ML20202D435

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/97-17.Reply Found to Be Responsive to NRC Concern About Emergency Operating Procedures
ML20202D435
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/03/1997
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
50-382-97-17, NUDOCS 9712050023
Download: ML20202D435 (6)


See also: IR 05000382/1997017

Text

-.

. . _ _ . . . .

-.

. _ _ . _ . _ _ . .

_

. . _ . -

, . -

/p?'*'Out,k

t

=

uQ$1 TE D ST ATE S -

NUCLEAR REGULATORY COMMISSICN

,

_.

.

-

.

. .

!*

I

REotoN IV -

611 RY AN PLAZA oRIVE. SulrE 400-

,-

,,

.I't, . . . ' ' . * .#'

- ARLINGTON. TEXAS 76011 8064

-i

!

r

!

!

December 3,1997

-_

-

Charles M. Dugger, Vice President .

Operations - Waterford 3

Entergy Operations, Inc.

- P.O. Box B

Killona, Louisiana 70066

a

SUBJECT: NRC INSPECTION REPORT 50-382/9717

- Dear Mr. Dugger:

-

Thank you for your letter of November 24; 1997, in response to our letter and Notice of

Vi >Iation dated October 23,1997, We have reviewed your reply and find it responsive to our

concern about emergency operating procedures raised in our Notice of Violation. We wili review

the implementation of your ccrrective actions during a future inspection to determine that full

r

compliance has been achieved and will be maintained.

Sincerely,

hG

John L. Pellet, Chief

Operations Branch

Division of Reactor Safety

/

Docket'No.: 50-382

License No.: NPF 38

l

cc:

Executive Vice President and

Chief Operating Officer

/

Entergy Operations. Inc.

P.O. Box 31995

Jackson. Mississi. pi 39286 1995

o

9712050023 971203

7

PDR

ADOCK 05000302

0

pg

.

1

-

,<s,

-

- ---

--

- - - .-

- - --.- - --

. .---- ------. -

.

.- - -- - --

- - -

,

_ _, .

. _ . . _ . . _ .

_

_

m.

._ _

.. .

.

.___.. .

m.

_ .. . . _ _ . _

__ __ .

_

'

.

-

,

2-

Entergy Operationsiinc.

-

,

L Vice President [ Operations Support -

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995-

-

t

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

General Manager, Plant Operations .

-

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Manager Licensing Manager

'

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Chairman

,

Louisiana Public Service Commission

One American Place, Suite 1630

'

Baton Rouge, Louisiana 70825-1697

Director, Nuctsar Safety &

..

Regulatory Affairs

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

William H.-Spell, Administrator

lo 'isiana Radiation Protection Division

P.O. Box 82135

'

Baton Rouge, Louisiana 70884-2135

Parish President

St Charles Parish-

P.O. Box 302 -

Hahnville; Louisiana --70057

.

4

-

a

arr+-eaiD

e

e---us--n

-w

-meea.

-eb

%

4w,+

f'e*

w

w

- --

w

v,*--e

e=

mee

m--

ee-e-++~~

+ - - + =

.

-

  • ' - ~ *

- - . .- - . _ . . _. .

.

- ,

.. .._

_ _.. , ,

. . ,_ - . . _.,_ _ . _ . .._ _ . . _. . ... .

.- ..

.

_-

. . =

3-

'

'

Entergy Operations, Inc,

.

. .

- 4

,

.

- Mr. William A. Cross -

. Bethesda Licensing Office-

' 3 Metro Center

Suite 610

- Bethesda, Maryland 20814 -

-

i

i

-Winston & Strawn -

~

- .1400 L Street, N.W.

. Washington, D.C. 20005-3502

- ,

'

,

W

h

s-

f

7

e

Y

s

(

.r

k

4

s

J

+

+b

m

m

se

-Ww.,%

ew-

r

+e-en-

ew

a - " = - -

.4-

'-w ee-v

w

--ea+--

+ - -

7

s-e--.c

w

~

--*.. +

- -

.-

.

. _ .

..

.---

-

-

- ~ . - . . . . - - - -.

.

--.

.- .

4

.

Entergy Operations, Inc.

-4-

E-Mail report to T. Frye (TJF)

-

E-Mail report to T. Hiltz (TGH)-

E-Mail report to NRR Event Tracking System (IPAS) .

