Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000335/1997005 + (07:09:04, 24 May 2025)
- ML20202E008 + (07:09:16, 24 May 2025)
- IR 05000312/1986007 + (07:09:19, 24 May 2025)
- IR 05000321/1996010 + (07:09:20, 24 May 2025)
- ML20202D948 + (07:09:31, 24 May 2025)
- ML20202D930 + (07:09:36, 24 May 2025)
- IR 05000338/1997001 + (07:09:37, 24 May 2025)
- 05000354/LER-1997-023-01, Forwards LER 97-023-01 Re Core Spray Nozzle Weld through- Wall Leak.Commitments Made by Util,Encl + (07:09:48, 24 May 2025)
- IR 05000369/1997001 + (07:09:55, 24 May 2025)
- 05000266/LER-1998-002, :on 980108,failure of High Voltage Station Auxiliary Transformer Occurred Due to Ground in Low Voltage Side Bus Duct.Operability of 1X03 Was Restored & Verified to Be in Operation by Infrared Scan + (07:10:03, 24 May 2025)
- NPL-98-1032, Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld + (07:10:05, 24 May 2025)
- ML20202D778 + (07:10:21, 24 May 2025)
- ML20202D744 + (07:10:29, 24 May 2025)
- IR 05000302/1997016 + (07:11:10, 24 May 2025)
- IR 05000312/1986013 + (07:11:21, 24 May 2025)
- IR 05000455/1985027 + (07:11:31, 24 May 2025)
- ML20202D650 + (07:11:35, 24 May 2025)
- IR 05000313/1985011 + (07:11:53, 24 May 2025)
- A05549, Informs That Qualified Shift Advisor Utilized During Start & Initial Operations,Per License Condition 2.C(9).Operating Staff Experience Requirements W/O Use of Shift Advisors Will Be Met on 860715.Summary of Plant Operating History Encl + (07:11:54, 24 May 2025)
- IR 05000338/1998301 + (07:12:11, 24 May 2025)
- ML20202D435 + (07:12:35, 24 May 2025)
- ML20202D425 + (07:12:37, 24 May 2025)
- ML20202D396 + (07:12:43, 24 May 2025)
- ML20202D316 + (07:13:02, 24 May 2025)
- ML20202D293 + (07:13:06, 24 May 2025)
- ML20202D268 + (07:13:12, 24 May 2025)
- 05000373/LER-1997-042-01, Forwards LER 97-042-01,which Is Being Submitted to NRC Office to Update Safety Analysis.Commitments Made by Ltr, Listed + (07:14:22, 24 May 2025)
- 05000254/LER-1998-003, :on 971210,TS LCO Was Exceeded When SBGT Subsystem Was Inoperable Because EDGs Was Inoperable.Caused by Inadequate Procedure Development & Review.Correctly Positioned Valve & Revised Procedure + (07:14:24, 24 May 2025)
- ML20202D003 + (07:14:56, 24 May 2025)
- IR 05000456/1997015 + (07:15:02, 24 May 2025)
- IR 05000315/1997019 + (07:15:06, 24 May 2025)
- ML20202C974 + (07:15:08, 24 May 2025)
- IR 05000440/1997012 + (07:15:26, 24 May 2025)
- 05000338/LER-1998-001, :on 980108,determined That Potential to Miss Interlock Logic Surveillance Testing During Previous mid- Cycle Shutdowns Existed.Caused by Inadequate Test Design Supplied by Vendor.Info from Last Startup Reviewed + (07:15:55, 24 May 2025)
- ML20202C786 + (07:16:07, 24 May 2025)
- NUREG-1152, Forwards NUREG-1152, Millstone 3 Risk Evaluation Rept. W/O Encl + (07:16:20, 24 May 2025)
- 05000336/LER-1998-001, :on 980108,ongoing Engineering Evaluations of Fault Clearing & Fuse Coordination for Vital 120 Volt AC Sys Occurred.Caused by Incomplete Engineering Evaluation of Fault Clearing.Changes Will Be Implemented + (07:16:33, 24 May 2025)
- TAC:55222 + (07:17:23, 24 May 2025)
- ML20202C579 + (07:17:28, 24 May 2025)
- TAC:53166 + (07:17:34, 24 May 2025)
- ML20202C498 + (07:17:48, 24 May 2025)
- IR 05000254/1996017 + (07:18:23, 24 May 2025)
- IR 05000313/1997019 + (07:18:36, 24 May 2025)
- ML20202C341 + (07:18:46, 24 May 2025)
- IR 05000254/1997006 + (07:19:05, 24 May 2025)
- IR 07100016/2011014 + (07:19:10, 24 May 2025)
- IR 05000010/1997009 + (07:21:42, 24 May 2025)
- IR 05000254/1997008 + (07:22:02, 24 May 2025)
- ML20202C114 + (07:22:26, 24 May 2025)
- ML20202C058 + (07:22:39, 24 May 2025)
- ML20202B993 + (07:22:53, 24 May 2025)