Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- A01151, Advises of Minor Adjustments to Evaluation Program Re Resolution of Cycle 3 Startup Commitments.Adjustments Are to Optimize Timetable for Critical Path Refueling Activities + (16:36:06, 24 December 2024)
- ML19344B137 + (16:36:12, 24 December 2024)
- ML19344B132 + (16:36:12, 24 December 2024)
- ML19344B129 + (16:36:13, 24 December 2024)
- ML19344B126 + (16:36:15, 24 December 2024)
- 05000327/LER-1980-130-03, /03L-0:on 800709,during Mode 3 & Recovery from Scheduled Reactor Trip from Startup Testing,Differential Pressure Between Primary Containment & Annulus Exceeded Tech Spec Limit.Cause Not Apparent.Operators Instructed + (16:36:17, 24 December 2024)
- 05000327/LER-1980-130, Forwards LER 80-130/03L-0 + (16:36:18, 24 December 2024)
- ML19344B116 + (16:36:20, 24 December 2024)
- 05000321/LER-1980-091-03, /03L-0:on 800724,while Performing Surveillance Procedure HNP-1-3974,control Room Air Intake Chlorine Monitor Calibr & Operability,Fan Motor on Monitor 1Z41-N022B Was Inoperative.Caused by Open Winding on Motor + (16:36:21, 24 December 2024)
- ML19344B111 + (16:36:22, 24 December 2024)
- 05000321/LER-1980-091, Forwards LER 80-091/03L-0 + (16:36:23, 24 December 2024)
- 05000368/LER-1980-055-03, /03L-0:on 800721,PPS Channel D Received Spurious Dnbr/Lpd Trips During Mode 1 Operation.Caused by Fluctuating CPC Dnbr/Lpd Temp Input Calculations.Temp Transmitter 2TT- 4711-4 Electrical Leads Checked & Tightened + (16:36:27, 24 December 2024)
- 05000368/LER-1980-054-03, /03L-0:on 800721,control Room Emergency Chiller 2VE-1B Found Inoperable During Mode 1 Operation.Caused by Unit Tripping on High Pressure Due to Improperly Operating Control Valve 2CV-1506-2.Control Valve Repaired + (16:36:29, 24 December 2024)
- 05000368/LER-1980-053-03, /03L-0:on 800721,CEAC 1 Failed During Mode 1 Operation.Cause Not Determined.Ceac Sys Software Reloaded, Periodic Tests Performed & Failure Indications Returned to Normal.Ceac Returned to Operable Status on All Channels + (16:36:31, 24 December 2024)
- ML19344B084 + (16:36:32, 24 December 2024)
- ML19344B079 + (16:36:33, 24 December 2024)
- 05000327/LER-1980-079-03, /03L-0:on 800716,during Performance of Special Test 2,ice Bed Temp Exceeded Tech Spec Limit.Caused by Load Shedding Requirements of Special Maint Instruction 13.Glycol Cooling Sys Placed in Svc + (16:36:34, 24 December 2024)
- 05000320/LER-1980-032-03, /03L-0:on 800719,during re-dewatering of EPICOR-I Liner,Leak of Radioactive Liquid Discovered.Caused by Worn Mating Surfaces of Quick Release Coupling.Requirements for Insp of Couplings Before & After Engagement Adopted + (16:36:36, 24 December 2024)
- 05000327/LER-1980-079, Forwards LER 80-079/03L-0 + (16:36:38, 24 December 2024)
- ML19344B069 + (16:36:39, 24 December 2024)
- ML19344B067 + (16:36:40, 24 December 2024)
- ML19344B066 + (16:36:41, 24 December 2024)
- ML19344B065 + (16:36:41, 24 December 2024)
- 05000320/LER-1980-032, Forwards LER 80-032/03L-0 + (16:36:43, 24 December 2024)
- 05000313/LER-1980-026, Forwards LER 80-026/03L-0 + (16:36:52, 24 December 2024)
- ML19344B058 + (16:36:54, 24 December 2024)
- 05000320/LER-1980-029-01, /01L-0:on 800714,during Recovery Mode Operation, Gray balance-of-plant Diesel Generator Failed to Start During Testing.Caused by Damaged Connection at Speed Sensor. Connection Repaired & Diesel Generator Testing Completed + (16:36:55, 24 December 2024)
- 05000320/LER-1980-029, Forwards LER 80-029/01L-0 + (16:36:57, 24 December 2024)
- 05000346/LER-1980-059-03, /03L-0:on 800720,control Room Operators Noticed NI-1 Startup Rate Peg High,Then Low.Source Range Indication for NI-1 Went to Zero.Cause Not determined.Pre-amp Gain Link Readjusted to Raise Signal Pulses + (16:36:59, 24 December 2024)
- 05000346/LER-1980-059, Forwards LER 80-059/03L-0 + (16:37:01, 24 December 2024)
- ML19344B046 + (16:37:02, 24 December 2024)
- ML19344B045 + (16:37:03, 24 December 2024)
- ML19344B043 + (16:37:04, 24 December 2024)
- ML19344B041 + (16:37:05, 24 December 2024)
- 05000219/LER-1980-032-01, /01T-0:on 800806,both Containment Spray Pump Compartment Doors Found Open.Caused by Lack of Administrative Controls.Engineering Evaluation Planned Re Effective Controls of Access Through Water Tight Doors + (16:37:09, 24 December 2024)
- 05000219/LER-1980-032, Forwards LER 80-032/01T-0 + (16:37:11, 24 December 2024)
- 05000296/LER-1980-027-03, /03L-0:on 800714,while Performing Surveillance Instruction 4.5.b.1.d,RHR Pump Motor 3D Tripped on Instantaneous Overcurrent on Phase a When Started.No Cause Stated.Relay Setpoint Change Being Investigated + (16:37:13, 24 December 2024)
- 05000296/LER-1980-027, Forwards LER 80-027/03L-0 + (16:37:19, 24 December 2024)
- 05000327/LER-1980-136-03, /03L-0:on 800716,shield Bldg Vent Radiation Monitor 2-RM-90-100B Declared Inoperable When Count Rate Found Out of Tolerance in Nonconservative Direction During Source Calibr.Caused by Defective Photomultiplier Tube + (16:37:22, 24 December 2024)
- 05000327/LER-1980-136, Forwards LER 80-136/03L-0 + (16:37:23, 24 December 2024)
- ML19344B029 + (16:37:24, 24 December 2024)
- ML19344B028 + (16:37:26, 24 December 2024)
- 05000327/LER-1980-125-01, /01T-0:on 800725,auxiliary Feedwater Control Valves 1-PCV-3-122 & -132,1-LCV-3-148,-156,-164 & -171, 1-LCV-3-172,-173,-174 & -175 Noted Not Meeting Seismic Criteria.Caused by Div of Engineering Design Error + (16:37:27, 24 December 2024)
- ML19344B025 + (16:37:29, 24 December 2024)
- 05000327/LER-1980-125, Forwards LER 80-125/01T-0 + (16:37:30, 24 December 2024)
- ML19344B022 + (16:37:31, 24 December 2024)
- ML19344B021 + (16:37:32, 24 December 2024)
- ML19344B019 + (16:37:33, 24 December 2024)
- ML19344B018 + (16:37:34, 24 December 2024)
- ML19344B017 + (16:37:35, 24 December 2024)
- ML19344B015 + (16:37:36, 24 December 2024)