Category:Inservice/Preservice Inspection and Test Report
MONTHYEARCNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472023-07-0303 July 2023 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML23171A9132023-06-20020 June 2023 Amse, Section XI, Fifth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report ML23171A9572023-06-20020 June 2023 Replacement Steam Dryer Visual Inspection Results (U2R22) ML23025A0752023-01-25025 January 2023 American Society of Mechanical Engineers, Section XI, Third 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report Cycle . ML23024A1632023-01-24024 January 2023 Replacement Steam Dryer Visual Inspection Results (U1R14) ML22182A1632022-07-0101 July 2022 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner'S Activity Report for Browns ML21202A2422021-07-21021 July 2021 American Society of Mechanical Engineers, Section XI, Fifth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner'S Activity Report for Browns Ferry Nucle ML21201A3112021-07-20020 July 2021 Replacement Steam Dryer Visual Inspection Results ML21036A1532021-02-0505 February 2021 Owner'S Activity Report for Cycle 13 Operation ML21032A1302021-02-0101 February 2021 Replacement Steam Dryer Visual Inspection Results (U1R13) ML20176A3652020-06-24024 June 2020 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner'S Activity Report for Browns Ferry Nucl CNL-20-019, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Request for Alternative 0-ISI-472020-02-28028 February 2020 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Request for Alternative 0-ISI-47 ML19190A0722019-07-0909 July 2019 American Society of Mechanical Engineers, Section XI, Fifth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner'S Activity Report for Browns Ferry Nucle ML19051A0182019-02-20020 February 2019 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report Cycle 12 Operation CNL-18-123, Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-272018-12-27027 December 2018 Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-27 ML18186A6042018-07-0505 July 2018 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Browns Ferry Nuclear Plant, Unit 3, Cycle 1 CNL-18-080, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-Year Interval Request for Relief for 1-ISI-28 and 1-ISI-292018-05-31031 May 2018 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-Year Interval Request for Relief for 1-ISI-28 and 1-ISI-29 ML17180A3862017-06-29029 June 2017 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Browns Ferry Nuclear Plant, Unit 2, Cycle 1 CNL-17-013, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 3 Third Ten Year Interval Request for Relief for 3-ISI-28 and 3-ISI-292017-01-31031 January 2017 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 3 Third Ten Year Interval Request for Relief for 3-ISI-28 and 3-ISI-29 ML16176A2842016-06-24024 June 2016 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 17 Operation ML15190A3302015-07-0909 July 2015 ASME Section XI, Lnservice Inspection, System Pressure Test, Containment Lnservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 18 Operation ML15028A4032015-01-27027 January 2015 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 10 Operation ML14260A3652014-09-12012 September 2014 3 - ASME, Code Section XI-Inservice Inspection Program for the Unit 1 Second Ten-Year Inspection Interval, Unit 2 Fourth Ten-Year Inspection Interval and Unit 3 Third Ten-Year Inspection Interval, Request for an Alternative. ML14169A4042014-06-16016 June 2014 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Browns Ferry Plant, Unit 3, Cycle 16 Operat ML14056A2682014-02-11011 February 2014 ASME, Section XI Code, Inservice Inspection Program for Unit I Second Ten-Year Inspection Interval, Unit 2 Fourth Ten-Year Inspection Interval, and Unit 3 Third Ten-Year Inspection Interval, Request for Relief ISI-44 ML13291A3842013-10-0202 October 2013 Inservice Testing Program for the Fourth Ten Year Interval ML13256A1012013-09-11011 September 2013 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Independent Spent Fuel Storage Installation ML13253A1392013-08-0202 August 2013 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 17 Operation ML13119A3862013-04-29029 April 2013 Ti 182 RFI 2013003_AS Doc ML13067A4012013-03-0101 March 2013 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection