Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19340E298 + (22:53:41, 24 December 2024)
- ML19340E296 + (22:53:42, 24 December 2024)
- ML19340E297 + (22:53:42, 24 December 2024)
- ML19340E295 + (22:53:43, 24 December 2024)
- ML19340E294 + (22:53:44, 24 December 2024)
- ML19340E293 + (22:53:45, 24 December 2024)
- ML19340E292 + (22:53:46, 24 December 2024)
- ML19340E291 + (22:53:47, 24 December 2024)
- ML19340E290 + (22:53:48, 24 December 2024)
- ML19340E288 + (22:53:49, 24 December 2024)
- ML19340E287 + (22:53:50, 24 December 2024)
- ML19340E286 + (22:53:51, 24 December 2024)
- ML19340E284 + (22:53:52, 24 December 2024)
- ML19340E283 + (22:53:53, 24 December 2024)
- ML19340E282 + (22:53:54, 24 December 2024)
- ML19340E281 + (22:53:56, 24 December 2024)
- ML19340E280 + (22:54:00, 24 December 2024)
- ML19340E279 + (22:54:01, 24 December 2024)
- ML19340E278 + (22:54:03, 24 December 2024)
- ML19340E277 + (22:54:04, 24 December 2024)
- ML19340E276 + (22:54:05, 24 December 2024)
- ML19340E275 + (22:54:06, 24 December 2024)
- ML19340E272 + (22:54:07, 24 December 2024)
- ML19340E269 + (22:54:08, 24 December 2024)
- ML19340E271 + (22:54:08, 24 December 2024)
- ML19340E268 + (22:54:09, 24 December 2024)
- ML19340E267 + (22:54:10, 24 December 2024)
- ML19340E265 + (22:54:11, 24 December 2024)
- 05000312/LER-1980-048-03, /03L-0:on 801201,while Reviewing Inservice Insp Program & Surveillance Procedures,Two Remotely Operated Reactor Bldg Isolation Valves Discovered Not Tested as Required by Tech Specs.Caused by Deletion of Quarterly Test + (22:54:13, 24 December 2024)
- 05000312/LER-1980-048, Forwards LER 80-048/03L-0 + (22:54:14, 24 December 2024)
- ML19340E261 + (22:54:16, 24 December 2024)
- 05000285/LER-1980-031-03, /03L-0:on 801207,during Normal Operation,Leak Developed in Weld Connecting Demineralized Water Flush Line to Discharge Manifold of Charging Pump.Caused by Probable Piping Vibration.Crack Repaired & Pump Returned to Svc + (22:54:17, 24 December 2024)
- ML19340E258 + (22:54:19, 24 December 2024)
- 05000285/LER-1980-031, Forwards LER 80-031/03L-0 + (22:54:20, 24 December 2024)
- ML19340E254 + (22:54:24, 24 December 2024)
- ML19340E251 + (22:54:31, 24 December 2024)
- 05000346/LER-1980-088-03, /03L-0:on 801205,while Troubleshooting for Ground Problems in Safety Features Actuation Sys Channel 3 Cabinet, Station Experienced Channel 1/3 Simultaneous Actuation of Levels 1,2,3 & 5.Caused by Component failure.PS-07 Repl + (22:54:32, 24 December 2024)
- ML19340E248 + (22:54:34, 24 December 2024)
- ML19340E246 + (22:54:35, 24 December 2024)
- 05000346/LER-1980-088, Forwards LER 80-088/03L-0 + (22:54:36, 24 December 2024)
- ML19340E242 + (22:54:37, 24 December 2024)
- ML19340E243 + (22:54:37, 24 December 2024)
- IR 05000461/1980021 + (22:54:38, 24 December 2024)
- ML19340E237 + (22:54:40, 24 December 2024)
- ML19340E236 + (22:54:41, 24 December 2024)
- ML19340E235 + (22:54:42, 24 December 2024)
- 05000346/LER-1980-087-03, /03L-0:on 801206,while Troubleshooting,Control Room Operator Could Not Stroke Valve CV5006.Valve Declared Inoperable.Cause Unknown.Corrective Action Will Be Conducted Under Maint Work Order IC-814-80 During Next Outage + (22:54:43, 24 December 2024)
- ML19340E233 + (22:54:45, 24 December 2024)
- ML19340E232 + (22:54:46, 24 December 2024)
- 05000346/LER-1980-087, Forwards LER 80-087/03L-0 + (22:54:47, 24 December 2024)
- 05000346/LER-1980-089-03, /03L-0:on 801203,following Reactor Trip,Rcs Sample Revealed Dose Equivalent I-131 Level Was Greater than Tech Specs.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored to Ensure That Gas Decayed to Below Limits + (22:54:49, 24 December 2024)