Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20010E292 + (11:33:23, 21 December 2024)
- ML20010E291 + (11:33:25, 21 December 2024)
- ML20010E288 + (11:33:29, 21 December 2024)
- ML20010E289 + (11:33:29, 21 December 2024)
- 05000346/LER-1981-043-03, /03L-0:on 810727,RE 5030 Pump Tripped.Caused by Component Failure Due to Worn Out Part.Pump Replaced + (11:33:31, 21 December 2024)
- 05000346/LER-1981-043, Forwards LER 81-043/03L-0 + (11:33:33, 21 December 2024)
- ML20010E283 + (11:33:34, 21 December 2024)
- ML20010E284 + (11:33:34, 21 December 2024)
- ML20010E280 + (11:33:35, 21 December 2024)
- ML20010E282 + (11:33:35, 21 December 2024)
- ML20010E279 + (11:33:36, 21 December 2024)
- ML20010E278 + (11:33:37, 21 December 2024)
- ML20010E277 + (11:33:38, 21 December 2024)
- ML20010E274 + (11:33:39, 21 December 2024)
- ML20010E276 + (11:33:39, 21 December 2024)
- ML20010E273 + (11:33:40, 21 December 2024)
- AECM-81-334, Forwards Preservice Insp Program,Attachments 1,2 & 3 & Books 1 & 2,Revision a for Unit 1 + (11:33:41, 21 December 2024)
- 05000315/LER-1981-029-03, /03L-0:on 810723,while Filling & Venting RCS, Apparent Pressurizer Heatup Transient Occurred in Excess of Tech Specs.Caused by Displaced Water from Pressurizer Into Steam Generator Tubes Due to Rapid Increase in RCS Pressure + (11:33:44, 21 December 2024)
- IR 05000373/1981026 + (11:33:49, 21 December 2024)
- IR 05000247/2019411 + (11:33:50, 21 December 2024)
- 05000315/LER-1981-029, Forwards LER 81-029/03L-0 + (11:33:51, 21 December 2024)
- ML20010E260 + (11:33:53, 21 December 2024)
- 05000316/LER-1981-034, Updated LER 81-034/04X-0:between 810617 & 810715,detector on RMS Channel R-19 Failed & Steam Generator Blowdown Flash Tank Experienced Small primary-to-secondary Leak.Caused by Failure of Meter,Model 654.Procedures Revised + (11:33:55, 21 December 2024)
- 05000316/LER-1981-037-03, /03L-0:on 810728 & 29,containment Pressure hi-hi Bistable Found to Trip Outside Tech Spec Requirements.Caused by Instrument Drift.Bistable Recalibr.During Retest,Bistable Actuation Point Found Excessive.Bistable Replaced + (11:34:04, 21 December 2024)
- ML20010E255 + (11:34:06, 21 December 2024)
- 05000316/LER-1981-037, Forwards LER 81-037/03L-0 & Updated LER 81-034/04X-1 + (11:34:07, 21 December 2024)
- ML20010E252 + (11:34:10, 21 December 2024)
- IR 05000294/1981001 + (11:34:12, 21 December 2024)
- ML20010E248 + (11:34:14, 21 December 2024)
- IR 05000002/1981003 + (11:34:15, 21 December 2024)
- ML20010E244 + (11:34:18, 21 December 2024)
- 05000311/LER-1981-078-03, /03L-0:on 810727,individual Rod Position Indicator & Control Rod Bank Demand Indicator for Rod 2C1 Were in Disagreement.Caused by Calibr Drift of Individual Rod Position Indicator.Indicator Recalibr + (11:34:19, 21 December 2024)
- ML20010E241 + (11:34:21, 21 December 2024)
- 05000311/LER-1981-076-03, /03L-0:on 810727,Number 24 Reactor Coolant Flow Channel 2 Noted Reading Higher than Other Two Channels. Caused by Failure of Transmitter 2FT-445.Transmitter Replaced & Returned to Svc + (11:34:22, 21 December 2024)
- 05000311/LER-1981-078, Forwards LER 81-078/03L-0.Detailed Event Analysis Encl + (11:34:23, 21 December 2024)
- 05000311/LER-1981-076, Forwards LER 81-076/03L-0.Detailed Event Analysis Encl + (11:34:25, 21 December 2024)
- ML20010E235 + (11:34:26, 21 December 2024)
- 05000311/LER-1981-075-03, /03L-0:on 810727,containment Atmosphere Particulate Radioactivity Monitoring Detector 2R11A Found to Be Out of Spec & Declared Inoperable.Caused by Detector Being one-half Inch Back from Proper Position in Lead Pig + (11:34:27, 21 December 2024)
- ML20010E232 + (11:34:29, 21 December 2024)
- 05000311/LER-1981-075, Forwards LER 81-075/03L-0.Detailed Event Analysis Encl + (11:34:30, 21 December 2024)
- ML20010E228 + (11:34:32, 21 December 2024)
- 05000277/LER-1981-038-01, /01T-0:on 810812,cable Designation & Routing Errors Discovered on 4-kV Emergency Bus Breaker Control Cable Schemes,Resulting in Separation Deficiencies on Various Control Switches & Relays.Caused by Design Error + (11:34:33, 21 December 2024)
- PNO-I-81-097, on 810827,tube Failure in Shutdown Cooling Sys Heat Exchanger C Resulted in Leakage of Reactor Coolant Into Reactor Bldg Closed Cooling Water Sys.Cause Undetermined.Plant Startup Delayed Pending Investigation + (11:34:39, 21 December 2024)
- ML20010E222 + (11:34:40, 21 December 2024)
- ML20010E223 + (11:34:40, 21 December 2024)
- ML20010E221 + (11:34:41, 21 December 2024)
- ML20010E220 + (11:34:42, 21 December 2024)
- ML20010E219 + (11:34:42, 21 December 2024)
- ML20010E216 + (11:34:43, 21 December 2024)
- ML20010E217 + (11:34:43, 21 December 2024)
- ML20010E214 + (11:34:44, 21 December 2024)