E Mail report to Document Control Desk (DOCDESK)

4

bec to DCD ('E01)(IE42)

bec distrib. by RIV:

4

Regional Administrator

Resident inspector

DRS Director

DRS Deputy Director

4

DRP Director

DRS-PSB

,

- Branch Chief (DRP/D)

MIS System

i

Project Engineer (DRP/D)

RIV File

Branch Chief (DRP/TSS)

i

4

4

J

8

4

DOCUMENT NAME: R:\\_WAT\\WT717ak.jlp

To receive copy of document. Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

-

C:OB

0,

JLPELLET /)?/

12/$/97

'

OFFICIAL RECORD COPY

,

,

,

,_ +

-*_.,...

~ _,.

. . . _ ,

.-,

_

. - . .

_ _ _ . . . .

m

-

_ - _ - _ _ - _ _ _ _ _ _ _ _ _ _

o

.

Entergy Operations, Inc.

-4-

E-Mai! report to T. Frye (TJF)

E Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE21)(ik2)-

L

bec distrib, by RIV:

Regional Administrator

Resident inspector

DRS Director

DRS Deputy Director

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File

Branch Chief (DPP/TSS)

DOCUMENT NAME: R:\\_WAT\\WT717ak.jlp

To receive copy of document, indicate in box:"C" = Copy without enclosures "E" a Copy wdh enclosures "N" = No copy

C:OB

0,

l

l

JLPELLET Q}/

'

12/$/97

~

OFF!CIAL RECORD COPY

,an0C3

,

i

k

t

I

--

-

.

Ec-01-of 18:40 'Fros:ENTERGY QPERATICNS

5047396t90

T-350 P.02/0 JoH l4

- y- Ent W

M ~~~~

.

uwa

g-ge.

..

g.y s w.wn-,

W3F1-97-0260

A4.05

PR

l

November 24,1997

U.S. Nuclear Regulatory Commission

,

'

ATTN: Document Control Desk

Washington, D.C. 20555

Subject:

Waterford 3 SES

Docket No. 50-382

,

License No. NPF-38

NRC Inspection Report 50-382/97-17

Reply to Notice of Violation

Gentlemen-

In accordance with 10CFR2.201, Entergy Operations, Inc. hereby submns in

Attachment 1 the response to the violatica identified in Enclosure 1 of the sut' ject

inspection Report.

if you have any questions concoming this response, please contact

me at (504) 739-8242 or T.J. Gaudet at (504) 739-6666.

Very truly yours,

-

E.C. Ewing

Director,

Nuclear Safety & Regulatory Affairs

ECE/OPPlasf

Attachment

-

cc:

E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

-

J. Smith, N.B. Reynoide, NRC Restdont Ins.pectors Office

.

J

k')llM ::! ir

3W

_.

._ _

_ _ _ .

. _ _ . . _ . _

.__.__

._

_ _

. _ _ _ . _ _ _ .

_ _ . _ . _ _ _

DEC-01-Ifc13:40 - Fros:tRTERGY GPERAT40Mt

50478tC680

T458 P.03/05 Job-ll4 '

,

.-

.

'

.

,.

'

NRC Inspection Report 97-17

RepW to Notice of Violation

W3F197 0260

Page 2

"

Novemoor 24,1997

oc: Mail:-

D.C. Hintz :

(M-ECH46)

,

J.W Yelverton

(M-ECH45) ~

l

!

C.M. Dugger

(W.G88-300)

T.R. Leonard

(W-MSB4-300)

F.J. Drummond

(W G85-305)

A..l. Wrape

(W-GSB-315)

.

G.D. Pierce -

(W-ADM-686)-

R.E. Allen

(W-G88-102)

B.E. Meyers

(W-ADM-565)

J.J. Zabritski .

(W4M-567)

,

J.G. Hoffpauir

(W-MSB4-336)

J.G. Dewease

(M-ECH46) -

.

L.F. Daughtery

(GGNS - ADMILIC)

S.J. Bethey -

C.A. Bottomiller

T.W. Gates

.

T.J. Goudet

K. Godfrey

C. Gunn

-

W.K.Hughey

IEA

4

f

R.J. King

D.N. Lorfing

J.M. Manzella

D.C. Mims (ANO)

R. Thomas

bec:

SRC Secretary -

(W-GSB-102)

T.J. Sibley

_

(W-GSB-318)

Waterford 3 Records Center

(W-G08-100)

,

NRC Inspootion Report 97-17

Licensing Green Folder File

c

e

--

.

