799 ROOSEVELT ROAD g
o-GLEN ELLYN. lLLINOIS 60137 November 6, 1980 Those on Attached Address Listing:
The enclosed IE Bulletin No. 80-21 requires your action with regard to your power reactor facility (ies) holding an operating license or a construction permit. Should you have questions concerning this bulletin or the actions required of you, please contact this office.
Sincerely, Cd M%
fvJamesG.Keppler C
Director
Enclosure:
IE Bulletin No. 80-21 cc w/ enc 1:
Mr. D. W. Kane, i
Sargent & Lundy Reproduction Unit NRC 20b (g1 01 06 0
I
,RIII's CORPORA",, ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's and PWR's)
Docket No. 50-329 Docket No. 50-330 Consumers Power Company p
ATTN:
Mr. James W. Cook ci 2
Vice President
~
g Midland Project 1945 West ParnaIl Road
.i Jackson, MI 49201
,yd.c
.h--
~
=y >
..~
pc f encl:
??
2-5 Omfftral Files Q
'd Director, NRR/DPM o
..2 Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago Docket No. 50-409 Dairyland Power Cooperative ATTN:
Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 cc w/ enc 1:
Mr. R. E. Shimshak, Plant Superintendent Central Files Director, NRR/DPM l
Director, NRR/ DOR AEOD Resident Inspector, RIII PDR l
Local PDR NSIC TIC Mr. John Duffy, Chief Boiler Inspector
,e l
t l
RIII's CORPORATE ADDRESSES FOR 0?ERATING LICENSEES AND COESTRUCTION PERMIT HOLDERS (BWR's and PWR's)
Docket Nos. 50-10, 50-237, 50-249; 50-254, 50-265; 50-295, 50-304; 50-373, 50-374; 50-454, 50-455; 50-456 and 50-457 Commonwealth Edison Company ATTN:
Mr. Cordell Reed, Vice President Post Office Box.'767 Chicago, IL 60690 cc w/ encl:
Mr. J. S. Able, Director Mr. Gunner Sorensen, Site of Nuclear Licensing Project Superintendent Mr. D. J. Scott, Station Mr. R. Cosaro, Project Superintendent Superintendent Mr. N. Kalivianakis, Mr. J. F. Gudac, Station Station Superintendent Superintendent Mr. K. Graesser, Station Central Files Superintendent Director, NRR/DPM Mr. L. J. Burke, Site Director, NRR/ DOR Construction Superintendent AEOD Mr. T. E. Quaka, Quality Resident Inspectors, RIII Assurance Supervisor PDR Mr. R. H. Holyoak, Station Local PDR Superintendent NSIC Mr. B. B. Stephenson, TIC Project Manager Mr. Dean Hansell, Office of Mr. V. I. Schlosser, Assistant Attorney General Project Manager Myron M. Cherry, Chicago Mr. R. E. Querio, Station l
Superintendent i
l Docket No. 50-358 i
Cincinnati Gas and Electric Company ATTN:
Mr. Earl A. Borgmann l
Senior Vice President Engineering Services and Electric Production 139 East 4th Street Cincinnati, OH 45201 cc w/ encl:
Mr. J. R. Schott, Plant Local PDR Superintendent NSIC Central Files TIC Director, NRR/DPM Harold W. Kohn, Power Director, NRR/ DOR Siting Commission AEOD Citizens Against a Radioactive Resident Inspector, RIII Environment i
PDR Helen W. Evans, State of Ohio I
e-e-
. R1II's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's and PWR's)
Docket No. 50-341 The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR AE0D Resident Inspector, RIII PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney Docket No.50-46I Docket No. 50-462
^
Illinois Power Company ATTN:
Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 cc w/ encl:
Central Files l
Director, NRR/DPM l
Director, NRR/ DOR l
PDR l
Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General Mr. Gary N. Wright, Chief l
Division of Nuclear Safety l
l
{
t i
i I
i
RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BliR's cnd Pk'R's)
Docket No. 50-331 Iowa Electric Light and Power Company ATTN:
Mr. Duane Arnold
~
President IE Towers P. O. Box 351 Cedar Rapids, IA 52406 cc w/encI:
D. Mineck, Chief Engineer Central Files Director, NRR/DPM Director, NRR/ DOR AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Docket No. 50-367 Northern Indiana Public Service Company ATTN:
Mr. Eugene M. Shorb Senior Vice President 5265 Hohman Avenue Hammond, IN 46325 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General l
r L
.RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES K.iD CONSTRUCTION PERMIT HOLDERS (BW's and PWR's)
Docket No. 50-263 Docket No. 50-282 Docket No. 50-306 Northern States Power Company ATTN:
Mr. Dennis E. Gilberts Vice President Power Prdduction and System Operation 414 Nicollet Mall Minneapolis, MN 55401 cc w/ encl:
Mr. W. A. Shamla, Resident Inspectors, RIII Plant Manager PDR Mr. F. P. Tierney, Jr.,
Local PDR Plant Manager NSIC Central Files TIC Director, NRR/DPM John W. Ferman, Ph.D.,