and Repair and Replacement Programs - Owner'S Activity Report for Cycle 9 Operation ML12240A1052012-08-24024 August 2012 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 15 Operation ML12150A3672012-05-24024 May 2012 American Society of Mechanical Engineers, Section Xl Code, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-ISI-28 ML11189A1122011-07-0606 July 2011 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 16 Operation ML1108300372011-03-21021 March 2011 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection Program, Third Ten-Year Inspection Interval, Request for Relief 3-ISI-26 ML1102603952011-01-21021 January 2011 American Society of Mechanical Engineers, Section XI Inservice Inspection Program for the Unit 3 Third Ten-Year Inspection Interval, Request for Relief 3-ISI-25 ML1018705992010-07-0101 July 2010 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, Inservice Inspection Program, Request to Use Subsequent Edition of ASME Section Xl Code for Repair and Replacement Activities ML1014700692010-05-24024 May 2010 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, System Pressure Test Program for the Fourth 10-Year Inspection Interval ML1009205422010-03-31031 March 2010 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, Inservice Inspection Program for the Fourth Ten-Year Inspection Interval ML1005704132010-02-24024 February 2010 American Society of Mechanical Engineers, Section Xl, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-1S1-18, Revision 2 ML1004801252010-02-11011 February 2010 American Society of Mechanical Engineers, Section XI Inservice Inspection Program for Unit 1 Second Ten-Year Inspection Interval, Request for Relief 1-ISI-26, Risk-Informed Inservice Inspection Program ML1001917972010-01-15015 January 2010 American Society of Mechanical Engineers, Section XI Inservice Inspection Program for Browns Ferry Unit 1 Second Ten-Year Inspection Interval and Units 2 & 3 Third Ten-Year Inspection Interval, Request for Relief ISI-23 ML0928005122009-10-0505 October 2009 Comments Regarding NRC Letter and Associated Safety Evaluation for the Browns Ferry Nuclear Plant, Unit 2, Inservice Inspection Program Related to Examination of Piping Weld Overlays ML0926606142009-09-21021 September 2009 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs - Summary Report for Cycle 15 Operation ML0928707662009-09-17017 September 2009 Response to NRC Request for Additional Information for Third 10-Year Interval Inservice Inspection Program Plan, Relief Request 2-ISI-19, Revision 1 ML1019002472009-07-0707 July 2009 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs - Summary Report for Cycle 14 Operation ML0914702082009-05-22022 May 2009 American Society of Mechanical Engineers (ASME) Section Xl, Inservice Inspection Program for the Third Ten-Year Inspection Interval - Request for Relief 2-1Sl-21, Revision 1 - Resubmittal ML0913906422009-05-18018 May 2009 American Society of Mechanical Engineers Section XI, Inservice Inspection Program - Request for Relief 2-ISI-21, Revision 1 - Examination of Piping Weld Overlays ML0907808612009-03-0202 March 2009 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Third Ten-year Inspection Interval - Request for Relief 2-ISI-19, Revision 1 ML0906304232009-03-0202 March 2009 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inspection (IWE, and Repair and Replacement Programs - Summary Reports for Cycle 7 Operation 2023-07-03
[Table view] Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 February 14, 2003 10 CFR 50.55a(g) (5)iii U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop OWFN, Pl-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket No. 50-260 Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 2 - AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) SECTION XI, INSERVICE INSPECTION (ISI) PROGRAM - SECOND TEN-YEAR INSPECTION INTERVAL, REQUESTS FOR RELIEF 2-ISI-6, REVISON 2, 2-ISI-13, 2-ISI-14, AND 2-ISI-15, CLARIFICATION AND ADDITIONAL INFORMATION This letter provides clarification and additional information for certain BFN Unit 2 requests for relief. TVA submitted, by letter dated May 24, 2002, relief requests 2-ISI-6, Revision 2, 2-ISI-13, 2-ISI-14, and 2-ISI-15 for the Unit 2 ASME Section XI, Second Ten-Year Inservice Inspection Interval for the Browns Ferry Nuclear Plant.