_ _ _ , . , _ _ _ _ _

,,

. . . _ _ _ ,

, _ _ , _ . ,

__

__

-

DEC-01*S? 13:40 Froa: ENTER 1Y QPERA? IONS

504?396698

T-358 P.04/05 h b-!$4

N5F15E5550

5

Page 1 of 2

,

ATTACHMENT 1

ENTERGY OPERATIONS. INC. RESPONS'i TO THE VIOLATION IDENTIFIED IN

EMCLOSURE 1 OF INSPECTION REPORT 50-382/97-17

VIOt.ATION NO. 9717-01

Technical Specification 6.8.1.a states, in part that written procedures shall be

established, implemented, and maintained covering emergency operating

procedures.

Subprocedure V, " Containment Isolation,' of the licensee's Emergency Operating

Procedure OP 902-008, Revision 10, contair,ed instructions necessary to satisfy the

success path for the containment isolation safety function.

The licensee had completed recent moditications to the plant, which pxmitted

overriding a containment spray permissive signal to allow the operators to cicse

Containment Spray Valves CS-125A(B) in order to isolate the containment and

satisfy the safety function success path.

Contrary to the above, written procedures were not maintained for en)ergency

operating procedures in that the Itcenses failed to revise the Emergency Operating

Procedure OP-902-008 following valve modifications to provide the operators with

adequate instruction for closing Containment Spray Valves CS125A(B) to isolate the

Containment.

This is a Severity Level IV vielation (Supplement I) (50-382/9717-01).

RESPONSE

~

(1)

Reason for the Violation

Entergy attributes the violation to a combination of the inefficient location of

procedural guidance and to the lack of clearly defined management

expectations for Operations in this area. Entercy a0rees that appropriately

located procedural guidance is needed to ensure the proper and appropriate

operation of Containment Spray Valves (CS-125A(B)). The location of the

procedural guidanca in an Emergency Planning Procedure (EP-002-100,

Revision 25, Attachment 7.12) versus in an 5mergency Operating Procedure

(OP-902-008) was a conscious decision, which had been reached after much

deliberation. Waterford 3 is committed to meeting the strategies for

Emergency Operating Procedures outlined in CEN-162, CE Emergency

Operating Procedure Guidelines. The NRC approved the use of the

strategies in CEN-152 Revisions 03 and 04. The strategies that CE

recommends in the guidelines do not include specific steps to iriate

containment in the case of equipment failure (e.g. a Containe.< ' Jpray Pump

_ _ _ _ _ -

_ __ . _ . _ . , .

. _ _ _ . _ _ _ . _ _ _ _ _ . _ _ _ . _ . _ . _ _ . _ _ _ . _ _

DEC-C H T 18141 1Ftre:lNTERGY GPERAfl0M$

50409808

Mll P.06/06 Job-494

~*

'

mm., ., n.i e w

.

'

W3F1-97 0260

Page 2 of 2

, - -

not running).7 The Safety Function Success Path for containment isolation in -

,

the Fundlunal Recovery Guideline (CEN-152) states to ensure an isolation

valve is clossd for each containment penetration required to be closed. The

,

Waterford 3 Safety Function Recovery Procedura (OP-902 008) states that et

1

'

least one containment isolation valve must be closed for sech containment

penetration not in usec The EOPs are written assuming that safety-equipreent

s

is operable and will perform its intended function. - To assume safety-related

equipment failures in developing EOPs would drastically increase the volume -

,

c

- of information necessary in the body of the E0Ps, thus potentially increasing -

operator complication ar'd response time. Based on the above

considerations, we have assessed that the procedural guidance would more

appropriately ba located in a standard appendices to the EOPs rather than in

the body of the EOPs.

It should be noted that the NRC is currently evakating Entergy's position on

'

the Containment Spray Containment isolation Vatves presentad at the

Enforcement Conference held in Ariington, Texas on July 29,1997. Final

'

resolution tan that issue la pending. Waterford 3 will address the results

accordingly.

j

.

(2)

Corrective Stans That Have Baan Takan and the Resulta Achieved

H

!

Operating crews have been briefed on the violation scenario in various

Operations Department meetings and are awere of the current location of the

subject procedural guidance and management's expectations in that regard.

,

(3)

Corrar*ive Bi= = Which Will Be Taken to Avoid Further Violations

i-

Waterford 3 has plans to develop a standard appendices to the EOPs

.

wherein guidance will be included to provide dinction to the operators for

closing Containment Spray Valves CS 125A(B) with Containment Spray

Pumps not running. The Operator imining program will include training for

the Operators on the new standard appendices.

.

,

'

(4)

Date When Full Compliance Will Be Achieved

The EOP standard appendices will be completed by June 30,1996.

Operations Training inclusion of the appendices in the treining program will

l

be completed by August 31,'1998.

,

,

'

-

r

.

1

-

.

- -

-

. -

-

..