Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2025-020, License Amendment Request 279, Extend Surveillance Test Intervals in Support of Transition to 24 Month Fuel Cycles + (01:18:40, 26 March 2025)
- ML25062A183 + (01:18:43, 26 March 2025)
- IR 05000482/2024006 + (01:18:44, 26 March 2025)
- IR 05000313/2024006 + (01:18:46, 26 March 2025)
- EPID:L-2025-LLA-0028 + (01:18:47, 26 March 2025)
- ML25062A174 + (01:18:48, 26 March 2025)
- EPID:L-2025-LLR-0021 + (01:18:49, 26 March 2025)
- ML25062A170 + (01:18:50, 26 March 2025)
- IR 05000498/2024006 + (01:18:51, 26 March 2025)
- BVY 25-008, Pre-Notice of Disbursement from Decommissioning Trust + (01:18:53, 26 March 2025)
- IR 05000483/2024006 + (01:18:55, 26 March 2025)
- CNL-25-036, Correction to Organization Topical Report, TVA-NPOD89-A, Revision 26 + (01:19:00, 26 March 2025)
- IR 05000275/2024006 + (01:19:02, 26 March 2025)
- ML25062A130 + (01:19:04, 26 March 2025)
- ML25062A127 + (01:19:06, 26 March 2025)
- ULNRC-06930, Correction to Relief Request Iwe-02 Regarding Inservice Inspection Requirements of ASME Boiler Pressure Vessel Code, Section XI for Instrument Tunnel Sump Liner + (01:19:07, 26 March 2025)
- IR 05000445/2024006 + (01:19:09, 26 March 2025)
- IR 05000397/2024006 + (01:19:11, 26 March 2025)
- 05000390/LER-2025-001, Loss of the Control Room Emerency Air Temperature Control System Due to Chiller Oil Migration + (01:19:15, 26 March 2025)
- ML25062A062 + (01:19:17, 26 March 2025)
- BVY 25-005, Nuclear Onsite Property Damage Insurance + (01:19:18, 26 March 2025)
- ML25062A049 + (01:19:20, 26 March 2025)
- PNP 2025-005, 50-Year Containment Tendon Surveillance Inspection Summary Report + (01:19:28, 26 March 2025)
- ML25061A007 + (01:19:30, 26 March 2025)
- ML25061A006 + (01:19:31, 26 March 2025)
- ML25061A005 + (01:19:32, 26 March 2025)
- ML25061A004 + (01:19:33, 26 March 2025)
- ML25060A005 + (01:19:35, 26 March 2025)
- ML25060A004 + (01:19:36, 26 March 2025)
- ML25059A413 + (01:19:39, 26 March 2025)
- ML25059A411 + (01:19:40, 26 March 2025)
- ML25059A407 + (01:19:41, 26 March 2025)
- ML25059A311 + (01:19:51, 26 March 2025)
- ML25059A282 + (01:19:55, 26 March 2025)
- ML25059A249 + (01:20:00, 26 March 2025)
- ML25059A240 + (01:20:02, 26 March 2025)
- ML25059A239 + (01:20:03, 26 March 2025)
- RCF 25-01, Operations Report for the Rensselaer Polytechnic Institute Reactor Critical Facility, NRC License CX-22, Docket Number 50-225 + (01:20:04, 26 March 2025)
- IR 05000326/2025201 + (01:20:14, 26 March 2025)
- ML25059A168 + (01:20:17, 26 March 2025)
- ML25059A167 + (01:20:18, 26 March 2025)
- ML25059A166 + (01:20:19, 26 March 2025)
- IA-24-019, Notice of Violation, NRC Investigation Report 4-2024-009 + (01:20:22, 26 March 2025)
- ML25059A119 + (01:20:24, 26 March 2025)
- L-MT-25-009, Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4. + (01:20:27, 26 March 2025)
- ML25059A093 + (01:20:30, 26 March 2025)
- IR 05000280/2025401 + (01:20:32, 26 March 2025)
- ML25059A072 + (01:20:34, 26 March 2025)
- ML25059A069 + (01:20:35, 26 March 2025)
- DCL-2025-502, (Dcpp), 2024 Annual Sea Turtle Report + (01:20:42, 26 March 2025)
- ML25059A039 + (01:20:53, 26 March 2025)