Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19341A311 + (22:34:53, 24 December 2024)
- ML19341A308 + (22:34:55, 24 December 2024)
- ML19341A309 + (22:34:55, 24 December 2024)
- ML19341A307 + (22:34:56, 24 December 2024)
- ML19341A304 + (22:34:57, 24 December 2024)
- ML19341A306 + (22:34:57, 24 December 2024)
- ML19341A303 + (22:34:58, 24 December 2024)
- ML19341A302 + (22:34:59, 24 December 2024)
- ML19341A301 + (22:34:59, 24 December 2024)
- ML19341A300 + (22:35:00, 24 December 2024)
- ML19341A299 + (22:35:00, 24 December 2024)
- ML19341A297 + (22:35:04, 24 December 2024)
- ML19341A296 + (22:35:05, 24 December 2024)
- IR 05000277/1980031 + (22:35:07, 24 December 2024)
- ML19341A294 + (22:35:08, 24 December 2024)
- ML19341A293 + (22:35:09, 24 December 2024)
- IR 05000508/1980012 + (22:35:11, 24 December 2024)
- ML19341A290 + (22:35:13, 24 December 2024)
- ML19341A289 + (22:35:14, 24 December 2024)
- ML19341A288 + (22:35:14, 24 December 2024)
- 05000327/LER-1980-200-03, /03L-0:on 801217,valves 1-FCV-1-15,16 & 17 Found Not to Have Been Stroke Tested After Repacking on 801209. Caused by Engineer & Craft Failure to Notify Proper Personnel.Valves Tested & Personnel Instructed + (22:35:16, 24 December 2024)
- ML19341A286 + (22:35:17, 24 December 2024)
- ML19341A283 + (22:35:18, 24 December 2024)
- ML19341A284 + (22:35:18, 24 December 2024)
- 05000327/LER-1980-200, Forwards LER 80-200/03L-0 + (22:35:20, 24 December 2024)
- ML19341A279 + (22:35:21, 24 December 2024)
- ML19341A278 + (22:35:22, 24 December 2024)
- 05000327/LER-1980-203-03, /03L-0:on 801216,during Ice Condenser Insp, Intermediate Deck Door Under AHU-3A Found Frozen Shut. Caused by AHU-3A Drain Line Flange Leaking.Ice Removed from Door,Flange Gasket Replaced & Leakage Stopped + (22:35:23, 24 December 2024)
- ML19341A276 + (22:35:24, 24 December 2024)
- ML19341A275 + (22:35:25, 24 December 2024)
- 05000327/LER-1980-203, Forwards LER 80-203/03L-0 + (22:35:26, 24 December 2024)
- 05000327/LER-1980-204-03, /03L-0:on 801216,axial Flux Difference Was Out of Target Band Longer than 1-h.Caused by Rod Stepping to Maintain Power & Blocked Borate Paths Due to Low Heat Trace Setting.Notice to Maintain Temp at 200 F Put on Control + (22:35:28, 24 December 2024)
- ML19341A271 + (22:35:30, 24 December 2024)
- ML19341A270 + (22:35:31, 24 December 2024)
- ML19341A269 + (22:35:31, 24 December 2024)
- 05000327/LER-1980-204, Forwards LER 80-204/03L-0 + (22:35:32, 24 December 2024)
- ML19341A266 + (22:35:33, 24 December 2024)
- 05000277/LER-1981-001-04, /04T-0:on 801019,max Daily Chlorination Time Limit Exceeded by 30 Minutes.Caused by Personnel Error. Instructions Posted at Chlorination Control Panel,Procedure Clarified & Individual Reinstructed + (22:35:35, 24 December 2024)
- 05000277/LER-1981-001, Forwards LER 81-001/04T-0 + (22:35:37, 24 December 2024)
- ML19341A261 + (22:35:38, 24 December 2024)
- 05000277/LER-1980-037-01, /01T-0:on 801230,during Subcritical Reactor Cooldown,Max Cooldown Rate Exceeded by 2 F.Caused by Operator Error.Allowable Cooldown Rate Established & Operator Counseled + (22:35:39, 24 December 2024)
- ML19341A259 + (22:35:41, 24 December 2024)
- 05000277/LER-1980-037, Forwards LER 80-037/01T-0 + (22:35:43, 24 December 2024)
- AECM-80-268, Submits Addl Info Re IE Bulletin 80-07, BWR Jet Pump Assembly Failure, in Response to NRC Request.Describes Actions to Preclude Occurrence of Jet Pump Cracking & Commitment for long-term Solution + (22:35:44, 24 December 2024)
- 05000278/LER-1980-031-03, /03L-0:on 801218,reactor Core Isolation Cooling Inboard Steam Supply Isolation Valve Did Not Automatically Close.Caused by Valve Closing Torque Switch on Type Smb Limitorque Operator for Valve MO3-13-15 Being Open + (22:35:46, 24 December 2024)
- 05000271/LER-1980-043-03, /03L-0:on 801220,reactor Core Isolation Cooling Valve 15 Had Seat Leakage of 1.531 Lbm/Hr,Exceeding Tech Specs.No Cause Noted.Valve Seating Surfaces Lapped & Valve Retested + (22:35:48, 24 December 2024)
- 05000271/LER-1980-043, Forwards LER 80-043/03L-0 + (22:35:50, 24 December 2024)
- 05000338/LER-1981-002-03, /03L-0:on 801231,pressurizer Power Operated Relief Valve Declared Inoperable Because of Low Nitrogen Gas Supply Tank Pressure in 1-GN-TK-1A.Caused by Excessive Usage of Nitrogen to Cycle Relief Valves to Reduce RCS Pressure + (22:35:51, 24 December 2024)
- 05000338/LER-1981-002, Forwards LER 81-002/03L-0 + (22:35:53, 24 December 2024)
- 05000346/LER-1980-093-03, /03L-0:on 801219,demineralized Water Containment Isolation Valve DW6831B Did Not Close in Required Time. Caused by Dump Solenoid Orifice Too Small to Allow Adequate Bleedoff Flow.Solenoid to Be Replaced + (22:35:55, 24 December 2024)
- 05000346/LER-1980-093, Forwards LER 80-093/03L-0 + (22:35:56, 24 December 2024)