Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20028D207 + (23:46:21, 20 December 2024)
- ML20028D205 + (23:46:26, 20 December 2024)
- ML20028D202 + (23:46:27, 20 December 2024)
- ML20028D203 + (23:46:27, 20 December 2024)
- ML20028D201 + (23:46:28, 20 December 2024)
- ML20028D200 + (23:46:29, 20 December 2024)
- 05000325/LER-1982-148-03, /03L-0:on 821208,instrument Chart Paper Indicating post-accident Monitoring Suppression Pool Level Data Found Not Advancing.Caused by Unscrewed Drive Front Sprocket Gear. Sprocket Gear Positioned & Fastened + (23:46:33, 20 December 2024)
- 05000325/LER-1982-148, Forwards LER 82-148/03L-0 + (23:46:35, 20 December 2024)
- 05000325/LER-1982-150-03, /03L-0:on 821209,main Steam Line Flow High Primary Containment Isolation Signal 1-B21-PDTM-N006-D-1 Showed Instrument Downscale Indication.Caused by Defective Amplifier Board in Instrument Transmitter B21-DPT-N006D + (23:46:37, 20 December 2024)
- 05000325/LER-1982-150, Forwards LER 82-150/03L-0 + (23:46:42, 20 December 2024)
- 05000324/LER-1982-138-03, /03L-0:on 821207,during Plant Operation,Rbma Inoperable Annunciator Received When Any of 15 Listed Control Rods Selected.Caused by Failed Q10 Transistor on First Level Multiplexer Card.Card Replaced + (23:46:43, 20 December 2024)
- 05000324/LER-1982-138, Forwards LER 82-138/03L-0 + (23:46:45, 20 December 2024)
- ML20028D178 + (23:46:46, 20 December 2024)
- 05000269/LER-1982-019-03, /03L-0:on 821207,valve 1HP-25 Failed to Open Remotely During Operational Valve Function Test.Caused by Component Failure.Valve Manually Cracked Open,Cycled & Stroke Tested + (23:46:47, 20 December 2024)
- 05000269/LER-1982-019, Forwards LER 82-019/03L-0.Detailed Event Analysis Encl + (23:46:49, 20 December 2024)
- ML20028D172 + (23:46:50, 20 December 2024)
- ML20028D164 + (23:46:59, 20 December 2024)
- ML20028D161 + (23:47:03, 20 December 2024)
- IR 05000285/1981025 + (23:47:04, 20 December 2024)
- ML20028D159 + (23:47:05, 20 December 2024)
- ML20028D158 + (23:47:06, 20 December 2024)
- ML20028D156 + (23:47:08, 20 December 2024)
- 05000324/LER-1982-127-03, /03L-0:on 821206,drywell Oxygen Concentration Exceeded 4% Following Core Auxiliary Cooling (CAC) Sys Failures.Caused by Ruptured Section of CAC Sys Piping. Damaged Piping Section Replaced + (23:47:10, 20 December 2024)
- AECM-83-021, Forwards Monthly Operating Rept for Dec 1982 + (23:47:11, 20 December 2024)
- ML20028D146 + (23:47:13, 20 December 2024)
- 05000324/LER-1982-127, Forwards LER 82-127/03L-0 + (23:47:14, 20 December 2024)
- ML20028D143 + (23:47:15, 20 December 2024)
- ML20028D142 + (23:47:19, 20 December 2024)
- ML20028D141 + (23:47:21, 20 December 2024)
- ML20028D140 + (23:47:25, 20 December 2024)
- ML20028D139 + (23:47:26, 20 December 2024)
- ML20028D137 + (23:47:27, 20 December 2024)
- ML20028D132 + (23:47:28, 20 December 2024)
- ML20028D136 + (23:47:28, 20 December 2024)
- 05000339/LER-1982-083-03, /03L-0:on 821213,emergency Diesel Generator 2J Removed from Svc.Caused by Failure of 40X Unexcitation Alarm Relay Coil.Carbon Deposits & Arcing Damage of 40/76 Relay Contact Prevented Good Contact + (23:47:35, 20 December 2024)
- ML20028D130 + (23:47:36, 20 December 2024)
- ML20028D128 + (23:47:37, 20 December 2024)
- ML20028D127 + (23:47:37, 20 December 2024)
- NG-83-0001, Responds to IE Bulletin 82-04 Re Electrical Penetrations Using Hard Epoxy Module Design.No Bunker-Ramo Electrical Penetrations Installed or Planned for Use in safety-related Sys + (23:47:38, 20 December 2024)
- 05000339/LER-1982-083, Forwards LER 82-083/03L-0 + (23:47:40, 20 December 2024)
- 05000416/LER-1982-160-03, /03L-0:on 821208,smoke Detectors N603A & B in Zone 2-18 Covered to Prevent Actuation While Welding in Progress.Caused by Planned Maint Activity.Fire Watch Established.Detectors Returned to Svc + (23:47:45, 20 December 2024)
- 05000395/LER-1982-053-03, /03L-0:on 821206,during Mode 1,spurious High & Low Meter Indications Observed on Main Control Board Indicator FI-494 for Steam Generator C Flow.Caused by Failure of Circuit Board FY-494.Board Replaced + (23:47:48, 20 December 2024)
- ML20028D115 + (23:47:49, 20 December 2024)
- ML20028D112 + (23:47:50, 20 December 2024)
- 05000395/LER-1982-053, Forwards LER 82-053/03L-0.Detailed Event Analysis Encl + (23:47:52, 20 December 2024)
- PNO-III-83-003, on 830111,cargo Plane Carrying 0.015 Ci Am-241 in Form of 10,000 Sealed Sources of 1.5 Mci Each Crashed Upon Takeoff at Detroit Metro Airport.Three Crew Members Killed.All Sources Maintained Integrity + (23:47:54, 20 December 2024)
- 05000327/LER-1982-140-03, /03L-0:on 821207,combined Leakage Rate & Combined Bypass Leakage Exceeded Acceptable Limits.Caused by Faulty Upper & Lower Personnel Airlocks & Leakage Paths X-62 & X-111.Items Repaired + (23:47:55, 20 December 2024)
- 05000416/LER-1982-160, Forwards LER 82-160/03L-0 + (23:47:57, 20 December 2024)
- 05000254/LER-1982-037-03, /03L-0:on 821213,during Automatic Blowdown Test, Automatic Blowdown Timer 287-105B Tripped at 131 in Excess of Tech Specs.Caused by Instrument Setpoint Drift. Timer Readjusted to Trip at 102 + (23:47:59, 20 December 2024)
- ML20028D104 + (23:48:00, 20 December 2024)
- 05000327/LER-1982-140, Forwards LER 82-140/03L-0 + (23:48:01, 20 December 2024)