Director, NRR/ DOR Nuclear Engineer, MPCA AE0D Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATTN; Mr. S. W. Shields Senior Vice President Nuclear Division Post Office Box 190 New Washington, IN 47162 cc w/ encl:
l Mr. Steve J. Brewer, A tar TIC i
Safety and Licensin ervisor LeBoeuf, Lamb, Leiby & MacRae Central Files Mr. Dave Martin, Office of the Director, NRR/DPM Attorney General Director, NRR/ DOR Mr. John R. Galloway, Staff PDR Director, Environment, Energy Local PDR and Natural Resources Subcommittee l
NSIC l
l
.RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's end PWR's)
Docket No. 50-346 Toledo Edison Company ATTN:
Mr. Richard P. Crouse Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 cc w/ enc 1:
Mr. T. Murray, Station Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio l
Docket No. 50-483 Docket No. 50-486 Union Electric Company ATTN:
Mr. John K. Bryan Vice President - Nuclear P. O. Box 149 St. Louis, MO 63166 l
cc w/ enc 1:
Mr. W. H. Weber, Manager, Nuclear Construction Central Files Director, NRR/DPM l
Director, NRR/ DOR PDR Local PDR NSIC TIC Region I & IV Ms. K. Drey Mr. Ronald Fluegge, Utility Division, Missouri Public Service Commission i
-m e
y y
g-q a--r-4 gy
.RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (B**'R's and PWR's)
Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 cc w/ encl:
Mr. G. A. Reed, Plant Local PDR Manager NSIC Central Files TIC Director, NRR/DPM Sandra A. Bast, Lakeshore Director, NRR/ DOR Citizens for Safe Energy Timothy Colburn, ORB /NRR Mr. John J. Duffy, Chief AEOD Boiler Inspector Resident Inspector, RIII Mr. Peter Anderson, Wisconsin's PDR Environmental Decade Docket No. 50-305 Wisconsin Public Service Corporation ATIN:
Mr. E. R. Mathews Vice President Power Supply and Engineering P. O. Box 1200 Green Bay, WI 54305 cc w/ encl:
D. C. Hintz, Plant AEOD Superintendent Resident Inspector, RIII Mr. W. Sayles, Chief PDR Engineer Local PDR Central Files NSIC Director, NRR/DPM TIC Director, NRR/ DOR Mr. John J. Duffy, Chief Boiler Inspector
RIII'S CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CpNSTRUCTION PERMIT HOLDERS (BWR's and PWR's)
Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 cc w/ enc 1:
Mr. D. V. Shaller, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR AEOD Resident Inspector, RIII PDR' Local PDR NSIC TIC Ronald Callen, Michigan Public Service Corporation i
.~.
,. ~ -.. _
".,RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's end PWR's)
Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATIN:
Mr. Dalwyn R. Davidson Vice President - Engineering P. O. Box 5000.
Cleveland, OH 4410 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Mr. Daniel D. Wilt, Attorney Helen Evans, State of Ohio Docket No. 50-155 Docket No. 50-255 Consumers Power Company ATTN:
Mr. R. B. DeWitt Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 cc w/ encl:
l Mr. D. P. Hoffman, Nuclear Resident Inspectors, RIII Licensing Administrator PDR Mr. C. J. Hartman, Local PDR Plant Superintendent NSIC Mr. R. W. Montross, Manager TIC Central Files Ronald Callen, Michigan Director, NRR/DPM Public Service Commission l
Director, NRR/ DOR Myron M. Cherry, Chicago AEOD
hD h
SSINS No.:
6820
[]
Accession No.:
8008220246 IEB 80-21 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 November 6, 1980 IE BULLETIN N0l'80-21:
VALVE Y0KES SUPPLIED BY MALCOLM FOUNDRY COMPANY, INC.
Description of Circumstances:
On June 17, 1980, Pennsylvania Power and Light Company notified IE Region I that cracks had been discovered in the yokes of a number of valves in the residual heat removal (RHR) system at their Susquehanna Steam Electric Station.
The potential for common-mode failure of the yokes on several valves in redundant, safety-related trains of the RHR system constitutes a failure mode whereby all RHR functions could be simultaneously lost.
Specifically, the cracks were located in the radii at the yoke mounting flange-to yoke vertical section interface.
An analysis and evaluation of the most severely cracked valve yoke was performed by the valve manufacturer, Anchor Darling Valve Company.
They concluded that the cracking was not due to casting defects, but rather was due to the yoke material not having the proper mechanical properties.
Purchased as ASTM A-216, Grade WCB material, the actual valve yoke material had tensile and yield strengths below the minimum values listed in the ASTM material specification.
The cracked valve yokes were all cast by Malcolm Foundry Company, Inc., of Newark, New Jersey. The foundry is no longer in business.
