ML19341A279
| ML19341A279 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 01/12/1981 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mcelwee F WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19341A280 | List: |
| References | |
| NUDOCS 8101220520 | |
| Download: ML19341A279 (1) | |
See also: IR 05000508/1980012
Text
TlL
c. .. ,
' ' ' ' '
[6[
'o *
UNITED STATES
,
~ , ,
NUCLEAR REGULATORY COMMISSION
g
D
- j
REGION V
1990 N. CALIFORNIA BOULEVARD
Q
o'g
%
SUITE 202, VtALNUT CREEK PLAZA
- ,,e"
V/ALNUT CR EE K, CALIFORN!A 94596
JAN 121981
Docket Hos. 50-508, 50-509
Washington Public Power Supply Sys:em
P. O. Box 1223
Elma, Washington 98541
Attention: Mr. F. D. McElwee
Program Director, WNP-3/5
Gentlemen:
Thank you for your letter dated December 19, 1980 informing us of the steps
you have taken to correct the item which we brought to your attention in our
letter dated November 26,1980.
It is our understanding that your architect-
engineer has calculated the loadings on the subject safety-related duct
supports and concluded that the single beam clip configuration is unacceptable
and that an additional beam clip will be added to these supports.
Your cooperation with us is appreciated.
.
Sincerely,
.
/b'hww
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
8101220 D 0
g
..