ML20028D203

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-446/82-11 on 821101 & 03-05 & Notice of Violation
ML20028D203
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 11/24/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20028D204 List:
References
82-11, NUDOCS 8301170228
Download: ML20028D203 (2)


See also: IR 05000446/1982011

Text

,

.

Nov 241982

Docket:

50-446/82-11

Texas Utilities Generating Company

ATTN:

R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. L. D. Gilbert of our staff

during the period November 1 and 3-5, 1982, of activities authorized by NRC

Construction Permit CPPR-127 for the Comanche Peak facility, Unit 2, and to

the discussion of our findings with Mr. R. G. Tolson of your staff at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

'

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The response directed by this letter and the accompanying Notice is not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980,96-511.

O

ESf);[bert:gb

N

ES Q

RPB2 46

RPB1

DRRP&EP

p RA- IV

LDGil

DMHonnicutt

WCSeidle

GLMadsen JEGagliardo

J % lins

11/16/82

11/([/82

11/p/82

11/11/82 11/p/82

11/

82

d

)

D/IESQf

8301170228 821124

EJohnson

'

gDRADOCK 05000446

11/ty/82

PDR

>=

p >4t M

'

s

,

6

Texas Utilities Generating

2

Company

4 ".

Should you have any questions concerning this inspectiqn, we will be pleased

to discuss them with you.

.

,

Sincerely,

G.

L. Madsen, Chief

Reactor Project Branch 1

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report 50-446/82-11

bcc to DMB:

(IE01)

bcc to RIV:

Resident Inspector

Section Chief

Infor Systems

RPB1

RPB2

RIV File

State

J. Collins

L. Gilbert

E. Johnson

G. Vissing, NRR

C. Trammell, NRR

t

I

l

!

t

I