IR 05000280/2025401

From kanterella
Jump to navigation Jump to search
Material Control and Accounting Program Inspection Report 05000280/2025401 and 05000281/2025401 (Public)
ML25059A073
Person / Time
Site: Surry  
Issue date: 02/24/2025
From: James Baptist
Division of Operating Reactors
To: Carr E
Virginia Electric & Power Co (VEPCO)
References
IR 2025401
Download: ML25059A073 (1)


Text

SUBJECT:

SURRY POWER STATION - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000280/2025401 AND 05000281/2025401

Dear Eric S. Carr:

On January 30, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station and discussed the results of this inspection with David Wilson, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

February 24, 2025 The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, James B. Baptist, Chief Projects Branch 4 Division of Operating Reactor Safety Docket Nos. 05000280 and 05000281 License Nos. DPR-32 and DPR-37 Enclosure:

As stated cc w/o encl: Distribution via LISTSERV Signed by Baptist, James on 02/24/25

MLXXXXXXXXX (Cover letter)

Cover Letter Only:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RII/DORS RII/DORS RII/DORS NAME C. Even D. Jung J. Baptist DATE 2/24/25 2/24/25 2/24/25