Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML030580492 + (02:53:24, 24 March 2020)
- LR-N03-0003, Request for Change to TS Recirculation Pump Trip Actuation Instrumentation Hope Creek Generating Station Facility Operating License NPF-57, Docket No.50-354 + (02:53:33, 24 March 2020)
- TAC:MB2428 + (02:55:34, 24 March 2020)
- ML030580460 + (02:57:17, 24 March 2020)
- DCL-03-017, Revised Steam Generator Voltage-Based Repair Criteria Probability of Detection Method for Diablo Canyon Unit 2 Cycle 12 + (02:57:26, 24 March 2020)
- ML030580424 + (02:57:50, 24 March 2020)
- ML030580419 + (02:59:20, 24 March 2020)
- ML030580375 + (03:01:18, 24 March 2020)
- ML030580370 + (03:01:30, 24 March 2020)
- TAC:MB5850 + (03:01:36, 24 March 2020)
- TAC:MB6391 + (03:07:18, 24 March 2020)
- TAC:MB4976 + (03:08:54, 24 March 2020)
- ML030580049 + (03:09:08, 24 March 2020)
- ML030580043 + (03:09:15, 24 March 2020)
- TAC:MB7785 + (03:12:39, 24 March 2020)
- TAC:MB6684 + (03:13:14, 24 March 2020)
- ML030570535 + (03:14:29, 24 March 2020)
- ML030570503 + (03:16:22, 24 March 2020)
- ML030570323 + (03:16:56, 24 March 2020)
- TAC:MC2525 + (03:17:58, 24 March 2020)
- TAC:MC0631 + (03:18:12, 24 March 2020)
- ML030570288 + (03:19:17, 24 March 2020)
- TAC:MB6183 + (03:19:24, 24 March 2020)
- NL-03-026, Refueling Outage Inservice Inspection (ISI) Program Summary Report - Third Outage, Second Period, Third Interval + (03:19:38, 24 March 2020)
- ML030570023 + (03:21:51, 24 March 2020)
- L-PI-03-014, Emergency Plan Implementing Procedures + (03:22:07, 24 March 2020)
- PNO-I-03-003, Unusual Event Due to a Safety Injection Signal & Closure of the Main Steam Isolation Valves (39616) + (03:24:02, 24 March 2020)
- ML030560879 + (03:25:39, 24 March 2020)
- ML030560878 + (03:25:52, 24 March 2020)
- L-PI-03-011, License Amendment Request (LAR) Dated February 11, 2003 Technical Specification 5.5.9, Ventilation Filter Testing Program (VFTP) Enhancements + (03:35:04, 24 March 2020)
- ML030560738 + (03:37:31, 24 March 2020)
- ML030560703 + (03:38:07, 24 March 2020)
- TAC:MB0265 + (03:38:24, 24 March 2020)
- ML030560671 + (03:38:42, 24 March 2020)
- TAC:MB4692 + (03:38:58, 24 March 2020)
- BSEP 03-0023, LER 2002-02-00 from Brunswick, Unit 2 Regarding Remote Shutdown Panel Power Supply Inventer Design Deficiency + (03:39:36, 24 March 2020)
- RS-05-062, Additional Information Supporting the Request for License Amendment Related to 21-Month Fuel Cycle + (03:40:22, 24 March 2020)
- ML030560639 + (03:40:42, 24 March 2020)
- ML030560632 + (03:40:54, 24 March 2020)
- TAC:MB6299 + (03:42:35, 24 March 2020)
- 3F0203-05, License Amendment Request 274, Revision 0, Containment Isolation Valves + (03:44:29, 24 March 2020)
- ML030560547 + (03:45:24, 24 March 2020)
- TAC:MB5087 + (03:45:28, 24 March 2020)
- ML030560407 + (03:48:26, 24 March 2020)
- NLS2003025, Emergency Plan Implementing Procedures + (03:49:28, 24 March 2020)
- ML030560380 + (03:49:51, 24 March 2020)
- TAC:MB7265 + (03:50:59, 24 March 2020)
- ML030560264 + (03:52:33, 24 March 2020)
- L-03-027, January 2003 Monthly Operating Report for Beaver Valley Power Station + (03:52:48, 24 March 2020)
- NG-03-0114, January 2003 Monthly Operating Report for Duane Arnold Energy Center + (03:53:38, 24 March 2020)
- ML030560093 + (03:55:24, 24 March 2020)