w e
CollSumBIS Power u,,, -
{Q Vice President - Projects, Engineering and Construction c.a.,.i artic : is4s w c.cn.ii no.a. a.cm.oa. ui 4s2ai. isi7: 7sao4sa 81-05 #1 May 15,1981 q ;,a, 2
c
- g e at0*/! /e 2 w'h 9
Mr J G Keppler, Regional Director g
Office of Inspection and Enforcement
/rl/ W j "n I9 8 1 %
US Nuclear Regulatory Co= mission u.s, g$ljeg Region III 93 cc 799 Roosevelt Road A
Glen Ellyn, IL 60137 Q./Tg j gi\\.-
MIDLAND PROJECT -
DOCKET NCS 50-329 AND 50-330 SHEAR REINFORCEMENT AT MAJOR CONTAINMEIE PENETRATIONS FILE:
0.1. 9 53 UFI: 73*10*01,00210(S),03006(E) SERIAL: 11993 This letter provides a.1 interim 50 55(e) report concerning the adequacy of shear reinforcements at major containment penetrations. This condition was
-reported to Messrs R J Cook and D C Boyd of your staff on April 17, 1981.
The attachments to this letter provide a statement of the condition and the status of the corrective actions.
Anot'her report vill be sent en or before July 31, 1981.
'4RB/1r Attachments :
(1) Bechtel Management Corrective Action Report #51, dated April 17, 1981 (2) Bechtel Management Corrective Action Report #51, Interim Report 1, dated May 7,1981 CC: Director of Office of Inspecticn & Enforcement Att Mr Victor Stello, USNRC (15)
Director, Office of Management Information & Program Control, USNRC (1)
PJCook, USNRC Resident Inspector Midland Nuclear Plant (1) 8105190k[k
L s..
o S rial 11993 81-05 #1-2 CC: CBechhoefer, ASLB Panel.
RSDecker, ASLB Panel FPCowan, ASLB Panel AS&L Appeal Panel L'
NMCherry, Esq MSinclair CRStephens, USNRC WDPaton, Esq, USNRC FJKelly, Esq, Attorney General SHPreeman, Esq, Asst Attorney General GTTaylor, Esq, Asst Attorney General WHMarshall GJMerritt, Esq, TNK&J Great Lakes QA Managers 4
o b
e
.' F, MANAGEMENT CORRECTIVE ACTION REPORT OUALITY ASSURANCE PROGRAM
^*t t
er i993 02P9H 81-05 s1 027980 REPORT NO.:
51 JOB NO.:
7220 O NO.:
DATE:
April 17, 1981 l DESCRIPTION * (including References):
During an examination of calculations for the Reactor Containment Building equipment hatch area, personnel lock, and emergency lock penetration, it was determined that the amount of shear reinforcement provided for these areas is less for Midland than for other similar plants. The safety implications of this matter will be determined after completion of the Recohmended Actions (1, 2, and 3) listed below.
Consumers Power Company has reported this condition to the NRC as a 10CFR50.55(e]
(cont.
RECOMMENDED ACTION * (Optional):
1.
Examine the design requirements for major penetration.
2.
Examine the design criteria.
3.
After Actions 1 and 2 are completed, detailed stress analyses will be performed, if required.
4.
Submit a final report after the strese analyses are completed.
5.
Coordinate and issue a status report by May 7, 1981.
