ML19341A279

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-508/80-12 & 50-509/80-12.Addl Beam Clip Will Be Added to safety- Related Duct
ML19341A279
Person / Time
Site: Satsop
Issue date: 01/12/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mcelwee F
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19341A280 List:
References
NUDOCS 8101220520
Download: ML19341A279 (1)


See also: IR 05000508/1980012

Text

TlL

c. .. ,

' ' ' ' '

[6[

'o *

UNITED STATES

,

~ , ,

NUCLEAR REGULATORY COMMISSION

g

D

j

REGION V

1990 N. CALIFORNIA BOULEVARD

Q

o'g

%

SUITE 202, VtALNUT CREEK PLAZA

    • ,,e"

V/ALNUT CR EE K, CALIFORN!A 94596

JAN 121981

Docket Hos. 50-508, 50-509

Washington Public Power Supply Sys:em

P. O. Box 1223

Elma, Washington 98541

Attention: Mr. F. D. McElwee

Program Director, WNP-3/5

Gentlemen:

Thank you for your letter dated December 19, 1980 informing us of the steps

you have taken to correct the item which we brought to your attention in our

letter dated November 26,1980.

It is our understanding that your architect-

engineer has calculated the loadings on the subject safety-related duct

supports and concluded that the single beam clip configuration is unacceptable

and that an additional beam clip will be added to these supports.

Your cooperation with us is appreciated.

.

Sincerely,

.

/b'hww

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

8101220 D 0

g

..