Responds to NRC Re Violations Noted in IE Insp Rept 50-461/80-21.Corrective Actions:Ultrasonic Instrument Recalibr & Added to Reactor Core Isolation Recall Cycle Log
ML19340E243
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/24/1980
From: Gerstner W
ILLINOIS POWER CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19340E239 List:
References
U-0203, U-203, NUDOCS 8101060731
Download: ML19340E243 (2)


Text

()

U-0203 Q37-80(11-24)-6

/LL/NOIS POWER OOMPANY 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 November 24, 1980 Mr. Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Fiorelli:

This is in response to your letter dated October 23, 1980, which included a Notice of Violation and Inspection Report Number 50-461/80-21.

The one item of noncompliance cited in this report states in part:

" Contrary to the above, on October 7, 1980, during an examination of Reactor Controls Inc. (RCI) instrument calibration records, the inspector noted that the Kraut-Kramer USIP-11, S/N 21197-3457, used for ultrasonic examination of control rod drive housing welds to the reactor vessel, was last calibrated on March 28, 1980."

The Kraut-Kramer USIP-ll, ultrasonic instrument S/N 21197-3457, which was found to be beyond the prescribed date for calibration, was hand-carried to an authorized Kraut-Kramer calibration shop on October 13, 1980.

The instrument was found to be in a calibrated condition upon arrival at the shop.

Cali-bration certificates and test data were reviewed to substantiate this conclusion.

Based on this condition, the ultrasonic testing performed using this intrument during recent months is considered l

to be valid.

To avoid further noncompliance, this instrument has been added to the RCI Calibration recall cycle log, which should ensure timely calibration in the future.

Additionally, training has been provided for appropriate RCI personnel on calibration requirements for ultrasonic equipment.

Full compliance was achieved on October 23, 1980.

l 81010a0 7 31.

NOV 2 6. GR

U-0203 Q37-80(ll-24)-6 G. Fiorelli November 24, 1980 NRC Page 2 I trust that the above actions constitute an acceptable response and will satisfactorily complete our Corrective Action.

Sincerely, b'

m W. C. Gerstner j

Executive Vice President AJB/ph cc:

CPS /DRC/ Microfilm Director, IP Quality Assurance H.

H.

Livermore, NRC Resident Inspector

)

}

4 i-h i

t 4

2

-.-c.....-x..-......

- - _ _... _, -.. -,..., _, _ _.. _ -..,, _..,. _ -. _,