Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19340B975 + (23:33:26, 24 December 2024)
- ML19340B974 + (23:33:32, 24 December 2024)
- ML19340B973 + (23:33:38, 24 December 2024)
- ML19340B971 + (23:33:44, 24 December 2024)
- ML19340B970 + (23:33:49, 24 December 2024)
- ML19340B969 + (23:33:55, 24 December 2024)
- ML19340B968 + (23:34:01, 24 December 2024)
- ML19340B967 + (23:34:07, 24 December 2024)
- ML19340B966 + (23:34:07, 24 December 2024)
- ML19340B965 + (23:34:08, 24 December 2024)
- ML19340B964 + (23:34:08, 24 December 2024)
- ML19340B962 + (23:34:22, 24 December 2024)
- ML19340B961 + (23:34:28, 24 December 2024)
- ML19340B959 + (23:34:34, 24 December 2024)
- ML19340B958 + (23:34:40, 24 December 2024)
- ML19340B956 + (23:34:41, 24 December 2024)
- ML19340B954 + (23:34:47, 24 December 2024)
- ML19340B953 + (23:34:47, 24 December 2024)
- ML19340B952 + (23:34:48, 24 December 2024)
- ML19340B951 + (23:34:54, 24 December 2024)
- ML19340B950 + (23:34:55, 24 December 2024)
- ML19340B949 + (23:34:55, 24 December 2024)
- ML19340B948 + (23:35:01, 24 December 2024)
- ML19340B947 + (23:35:07, 24 December 2024)
- ML19340B946 + (23:35:13, 24 December 2024)
- ML19340B944 + (23:35:19, 24 December 2024)
- ML19340B942 + (23:35:25, 24 December 2024)
- ML19340B941 + (23:35:25, 24 December 2024)
- 05000320/LER-1980-035, Discusses LER-80-035/03L-0 Re Failure of Fire Detectors for White Balance of Plant Diesel Generators.Plans to Submit Tech Spec Change Request as Part of Pkg of Multiple Changes + (23:35:32, 24 December 2024)
- ML19340B938 + (23:35:34, 24 December 2024)
- 05000270/LER-1980-022-01, /01T-0:on 801011,four Holes Were Knocked in Fire Barrier Between Cable Spread Room & Turbine Bldg W/O Establishment of Hourly Fire Watch.Caused by Failure to Provide Proper Notificaion.Hourly Fire Watch Established + (23:35:35, 24 December 2024)
- ML19340B934 + (23:35:42, 24 December 2024)
- ML19340B933 + (23:35:48, 24 December 2024)
- 05000296/LER-1980-041-03, /03L-0:on 801007,breakers 1918 & 1924 Tripped When Lift Pumps on Cooling Tower 3 started,de-energizing Switchgear B.Caused by Removal of Temp Sensors on Pumps for Maint,Tripping Breakers.Breakers Reclosed + (23:35:49, 24 December 2024)
- ML19340B931 + (23:35:59, 24 December 2024)
- ML19340B930 + (23:36:00, 24 December 2024)
- ML19340B929 + (23:36:02, 24 December 2024)
- 05000296/LER-1980-041, Forwards LER 80-041/03L-0 + (23:36:03, 24 December 2024)
- ML19340B926 + (23:36:05, 24 December 2024)
- ML19340B925 + (23:36:06, 24 December 2024)
- BSEP-80-1748, Confirms 801021 Telcon.On 801020,during Reactor Core Isolation Cooling Flow Controller FIC-03325 Maint,Controller Failed in Automatic Position.Caused by Bad Solder Connection in Printed Circuit.Connection Repaired + (23:36:07, 24 December 2024)
- ML19340B924 + (23:36:07, 24 December 2024)
- ML19340B922 + (23:36:10, 24 December 2024)
- ML19340B921 + (23:36:11, 24 December 2024)
- ML19340B919 + (23:36:12, 24 December 2024)
- 05000333/LER-1980-079-03, /03L-0:on 801008,RCIC Sys Made Inoperable to Allow Repair of Steam Leaks on Manual Valves Associated W/Steam Line Drains.Leaks Caused by Normal Aging & Thermal Cycling. Valve Body to Bonnet Gaskets Replaced + (23:36:13, 24 December 2024)
- ML19340B917 + (23:36:15, 24 December 2024)
- ML19340B916 + (23:36:18, 24 December 2024)
- ML19340B914 + (23:36:24, 24 December 2024)
- ML19340B913 + (23:36:30, 24 December 2024)
- 05000333/LER-1980-079, Forwards LER 80-079/03L-0 + (23:36:31, 24 December 2024)