Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005E166 + (13:45:48, 23 December 2024)
- ML20005E167 + (13:45:48, 23 December 2024)
- ML20005E164 + (13:45:49, 23 December 2024)
- 05000029/LER-1989-015, :on 891126,steam Generator Blowdown Continuous Composite Sampler Declared Inoperable & Analysis Not Done within 24 H.Caused by Failure to Follow Chemistry Procedures Correctly.Chemistry Personnel Counseled + (13:45:51, 23 December 2024)
- ML20005E162 + (13:45:52, 23 December 2024)
- ML20005E161 + (13:45:53, 23 December 2024)
- ML20005E160 + (13:45:54, 23 December 2024)
- ML20005E159 + (13:45:56, 23 December 2024)
- ML20005E158 + (13:45:57, 23 December 2024)
- IR 05000302/1989029 + (13:46:03, 23 December 2024)
- ML20005E155 + (13:46:05, 23 December 2024)
- ML20005E154 + (13:46:06, 23 December 2024)
- ML20005E153 + (13:46:07, 23 December 2024)
- ML20005E152 + (13:46:09, 23 December 2024)
- 05000271/LER-1989-025, :on 891128,primary Containment Isolation Sys Group III & Standby Gas Treatment Sys Initiation Occurred. Caused by Failure of Reactor Bldg Ventilation Radiation Monitor/Sensor Converter.Converter Replaced + (13:46:10, 23 December 2024)
- IR 05000482/1989029 + (13:46:15, 23 December 2024)
- ML20005E148 + (13:46:17, 23 December 2024)
- ML20005E146 + (13:46:19, 23 December 2024)
- ML20005E144 + (13:46:20, 23 December 2024)
- ML20005E141 + (13:46:22, 23 December 2024)
- ML20005E142 + (13:46:22, 23 December 2024)
- ML20005E140 + (13:46:23, 23 December 2024)
- PY-CEI-NRR-1115, Forwards Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance.Each motor- Operated Valve Will Be Stroke Tested to Verify Valve Operability at no-pressure & no-flow Conditions + (13:46:24, 23 December 2024)
- 05000458/LER-1989-041, :on 891125,unplanned ESF Actuation Occurred as Result of Two Leads Shorted Together During Testing of Control Circuitry,Causing Valve Isolation from Suppression Pool.Sys Lineup Restored to Normal Position + (13:46:30, 23 December 2024)
- ML20005E133 + (13:46:32, 23 December 2024)
- ML20005E132 + (13:46:33, 23 December 2024)
- W3P89-2162, Responds to Generic Ltr 89-10 Re safety-related motor- Operated Valve Testing & Surveillance.Util Will Complete All design-basis Reviews,Analyses,Verifications,Insps & Tests, Per Items a Through H by End of Sixth Refueling Outage + (13:46:34, 23 December 2024)
- ML20005E130 + (13:46:37, 23 December 2024)
- ML20005E129 + (13:46:38, 23 December 2024)
- ML20005E128 + (13:46:39, 23 December 2024)
- IR 05000483/1989019 + (13:46:44, 23 December 2024)
- ML20005E124 + (13:46:45, 23 December 2024)
- ML20005E123 + (13:46:46, 23 December 2024)
- PNO-III-89-087, on 891221,reactor Automatically Shut Down as Result of Negative Flux Rate,Causing Loss of Power to Reactor Coolant & Main Condenser Circulation Pumps.Forced Recirculation Restored & Inspector Sent to Plant + (13:46:49, 23 December 2024)
- ML20005E121 + (13:46:50, 23 December 2024)
- ML20005E117 + (13:48:26, 23 December 2024)
- 05000327/LER-1989-030, :on 891204,fire Suppression Sys Deluge Valve Isolated More than 1 H W/O Required Continuous Fire Watch Establishment.Caused by Personal Communication Breakdown. Valve Opened & Foreman in Charge Counseled + (13:48:28, 23 December 2024)
- IR 05000295/1989034 + (13:48:45, 23 December 2024)
- ML20005E106 + (13:48:47, 23 December 2024)
- ML20005E105 + (13:49:03, 23 December 2024)
- ML20005E103 + (13:49:04, 23 December 2024)
- ML20005E102 + (13:49:06, 23 December 2024)
- ML20005E101 + (13:49:09, 23 December 2024)
- ML20005E099 + (13:49:11, 23 December 2024)
- ML20005E098 + (13:49:12, 23 December 2024)
- 05000352/LER-1989-058, :on 891123,actuation of Group III Primary Containment & Reactor Vessel Isolation Control Sys Resulted in Automatic Isolation of Rwcu.Caused by Failure of Flow Summer Card.Card Replaced + (13:49:18, 23 December 2024)
- ML20005E094 + (13:49:19, 23 December 2024)
- PNO-III-89-089, on 891226,while Operating at 100% Power, Reactor Automatically Shut Down as Result of Negative Flux Rate.Caused by Reactor Protection Motor Generator Output Breakers Opening.Power Restored to Reactor Coolant Pump + (13:49:21, 23 December 2024)
- ML20005E090 + (13:49:25, 23 December 2024)
- U-601576, Advises That Revised Fitness for Duty Program Will Meet 10CFR26 Requirements,Effective 900103.Util Intends to Test for Substances Listed at Indicated cut-off Levels + (13:49:26, 23 December 2024)
- IR 05000029/1989022 + (13:49:39, 23 December 2024)