During its review of the BFN requests for relief, the NRC staff identified questions regarding TVA's proposed alternate examinations. TVA and the NRC staff held several teleconferences to discuss the staff's questions. As a result of those teleconferences, TVA is providing clarification and additional information regarding the proposed alternative examinations stated in requests for relief 2-ISI-6, Revision 2, 2-ISI-13, 2-ISI-14, and 2-ISI-15. The enclosure to this letter lists the NRC questions and provides the corresponding TVA response.
Pnnted o recycled paper
U.S. Nuclear Regulatory Commission Page 2 February 14, 2003 As stated in TVA's letter dated May 24, 2002, these are the final requests for relief for the BFN Unit 2 ASME Section XI, Second Ten-year Inservice Inspection Interval that ended May 24, 2001.
There are no new commitments contained in this letter. If you have any questions, please contact me at (256) 729-2636.
S'ncerel T. E. Abney Manager Licensi g and ndustry Aff irs Enclo re cc (Enc sure):
(Via NRC E e 1onic Distribution)
Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9) 11555 Rockville Pike Rockville, Maryland 20852-2739
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) SECTION XI, INSERVICE INSPECTION (ISI) PROGRAM (SECOND TEN-YEAR INSPECTION INTERVAL), REQUESTS FOR RELIEF 2-ISI-6, REVISION 2, 2-ISI-13, 2-ISI-14, AND 2-ISI-15 RESPONSE TO NRC QUESTIONS During its review of BFN Unit 2 requests for relief 2-ISI-6, Revision 2, 2-ISI-13, 2-ISI-14, and 2-ISI-15 the NRC staff identified questions regarding TVA's proposed alternate examinations. TVA and the NRC staff held several teleconferences to discuss the staff's questions. As a result of those teleconferences, TVA is providing clarification and additional information regarding the proposed alternative examinations stated in the requests for relief. Listed below are the specific NRC questions and the corresponding TVA response.
NRC Question Relief requests 2-ISI-6 and 2-ISI-13 seek relief for nine reactor pressure vessel (RPV) nozzle-to-vessel full penetration welds and for the RPV standby liquid control nozzle inside radius section, respectively. The proposed examination of the nine RPV nozzle to vessel welds is to be performed using ultrasonic examination from the outside of the vessel. The percent coverage for these nozzles is 56 to 72 percent. The proposed examination of RPV standby liquid control nozzle inside radius is to be visual (VT-2) examination in conjunction with the Class 1 system leakage test.
The Advanced Inservice Reactor Inspection System 21 device (AIRIS
- 21) and Enhanced Data acquisition System-II equipment (EDASTM-II) is used to ultrasonically inspect longitudinal shell welds from the inside surface of the RPV.
Identify the percent of coverage for flaws located at the clad and nozzle weld interface when ultrasonic examination is performed in accordance with request for relief 2-ISI-6.
TVA Response The percentage of examination coverage for flaws located at the clad and nozzle weld interface are approximated as follows:
Nozzles N-2D, N-2E, and N-2K - The clad and nozzle weld interface was examined utilizing an automated UT system and manual UT techniques at areas Where the automated system was limited. Clad and nozzle weld interface examination coverage is approximately 62.5 percent.
Nozzles N-3A, and N-3C - The nozzle to shell weld was examined utilizing manual UT. Clad and nozzle weld interface examination coverage is approximately 68.7 percent.
Nozzles N-4D, and N-4E - The cladding has been removed from the feed water nozzles in accordance with NUREG-0619, "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking" requirements.
Nozzle N-8B - The nozzle to shell weld was examined utilizing manual UT. Clad and nozzle weld interface percent coverage is approximately 75 percent.
Nozzle N The nozzle to shell weld was examined utilizing manual UT. Clad and nozzle weld interface examination coverage is approximately 50 percent.
NRC Question Explain why the AIRIS 21 and EDASTM-II can not be utilized for examination of the welds and inside radius section discussed in request for relief 2-ISI-6 and 2-ISI-13.
