Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000348/LER-1981-018-03, /03L-0:on 810413,intermediate Range Channel N-35 Meter Reading Failed to Meet Test Requirements.Caused by Defective Log Current Amplifier Card.Card Replaced + (00:23:26, 24 December 2024)
- ML19350D800 + (00:23:27, 24 December 2024)
- ML19350D799 + (00:23:28, 24 December 2024)
- 05000339/LER-1981-034-03, /03L-0:on 810418,during Mode 1 Operation,Axial Power Distribution Monitoring Sys Did Not Print Out Results of Fj(Z) Scan.Caused by Failure of Printer.Printer Repaired + (00:23:29, 24 December 2024)
- 05000339/LER-1981-034, Forwards LER 81-034/03L-0 + (00:23:31, 24 December 2024)
- ML19350D795 + (00:23:32, 24 December 2024)
- ML19350D794 + (00:23:33, 24 December 2024)
- ML19350D792 + (00:23:34, 24 December 2024)
- ML19350D791 + (00:23:35, 24 December 2024)
- ML19350D788 + (00:23:36, 24 December 2024)
- ML19350D789 + (00:23:36, 24 December 2024)
- ML19350D787 + (00:23:37, 24 December 2024)
- 05000338/LER-1981-019-03, /03L-0:on 810420,during 100% Power,Pressurizer Level Channel I Indicated High.Caused by Instrument Drift, Leakage of Condensate Pot Packing Root Valve & Pressure Transmitter Isolation Valve.Transmitter Was Recalibr + (00:23:38, 24 December 2024)
- 05000338/LER-1981-019, Forwards LER 81-019/03L-0 + (00:23:40, 24 December 2024)
- 0CAN058109, Confirms That Work Has Been Completed Re Requirements of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Final Rept Is Being Reviewed & Will Be Forwarded by 810601 + (00:23:41, 24 December 2024)
- ML19350D781 + (00:23:43, 24 December 2024)
- ML19350D782 + (00:23:43, 24 December 2024)
- ML19350D780 + (00:23:44, 24 December 2024)
- ML19350D778 + (00:23:44, 24 December 2024)
- ML19350D777 + (00:23:45, 24 December 2024)
- TXX-3318, Interim Deficiency Rept Re Use of Potentially Combustible Yellow 77 Cable Lubricant,Initially Reported on 810120. Evaluation Will Be Completed by 810831 + (00:24:02, 24 December 2024)
- ML19350D773 + (00:24:04, 24 December 2024)
- ML19350D772 + (00:24:06, 24 December 2024)
- ML19350D770 + (00:24:10, 24 December 2024)
- ML19350D769 + (00:24:11, 24 December 2024)
- 05000302/LER-1981-022, Forwards LER 81-022/03L-0 + (00:24:12, 24 December 2024)
- ML19350D766 + (00:24:13, 24 December 2024)
- ML19350D765 + (00:24:14, 24 December 2024)
- ML19350D763 + (00:24:15, 24 December 2024)
- ML19350D761 + (00:24:16, 24 December 2024)
- ML19350D760 + (00:24:16, 24 December 2024)
- IR 05000346/1981006 + (00:24:21, 24 December 2024)
- ML19350D758 + (00:24:22, 24 December 2024)
- ML19350D756 + (00:24:23, 24 December 2024)
- ML19350D755 + (00:24:23, 24 December 2024)
- ML19350D754 + (00:24:24, 24 December 2024)
- ML19350D753 + (00:24:25, 24 December 2024)
- ML19350D752 + (00:24:25, 24 December 2024)
- ML19350D751 + (00:24:26, 24 December 2024)
- ML19350D748 + (00:24:28, 24 December 2024)
- ML19350D750 + (00:24:28, 24 December 2024)
- W3P81-1286, Forwards Application to Amend OL Application,Submitted as Amend 18 to Fsar.Amend Includes Info Re Structural Engineering,Tmi Action Items,Procedures & Test Review, Geosciences,Effluent Treatment & Containment & Reactor Sys + (00:24:29, 24 December 2024)
- ML19350D744 + (00:24:32, 24 December 2024)
- ML19350D745 + (00:24:32, 24 December 2024)
- ML19350D742 + (00:24:33, 24 December 2024)
- ML19350D743 + (00:24:33, 24 December 2024)
- ML19350D740 + (00:24:36, 24 December 2024)
- ML19350D741 + (00:24:36, 24 December 2024)
- ML19350D739 + (00:24:37, 24 December 2024)
- ML19350D738 + (00:24:38, 24 December 2024)
- ML19350D737 + (00:24:41, 24 December 2024)