REFERRED TO:
(3 Engineering O Construction O OA Management O
- [
O Procurement ISSUED BY:
-4 A f/i. Di6TPkW N y g /* '
M,='s o'a cy~
o..
l
~
PO N E 11 REPORTABLE DEFICIENCY l
NOTIFl UENT: April 17, 1981
[3YES M
O NO l
P'roi=i u a.e-
[
o I
Ill CAUSE:
CORRECTIVE ACTION TAKEN:
AUTHORIZED BY:
o AAPO O'Stassufese PaoJ OtSTR*BUTtoes oTHER DISTRieuftose won or constaucfos c es consta oc enon ma os oA. TPo FORMAL REPORT TO CUENT won or ee.sta.e cue =T oPo.oAwaa (If Section 11 Applies) o+
MCR or Pn0Cumf u(NT ProCE t.APo oA MGR MGA or PmoJ oPEm4TIoNS PROJECT CoNsTR MOR
$FPo oA MGM una er cuaufv Assuanace Paastc7 ano m CORRECTIVE ACTION IMPLEMENTED CONS 7muCitoN WGR PaoJECT MOR E NG#sE EmpeQ WOR PROJ PRoCunfutNT MOR SuPPutM ouAuTY MGA SITE MOR oc suremason VERIFIED BY
'Descree in space proed and attach reference document.
(
P,.,.e, w s.
o f
l AaPo coce Section Number Page of l
l 02'7980
- 31 April 17, 1981 Page 2 DESCRIPTION CONT.
"potentially reportable" item on April 17, 1981 at 12:53 p.m.
w.
t l
i Serial 11993 81-05 #1 Bechtel Power Corporation ggg/
777 East Eisenhower Parkway Ann Arbor, Michigan we.sAaeoss P O Bos 1000, Ann Arbor. Michigan 48106 May 11, 1981 BLC-10774 Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 Attention:
Mr. J.W. Cook Vice President t
Projects, Engineering and Construction
Subject:
Midland Plant Units 1 and 2 Consumers Power Company Bechtel Job 7220 MCAR 51, Interim Report 1 Interim Report 1 for MCAR 51, shear reinforcement at major containment I
building penetrations, is attached for your use.
The next interim report is scheduled to be issued by August 6, 1981.
Very uly yours, s
John A. Rutger Project Manag r W
JAR /YPT/lh 5/7/1
Attachment:
MCAR 51, Interim Report 1 cc:
R.C. Bauma j
.. Aeeley B.W. !!arguglio l
(all w/a)
I l
Written Response Requested: No
n 029495 Bechtel Associates Professional Corporation
SUBJECT:
MCAR 51 (issued 4/21/81) l Shear Reinforcement at Major Containment Building l
INTERIM REPORT 1 l
Date:
May 7, 1981 l
PROJECT:
Consumers Power Company i
Midland Plant Units 1 and 2 Bechtel Job 7220 l
Intraduction The discrepancies discussed in this report concern the amount of shear reinforcer.ent provided around the containment building major penetra-
[
tions.
Background
While e amining drawings for the containment shell, it was deter-mined that there is less shear reinforcement around the equipment hatch, personnel lock, and the emergency airlock penetrations than in other i
projects of similar design. The design for these areas was done in November 1973,'the drawings for the equipment hatch were issued for I
construction in July 1974, and the containment walls for Units 1 and 2 l
were constructed in.1976 and 1977.
i Investigative Action i
A preliminary review of the design requirements, the drawings, and the calculations for the equipment hatch has been performed. A similar review will be made for other major penetrations. Based on the this investigative action, it was decided to study the analytical model for the equipment hatch and review the existing design in detail to evaluate existing stress and required reinforcement. The ecmputer input data for this analysis is cur-rently being processed.
Corrective Action Once the output from the investigative analysis is obtained, further recom-i mendations or conclusior-vill be made. A determination of corrective actions for the other major pen trations, if necessary, will be made at a later date.
^
Safety Implications If undetected, this potential deficiency could possibly have an adverse affect on the safety of the Midland plant.
i i
l l
1 i
,., ~ ~, - -. _, _, - -..
s.
029495 Bechtel Associates Professional Corporation MCAR 51 Interim Report i May 7, 1981 Page 2 Reportability This condition was reported to the NRC by Consumers Power Company as "potentially reportable" under 10 CTR 50.55(e) on April 17, 1981.
s Submitted by: D[6 k[g A proved by: MeM A /, ggl( w y P