TVA Response The configuration of the vessel and internal piping prevents access with an automated system as follows:
Nozzles N-2D, N2-E, N-2K, N-4D, N4-E, N-8B - Inaccessible due to piping and spargers.
Nozzle N Inaccessible due to core shroud plate.
Nozzles N-3A, and N-3C - These nozzles are accessible but the technology has not been developed to perform the examination from the vessel ID for BWRs.
E-2
NRC Question Identify the increase in NDE examination coverage expected if the AIRIS 21 and EDASTM-II equipment can be utilized for ultrasonic examination.
TVA Response As described above, the configuration of the vessel and internal piping prevents access with an automated system.
NRC Question For Relief Request 2-ISI-15 the licensee identified Code Case N-577, "Risk-Informed Requirements for Class 1, 2, or 3 Piping, Method A," as being the applicable Code requirement. The NRC has not approved this Code Case for use. However, N-577 does serve as a reference to relate the IGSCC welds, which fall under Browns Ferry's risk-informed ISI (RI-ISI) program, back to the true Code requirement, which is IWB-2500, Table IWB 2500-1, Figure IWB-2500 8(c). Therefore, relief should be requested from the requirement of ASME Code,Section XI, IWB-2500, Table IWB-2500-1. Please indicate which examination categories and item numbers from IWB-2500 apply to these welds (i.e., B-J, B-F, etc.)
TVA Response TVA received a Safety Evaluation Report (SER) from the NRC dated January 19, 2001 (TAC No. MA8873), "Browns Ferry Nuclear Plant Unit 2, Code Relief For Risk-Informed Inservice Inspection Of Piping Welds." This SER allowed TVA to utilize an alternative Risk-Informed Inservice Inspection (RI-ISI) program for BFN Unit 2. This program was developed in general accordance with the Westinghouse Owners Group (WOG) Topical Report WCAP-14572, Revision 1-NPA-A, which was approved by the NRC staff. This report references the utilization of Code Case N-577 for the examination methods.
The Code requirement is Code Case N-577, N-577-2500, Table 1, Examination Code Category R1.16.
NRC Question In the licensee's basis for relief in 2-ISI-15 they state:
"Welds GR-2-15(OL) and DRHR-2-03 were examined in April 1999, prior to the Performance Demonstration Initiative (PDI) Program E-3
requirements being mandated by 10 CFR 50.55a(b) (2) (xv) (A) (2),
utilizing NDE methods and techniques to the requirements of ASME Section XI Code, 1989 Edition, No Addenda." Is 1989 supposed to read 1986, since that is the applicable Section XI code edition for the relief?
TVA Response The correct ASME Section XI Code year for NDE is the 1989 Edition.
At the time the examination of welds GR-2-15(OL) and DRHR-2-03 were performed the NDE program was to the 1989 Edition of ASME Section XI. The TVA Nuclear (all sites) NDE program was upgraded to the 1989 Edition in 1996. The Code of record for Unit 2 (component selection) is the 1986 Edition. This was referenced in Inservice Inspection Program Unit 2, procedure 2-SI-4.6.G, paragraph 4.1.
NRC Question For relief request 2-ISI-6, what percentage coverage was obtained for the nozzles in the previous examinations and what was the result of the examinations?
TVA Response The subject nozzle to RPV vessel welds require examination (UT) in accordance with ASME Section XI, Table IWB-2500-1, Examination Category B-D, Item B3.90 once during each Ten-Year ISI interval.
Request for relief 2-ISI-6 Revision 2, addresses RPV nozzle (9 nozzles) examination coverage obtained during Cycle 11 (Spring 2001) of the Unit 2 Second Ten-Year ISI Interval (May 24, 1992 to May 24, 2001). The previous examinations of the subject nozzles were completed during the Unit 2 First Ten-Year ISI Interval (March 1, 1975 to May 24, 1992). Please note that the Unit 2 ISI interval was extended six years since the unit was shutdown from 1985 to 1991.