Anchor Darling has begun a program of verifying the tensile strengths of the other valve yokes cast by Malcolm and used on Anchor Darling valves at Susquehanna. To date, approximately half of the valve yokes have been tested.
Of those tested, over 25 percent of the valve yokes have revealed Brinell hard-ness values significantly below the appropriate value obtained from the approxi-mate relationship of Brinell hardness to tensile strength included in ASTM.
Specification A-370. These additional valve yokes are on a wide range of valve sizes'and are from a number of different purchase orders placed with l
Malcolm over a period of at least ten months during 1974 and 1975.
Thus, it l
appears that the problem is not isolated to one heat of material or to one short time period. Anchor Darling intends to replace the defective valve yokes at Susquehanna and to begin a testing program at other nuclear power plants under construction where valves with valve yokes cast by Malcolm have been provided.
I Since Malcolm Foundry Company, Inc., is no longer in business, the NRC staff cannot determine directly if Malcolm has provided valve parts to other valve manufacturers for use in nuclear power plants.
Actions To Be Taken by Addressees:
For all power reactor licensees or holders of construction permits the following actions are required:
~
IEB 80-21 November 6, 1980 Page 2 of 2 1.
Determine if any of the active valves in use or planned for use in safety-related systems at your facility have valve parts cast by Malcolm Foundry Company, Inc.
If no valves are identified as having potentially faulty material, indicate that this is the case and ignore the remaining questions.
2.
Licensees having active safety-related valves with potentially faulty material shall immediately visually inspect for cracks all normally accessible valve parts (i.e., those which can be inspected during reactor operation).
3.
Licensees or permit nolders having active safety-related valves with potentially faulty material shall identify the manufacturer (s) of these valves and either:
a.
Verify that all valve parts cast by Malcolm have mechanical properties in accordance with the ASTM material specification; if such is not the case, then comply with either b. or c. below also.
b.
Replace the defective materials and/or valves.
Identify any other corrective actions that may be exercised and the c.
basis for such actions.
For plants with an operating license, the results of your initial determination (item 1), visual inspection results (item 2), a list of affected valve manu-
,facturers, your planned action (item 3), and the schedule for accomplishing this action shall be reported within thirty days of the date of this bulletin to the Director of the appropriate NRC Regional Office with a copy sent to the NRC Office of Inspection and Enforcement, Division of Reactor Construction Inspection, Washington, DC 20555.
For plants with a construction permit, the results of your initial determination (item 1), a list of affected valve manufacturer (s), your planned action (item
- 3) and the schedule for accomplishing this action shall be reported within sixty days of the date of this bulletin to the Director of the appropriate NRC Regional Office with a copy sent to the NRC Office of Inspection and Enforcement, Division of Reactor Construction Inspection, Washington, DC 20555.
Compliance with this bulletin by the licensees does not relieve the affected valve manufacturers from the reporting requirements of 10 CFR Part 21.
If you desire additional information regarding this matter, please contact the appropriate IE Regional Office.
Approved by GAO, B180225 (R0072); clearance expires November 30, 1980.
Approval was given under a blanket clearance specifically for identified generic problems.
IEB 80-21 November 6, 1980 RECENTLY ISSUED IE BULLETINS Bulletin No.
Subiect Date Issued Issued To Supplement 3 Environmental Qualification 10/24/80 All power reactor to 79-10B
'of Class 1E Equipment facilities with an OL Supplement 2 Environmental Qualification 9/30/80 All power reactor to 79-01B of Class 1E Equipment facilities with an OL 80-22 Automation Industries, 9/11/80 All radiography Model 200-520-008 5ealed-licensees source Connectors 79-26 Boron Loss from BWR 8/29/80 All BWR power Revision 1 Control Blades facilities with an OL 80-20 Failures of Westinghouse 7/31/80 To each nuclear Type W-2 Spring Return power facility in to Neutral Control Switches your region having an OL or a CP 80-19 Failures of Mercury-7/31/80 All nuclear power Wetted Matrix Relays in facilities having Reactor Protective Systems either an OL or a CP of Operating Nuclear Power Plants Designed by Combus-i tion Engineering 80-18 Maintenance of Adequate 7/24/80 All PWR power reactor Minimum Flow Thru Centrifugal facilities holding OLs Charging Pumps Following and to those PWRs Secondary Side High Energy nearing licensing Line Rupture Supplement 2 Failures Revealed by 7/22/80 All BWR power reactor to 80-17 Testing Subsequent to facilities holding OLs Failure of Control Rods to Insert During a Scram at a BWR Supplement 1 Failure of Control Rods 7/18/80 All BWR power reactor to 80-17 to Insert During a Scram facilities holding OLs at a BWR 80-17 Failure of Control Rods 7/3/80 All BWR power reactor to Insert During a Scram facilities holding OLs at a BWR
-. -,