Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350D830 + (00:22:53, 24 December 2024)
- 05000324/LER-1981-045-03, /03L-0:on 810412,high Reactor Coolant Vessel Conductivity Was Discovered.Caused by Excessive Main Condenser Waterbox Tube Leakage Due to Tube Plugs Falling Out.Plugs Replaced + (00:22:55, 24 December 2024)
- 05000327/LER-1981-048, Forwards LER 81-048/03L-0 + (00:22:56, 24 December 2024)
- ML19350D826 + (00:22:58, 24 December 2024)
- 05000324/LER-1981-045, Forwards LER 81-045/03L-0 + (00:22:59, 24 December 2024)
- 05000324/LER-1981-047-03, /03L-0:on 810417,high Reactor Coolant Vessel Conductivity Was Discovered.Caused by Condenser Tube Plugs Isolating Tube Leaks Falling Out Due to Aging & Environ Conditions.Condenser Plugs Being Replaced + (00:23:01, 24 December 2024)
- 05000259/LER-1981-011-03, /03L-0:on 810421,local Fire Protection Panel Circuit Breaker 25-331 Tripped & de-energized Panel.Cause Unknown.Breaker Reset + (00:23:03, 24 December 2024)
- ML19350D821 + (00:23:05, 24 December 2024)
- 05000324/LER-1981-047, Forwards LER 81-047/03L-0 + (00:23:06, 24 December 2024)
- ML19350D818 + (00:23:08, 24 December 2024)
- 05000259/LER-1981-011, Forwards LER 81-011/03L-0 + (00:23:09, 24 December 2024)
- 05000302/LER-1981-021-03, /03L-0:on 810411,failure of Inverter D Resulted in Loss of Vital Bus VBDP-6.Caused by Shorted Diode & Blown Fuse Which May Have Resulted from Overheating in Inverter Cabinet.Diode & Fuse Replaced & Mod Procedure Revised + (00:23:12, 24 December 2024)
- 05000295/LER-1981-015-03, /03L-0:on 810412,radiation Monitor ORE-0005 High Alarmed.Caused by Setpoint Drift of High Voltage Power Supply Model PN1011.Monitor Recalibr.Power Supplies Adjusted & Will Be Replaced + (00:23:13, 24 December 2024)
- 05000348/LER-1981-021-03, /03L-0:on 810413,output Voltage of Diesel Generator 2C Fell to Zero.Caused by Two Blown Voltage Regulator Fuses.Fuses Replaced + (00:23:15, 24 December 2024)
- 05000302/LER-1981-021, Forwards LER 81-021/03L-0 + (00:23:17, 24 December 2024)
- 05000295/LER-1981-015, Forwards LER 81-015/03L-0 + (00:23:19, 24 December 2024)
- ML19350D807 + (00:23:20, 24 December 2024)
- 05000348/LER-1981-020-03, /03L-0:on 810411,B1F Sequencer Failed to Meet Time Requirement for Picking Up Step 6.Caused by Setpoint Drift of Sequencer Agastat Timer.Timer Adjusted + (00:23:21, 24 December 2024)
- ML19350D805 + (00:23:23, 24 December 2024)
- ML19350D804 + (00:23:24, 24 December 2024)
- ML19350D803 + (00:23:24, 24 December 2024)
- 05000348/LER-1981-018-03, /03L-0:on 810413,intermediate Range Channel N-35 Meter Reading Failed to Meet Test Requirements.Caused by Defective Log Current Amplifier Card.Card Replaced + (00:23:26, 24 December 2024)
- ML19350D800 + (00:23:27, 24 December 2024)
- ML19350D799 + (00:23:28, 24 December 2024)
- 05000339/LER-1981-034-03, /03L-0:on 810418,during Mode 1 Operation,Axial Power Distribution Monitoring Sys Did Not Print Out Results of Fj(Z) Scan.Caused by Failure of Printer.Printer Repaired + (00:23:29, 24 December 2024)
- 05000339/LER-1981-034, Forwards LER 81-034/03L-0 + (00:23:31, 24 December 2024)
- ML19350D795 + (00:23:32, 24 December 2024)
- ML19350D794 + (00:23:33, 24 December 2024)
- ML19350D792 + (00:23:34, 24 December 2024)
- ML19350D791 + (00:23:35, 24 December 2024)
- ML19350D788 + (00:23:36, 24 December 2024)
- ML19350D789 + (00:23:36, 24 December 2024)
- ML19350D787 + (00:23:37, 24 December 2024)
- 05000338/LER-1981-019-03, /03L-0:on 810420,during 100% Power,Pressurizer Level Channel I Indicated High.Caused by Instrument Drift, Leakage of Condensate Pot Packing Root Valve & Pressure Transmitter Isolation Valve.Transmitter Was Recalibr + (00:23:38, 24 December 2024)
- 05000338/LER-1981-019, Forwards LER 81-019/03L-0 + (00:23:40, 24 December 2024)
- 0CAN058109, Confirms That Work Has Been Completed Re Requirements of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Final Rept Is Being Reviewed & Will Be Forwarded by 810601 + (00:23:41, 24 December 2024)
- ML19350D781 + (00:23:43, 24 December 2024)
- ML19350D782 + (00:23:43, 24 December 2024)
- ML19350D780 + (00:23:44, 24 December 2024)
- ML19350D778 + (00:23:44, 24 December 2024)
- ML19350D777 + (00:23:45, 24 December 2024)
- TXX-3318, Interim Deficiency Rept Re Use of Potentially Combustible Yellow 77 Cable Lubricant,Initially Reported on 810120. Evaluation Will Be Completed by 810831 + (00:24:02, 24 December 2024)
- ML19350D773 + (00:24:04, 24 December 2024)
- ML19350D772 + (00:24:06, 24 December 2024)
- ML19350D770 + (00:24:10, 24 December 2024)
- ML19350D769 + (00:24:11, 24 December 2024)
- 05000302/LER-1981-022, Forwards LER 81-022/03L-0 + (00:24:12, 24 December 2024)
- ML19350D766 + (00:24:13, 24 December 2024)
- ML19350D765 + (00:24:14, 24 December 2024)
- ML19350D763 + (00:24:15, 24 December 2024)
- ML19350D761 + (00:24:16, 24 December 2024)