Text
,
.
Nov 241982
Docket:
50-446/82-11
Texas Utilities Generating Company
ATTN:
R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Mr. L. D. Gilbert of our staff
during the period November 1 and 3-5, 1982, of activities authorized by NRC
Construction Permit CPPR-127 for the Comanche Peak facility, Unit 2, and to
the discussion of our findings with Mr. R. G. Tolson of your staff at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
'
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter and submit written
application to withhold information contained therein within 30 days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980,96-511.
O
ESf);[bert:gb
N
ES Q
RPB2 46
RPB1
DRRP&EP
p RA- IV
LDGil
DMHonnicutt
WCSeidle
GLMadsen JEGagliardo
J % lins
11/16/82
11/([/82
11/p/82
11/11/82 11/p/82
11/
82
d
)
D/IESQf
8301170228 821124
EJohnson
'
gDRADOCK 05000446
11/ty/82
>=
p >4t M
'
s
,
6
Texas Utilities Generating
2
Company
4 ".
Should you have any questions concerning this inspectiqn, we will be pleased
to discuss them with you.
.
,
Sincerely,
G.
L. Madsen, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report 50-446/82-11
bcc to DMB:
(IE01)
bcc to RIV:
Resident Inspector
Section Chief
Infor Systems
RPB1
RPB2
RIV File
State
J. Collins
L. Gilbert
E. Johnson
G. Vissing, NRR
C. Trammell, NRR
t
I
l
!
t
I