Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19344A467 + (16:48:28, 24 December 2024)
- ML19344A466 + (16:48:29, 24 December 2024)
- ML19344A464 + (16:48:30, 24 December 2024)
- ML19344A463 + (16:48:32, 24 December 2024)
- ML19344A462 + (16:48:33, 24 December 2024)
- ML19344A461 + (16:48:34, 24 December 2024)
- ML19344A459 + (16:48:35, 24 December 2024)
- ML19344A458 + (16:48:36, 24 December 2024)
- 05000339/LER-1980-040-03, /03L-0:on 800723,during Mode 3 Operation,Primary Containment Structure Temp Exceeded Tech Spec Limit.Caused by Temporary Loss of Component Cooling Water Flow to Shroud Cooler.Cooling Valve Reopened & Flow Restored + (16:48:41, 24 December 2024)
- 05000339/LER-1980-040, Forwards LER 80-040/03L-0 + (16:48:44, 24 December 2024)
- 05000219/LER-1980-029-03, /03L-0:on 800711,during Plant Startup,Core Spray Pumps & Diesel Generators Started,Due to High Drywell Pressure Sensor Actuation.Caused by Instrument Setpoint Shift.Plant Shut Down & Sensors Recalibr + (16:48:46, 24 December 2024)
- 05000219/LER-1980-029, Forwards LER 80-029/03L-0 + (16:48:49, 24 December 2024)
- 05000271/LER-1980-024-03, /03L-0:on 800718,during Normal Operation,Control Room Personnel Reported UPS-1B Trouble & Loss of Voltage to MC-89B.Caused by Failed Logic Power Supply Board. Component Replaced & Unit Operationally Tested + (16:48:50, 24 December 2024)
- 05000271/LER-1980-024, Forwards LER 80-024/03L-0 + (16:48:52, 24 December 2024)
- 05000249/LER-1980-028-03, /03L-0:on 800718,during Setpoint Surveillance, Solenoid Valve for Torus to Reactor Bldg Vacuum Breaker 3-1601-20A Determined Inoperative,Preventing Valve from Opening.Caused by Mechanical Failure.Valve Replaced + (16:48:54, 24 December 2024)
- ML19344A443 + (16:48:55, 24 December 2024)
- NG-19-0135, Change Report for Revision 3 to the Cyber Security Plan + (16:48:56, 24 December 2024)
- ML19344A439 + (16:48:56, 24 December 2024)
- 05000219/LER-1980-031-03, /03L-0:on 800716,snubber 75/23 Failed to Lock Up in Tension Direction.Cause Attributed to Component Failure. Snubber Was Replaced with Operable Spare + (16:48:58, 24 December 2024)
- ML19344A433 + (16:48:59, 24 December 2024)
- ML19344A431 + (16:48:59, 24 December 2024)
- 05000219/LER-1980-031, Forwards LER 80-031/03L-0 + (16:49:00, 24 December 2024)
- 05000325/LER-1980-062-03, /03L-0:on 800720,indication Problems Were Observed W/Control Rods 30-35,38-23,38-39 & 26-15.Cause Believed to Stem from Defective Rod Position Indication Reed Switches + (16:49:02, 24 December 2024)
- ML19344A426 + (16:49:04, 24 December 2024)
- 05000325/LER-1980-062, Forwards LER 80-062/03L-0 + (16:49:05, 24 December 2024)
- ML19344A420 + (16:49:07, 24 December 2024)
- ML19344A419 + (16:49:08, 24 December 2024)
- ML19344A418 + (16:49:09, 24 December 2024)
- ML19344A413 + (16:49:10, 24 December 2024)
- ML19344A411 + (16:49:11, 24 December 2024)
- ML19344A407 + (16:49:14, 24 December 2024)
- ML19344A408 + (16:49:14, 24 December 2024)
- ML19344A405 + (16:49:15, 24 December 2024)
- ML19344A404 + (16:49:20, 24 December 2024)
- ML19344A401 + (16:49:21, 24 December 2024)
- ML19344A402 + (16:49:21, 24 December 2024)
- ML19344A400 + (16:49:22, 24 December 2024)
- ML19344A399 + (16:49:23, 24 December 2024)
- ML19344A398 + (16:49:24, 24 December 2024)
- ML19344A396 + (16:49:25, 24 December 2024)
- ML19344A393 + (16:49:27, 24 December 2024)
- ML19344A392 + (16:49:28, 24 December 2024)
- ML19344A391 + (16:49:29, 24 December 2024)
- ML19344A390 + (16:49:30, 24 December 2024)
- ML19344A389 + (16:49:31, 24 December 2024)
- ML19344A386 + (16:49:32, 24 December 2024)
- ML19344A388 + (16:49:32, 24 December 2024)
- ML19344A385 + (16:49:33, 24 December 2024)
- ML19344A383 + (16:49:34, 24 December 2024)
- ML19344A382 + (16:49:35, 24 December 2024)
- ML19344A379 + (16:49:36, 24 December 2024)