Evaluation Expected by 920227 + (04:52:49, 26 May 2025)
- ML20091P450 + (04:53:01, 26 May 2025)
- ML20091P443 + (04:53:04, 26 May 2025)
- IR 05000329/1982013 + (05:14:14, 26 May 2025)
- 05000416/LER-1984-020-01, Revised LER 84-020-01:on 840423,24 & 0514,during Startup, Five Reactor Water Cleanup Sys Isolations Occurred Due to Feedwater Flow Oscillations + (05:15:45, 26 May 2025)
- ML20091P254 + (05:16:23, 26 May 2025)
- ML20091P252 + (05:16:28, 26 May 2025)
- ML20091P059 + (05:17:04, 26 May 2025)
- ML20091N420 + (05:18:08, 26 May 2025)
- ML20091N387 + (05:18:12, 26 May 2025)
- ML20091N292 + (05:18:31, 26 May 2025)
- ML20091N264 + (05:18:37, 26 May 2025)
- ML20091N259 + (05:18:39, 26 May 2025)
- 05000327/LER-1984-034, :on 840509,valve 1-67-537B Found Mispositioned When Valves 1-FCV-67-123 & 1-FCV-67-124 Opened.Caused by Valve Being Closed Since 840424.Valve Throttled to Proper Position + (05:18:50, 26 May 2025)
- ML20091N215 + (05:19:01, 26 May 2025)
- 05000373/LER-1984-025, :on 840517,trapdoor on Auxiliary Bldg Roof Neither Posted as High Radiation Area Nor Secured to Prevent Unauthorized Entry.Entrance Posted as High Radiation Area, Access Controlled & Door Secured + (05:19:03, 26 May 2025)
- ML20091N203 + (05:19:09, 26 May 2025)
- ML20091N137 + (05:19:17, 26 May 2025)
- ML20091N119 + (05:19:23, 26 May 2025)
- ML20091N103 + (05:19:25, 26 May 2025)
- ML20091N089 + (05:19:27, 26 May 2025)
- ML20091N060 + (05:19:31, 26 May 2025)