Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000335/1990023 + (05:37:08, 22 February 2018)
- IR 05000389/1989010 + (05:41:15, 22 February 2018)
- IR 05000335/1987008 + (05:50:20, 22 February 2018)
- IR 05000335/1987004 + (05:50:33, 22 February 2018)
- IR 05000335/1980007 + (06:24:41, 22 February 2018)
- ML12083A132 + (11:46:57, 22 February 2018)
- ENS 53207 + (12:30:07, 22 February 2018)
- DNMS + (14:00:38, 22 February 2018)
- Internal Flooding + (21:30:53, 22 February 2018)
- Temporary Modification + (21:39:12, 22 February 2018)
- IR 05000389/1998011 + (02:19:27, 23 February 2018)
- Property:Followed by + (04:33:46, 23 February 2018)
- IR 05000389/1994010 + (04:38:23, 23 February 2018)
- IR 05000389/1993008 + (04:38:34, 23 February 2018)
- IR 05000389/1993005 + (04:38:41, 23 February 2018)
- IR 05000389/1992011 + (04:38:53, 23 February 2018)
- IR 05000389/1991011 + (04:39:35, 23 February 2018)
- RIS 2015-10, Applicability of ASME Code Case N-770-1 As Conditioned in 10 CFR 50.55A, Codes and Standards, to Branch Connection Butt Welds + (06:28:36, 23 February 2018)
- RIS 2015-01, Qualification Requirements for Bolt and Stud Non-Destructive Examinations (TAC Mf4148) + (06:58:54, 23 February 2018)
- RIS 2013-04, Content Specification And Shielding Evaluations For Type B Transportation Packages + (08:09:01, 23 February 2018)
- RIS 2005-01, Rev 1, Changes To Notice Of Enforcement Discretion Process And Staff Guidance + (08:46:52, 23 February 2018)
- RIS 2012-03, Reintegration of Security Into The Reactor Oversight Process Assessment Program + (09:12:36, 23 February 2018)
- RIS 2012-02, Insights Into Recent License Renewal Application Consistency With The Generic Aging Lessons Learned Report + (09:22:37, 23 February 2018)
- RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel + (09:24:35, 23 February 2018)
- RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using An Alternative Method to Manage Cumulative Fatigue At Nuclear Power Reactor Sites + (09:27:36, 23 February 2018)
- RIS 2002-12I, Transportation of Spent Nuclear Fuel Greater Than 100 Grams + (09:40:20, 23 February 2018)
- RIS 2011-09, Available Resources Associated With Extended Storage Of Low-Level Radioactive Waste + (09:45:13, 23 February 2018)
- RIS 2011-14, Metal Fatigue Analysis Performed By Computer Software + (09:45:45, 23 February 2018)
- RIS 2011-10, Request For Licensees To Consider The Nrc'S Public Website For Significant Enforcement Actions When Evaluating Individuals For Employment + (09:52:37, 23 February 2018)
- RIS 2011-01, NRC Policy on Release of Iodine-131 Therapy Patients Under 10 CFR 35.75 to Locations Other Than Private Residences. + (10:11:29, 23 February 2018)
- RIS 2010-10, Withdrawn NRC Regulatory Issue Summary 2010-10 Process For Scheduling Acceptance Reviews Of New Reactor Licensing Applications And Process For Determining Budget Needs For Fiscal Year 2013 + (10:15:17, 23 February 2018)
- RIS 2010-07, Regulatory Requirements For Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break + (10:22:27, 23 February 2018)
- RIS 2010-06, Inservice Inspection And Testing Requirements Of Dynamic Restraints (SNUBBERS) + (10:22:48, 23 February 2018)
- RIS 2009-12, U.S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-Uranium Recovery Policy Regarding Pre-Licensing Construction Activities At Proposed, Unlicensed Uranium Recovery Facilities + (10:26:53, 23 February 2018)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ... + (10:34:01, 23 February 2018)
- RIS 2008-10, 2008/04/11-Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, Nrc, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008) + (10:43:44, 23 February 2018)
- RIS 2006-25, Requirements For the Distribution and Possession of Tritium Exit Signs and the Requirements in 10 CFR 31.5 Ad 32.51A + (10:54:03, 23 February 2018)
- RIS 2007-01, Clarification Of NRC Guidance For Maintaining a Standard Emergency Action Level (EAL) Scheme + (10:54:07, 23 February 2018)
- RIS 2006-20, Guidance for Receiving Enforcement Discretion When Concentrating Uranium At Community Water Systems + (10:54:28, 23 February 2018)
- RIS 2007-09, Examples of Recurring Requests for Additional Information (RAIs) for 10 CFR Part 71 and 72 Applications + (10:54:36, 23 February 2018)
- RIS 2006-18, Wits200500191/Wits200500192/Wits2005193 - NRC Regulatory Issue Summary 2006-18 Requesting Exemption From the Public Dose Limits for Certain Caregivers of Hospital Patients + (10:54:52, 23 February 2018)
- RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (VAC) Systems Housed in Emergency Diesel Generator (EDG) Rooms + (10:55:06, 23 February 2018)
- RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph Iii.G.2 Operator Manual Actions + (10:55:10, 23 February 2018)
- RIS 2006-08, Publicly Available Cover Letters For Security-Related Inspection Reports + (10:55:20, 23 February 2018)
- RIS 2006-14, NRC Regulatory Issue Summary - Enforcement Requirements for Facility Changes Under 10 CFR 70.72 (c) (2) + (10:55:24, 23 February 2018)
- RIS 2006-09, Nrc'S Procedures For Review of Decommissioning Funding Assurance Reports + (10:55:30, 23 February 2018)
- RIS 2006-02, Good Practices For Licensee Performance During The Emergency Preparedness Component of Force-On-Force Exercises + (10:57:03, 23 February 2018)
- RIS 2005-07, Performance of Manual Actions to Satisfy the Requirements of 10 CFR Part 50 Appendix R Section Iii.G.2 + (10:59:27, 23 February 2018)
- RIS 2004-14, Focusing Resources in the Office of Nuclear Reactor Regulation As a Result of Review of Security Plan Changes + (10:59:48, 23 February 2018)
- RIS 2004-09, Status on Deferral of Active Regulation of Ground-Water Protection at In Situ Leach Uranium Extraction Facilities + (11:00:02, 23 February 2018)
- RIS 2004-13, Official Exhibit - ENT000290-00-BD01 - NRC Regulatory Issue Summary 2004-13 Consideration Of Sheltering In Licensee'S Range Of Protective Action Recommendations + (11:00:11, 23 February 2018)