The examination method (UT) and techniques utilized in the First Ten-Year ISI Interval were basically the same as used in the second Ten-Year ISI interval, therefore, the percentage of examination coverage obtained in the first interval was essentially the same as reported in 2-ISI-6 Revision 2. The examinations performed on the subject welds in both the first and second Ten-Year ISI intervals met the applicable ASME Section XI weld examination acceptance criteria.
E-4
NRC Question For relief request 2-ISI-13, when was the SLC nozzle last inspected and what were the results?
TVA Response The SLC nozzle is approximately 2 inches in diameter. The inner radius section of the SLC nozzle is required to be examined in accordance with ASME Section XI, Table IWB-2500-1, Examination Category B-D, Item B3.100 once during each Ten-Year ISI interval.
A review of the first Ten-Year ISI interval program shows the nozzle was exempt (i.e., 3-inch and smaller) from examination based on section IWB-1220(b) (1) of the Code of record in effect for the first Ten-Year interval (ASME Section XI, 1974 Edition, Summer 75 Addenda). Therefore, no examination was required, or performed, for the SLC nozzle during the First Ten-Year ISI inspection interval.
However, the SLC nozzle has received a VT-2 (visual) examination in conjunction with the Class I System Leakage Test conducted during each refueling outage of the Second Ten-Year ISI interval.
Unit 2 has refueled six times during the second Ten-Year ISI interval. Consequently, the SLC nozzle has undergone six VT-2 (visual) examinations during the second Ten-Year ISI interval. No leakage has been identified during the VT-2 (visual) examinations of the SLC nozzle.
NRC Question For relief request 2-ISI-14, when were the welds last inspected and what were the results?
TVA Response The BFN reactor pressure vessel longitudinal shell welds listed in this relief request were not inspected during the first Ten-Year ISI Interval (March 1, 1975 to May 24, 1992). As a result of improved technology and equipment (i.e., remote examination), a rule change, 10 CFR 50.55a(g) (6) (ii) (A) (2), went into effect on September 8, 1992, that required examination of the reactor pressure vessel shell welds (circumferential* and longitudinal) using the requirements specified in ASME Section XI, Table IWB-2500-1, Category B-A, Items B1.11 and B1.12 respectively.
The examination coverage limitations identified in relief request 2-ISI-14 are a result of the first, and only, examination of the RPV longitudinal (Item B1.12) shell welds.
E-5
The RPV shell to flange weld (ASME Section XI, Table IWB-2500-1, Category B-A, Item B1.30) is also included in the scope of this request for relief. The weld was examined during the first Ten-year ISI Interval. The examination method (UT) and techniques utilized in the first interval were basically the same as used in the second interval. Consequently, the percentage of examination coverage obtained in the first interval was essentially the same as reported in 2-ISI-14. The examinations performed on the subject weld in both the First and Second Ten-Year ISI intervals met the applicable ASME Section XI weld examination acceptance criteria.
- Note: By letter dated September 28, 1995, as supplemented by letters dated June 24 and October 29, 1996, May 16, June 4, June 13, and December 18, 1997, and January 13, 1998, the Boiling Water Reactor Vessel Internals Project (BWRVIP) submitted a report (BWRVIP-05) to the NRC that demonstrated that the RPV circumferential shell welds (ASME Section XI, Table IWB-2500-1, Category B-A, Item B1.11) required zero percent examination.
Generic Letter (GL) 98-05 provided individual licensees the guidance for implementing the BWRVIP-05 report. As a result, TVA submitted a request for relief (2-ISI-9) for BFN Unit 2, by letter dated March 24, 2000, that eliminated examination of the RPV circumferential shell welds for the remaining term under the existing operating licensee. TVA's request for relief was approved by NRC letter (TAC No. MA8424) dated August 14, 2000.
E-6