Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035G365 + (09:12:46, 20 December 2024)
- NG-93-1551, Monthly Operating Rept for Mar 1993 for Duane Arnold Energy Ctr + (09:12:52, 20 December 2024)
- ML20035G361 + (09:12:59, 20 December 2024)
- ML20035G359 + (09:13:05, 20 December 2024)
- ML20035G358 + (09:13:11, 20 December 2024)
- ML20035G356 + (09:13:17, 20 December 2024)
- ML20035G353 + (09:13:23, 20 December 2024)
- PNO-I-93-021, on 930419,contamination Identified in Several Areas on Floor of Radioactive Matl Lab on Second Floor of Bldg.Caused by Spill of Approx .57 Mci.Areas on First Floor Have Been Decontaminated.Commonwealth of Ma Notified + (09:13:33, 20 December 2024)
- 05000321/LER-1993-002-03, :on 930401,experienced Setpoint Drift in Excess of Tolerance Specified by Ist.Caused by Corrosion Induced Bonding of Pilot Valve Disc & Seat.Sys Installed to Provide Redundant Electrical Actuation Signals + (09:13:40, 20 December 2024)
- ML20035G349 + (09:13:47, 20 December 2024)
- ML20035G346 + (09:13:53, 20 December 2024)
- ML20035G340 + (09:14:00, 20 December 2024)
- ML20035G332 + (09:14:06, 20 December 2024)
- ML20035G331 + (09:14:12, 20 December 2024)
- ML20035G330 + (09:14:18, 20 December 2024)
- HL-3255, 1992 Annual Radiological Environ Surveillance Rept. W/ + (09:14:24, 20 December 2024)
- ML20035G328 + (09:14:39, 20 December 2024)
- ML20035G325 + (09:14:40, 20 December 2024)
- ML20035G323 + (09:14:41, 20 December 2024)
- 05000328/LER-1993-004-01, :on 930323,discovered That Surveillance Interval Specified in TS 4.6.5.1 Exceeded.Caused by Ineffective Communication Between Chemistry Personnel. Procedure Revised + (09:14:45, 20 December 2024)
- ML20035G305 + (09:14:49, 20 December 2024)
- ML20035G304 + (09:14:50, 20 December 2024)
- ML20035G300 + (09:14:52, 20 December 2024)
- IR 05000213/1993002 + (09:14:53, 20 December 2024)
- 05000327/LER-1993-007, :on 930324,inadvertent Actuation of Containment Isolation Valve Occurred.Caused by Personnel Error. Individuals Involved Counseled & Operators Restored Affected Equipment to Svc + (09:14:56, 20 December 2024)
- ML20035G293 + (09:14:58, 20 December 2024)
- ML20035G291 + (09:14:59, 20 December 2024)
- ML20035G290 + (09:15:02, 20 December 2024)
- ML20035G289 + (09:15:04, 20 December 2024)
- ML20035G286 + (09:15:05, 20 December 2024)
- RC-93-0097, Forwards 1992 Santee Cooper Annual Rept + (09:15:06, 20 December 2024)
- ML20035G280 + (09:15:08, 20 December 2024)
- ML20035G277 + (09:15:09, 20 December 2024)
- ML20035G273 + (09:15:14, 20 December 2024)
- ML20035G272 + (09:15:15, 20 December 2024)
- ML20035G271 + (09:15:20, 20 December 2024)
- ML20035G269 + (09:15:21, 20 December 2024)
- ML20035G265 + (09:15:22, 20 December 2024)
- ML20035G264 + (09:15:24, 20 December 2024)
- ML20035G262 + (09:15:25, 20 December 2024)
- IR 05000346/1993007 + (09:15:27, 20 December 2024)
- ML20035G258 + (09:15:29, 20 December 2024)
- ML20035G257 + (09:15:30, 20 December 2024)
- ML20035G255 + (09:15:31, 20 December 2024)
- ML20035G253 + (09:15:33, 20 December 2024)
- ML20035G252 + (09:15:34, 20 December 2024)
- ML20035G248 + (09:15:36, 20 December 2024)
- ML20035G243 + (09:15:37, 20 December 2024)
- ML20035G241 + (09:15:39, 20 December 2024)
- PY-CEI-NRR-1628, Forwards 1992 Annual Financial Repts for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,Unit 1, Respectively + (09:15:40, 20 December 2024)
- 05000333/LER-1993-007-01, :on 930322,determined That Thermal Power Trip Function of APRM Not Tested to Completion When RPS Bypassed Resulting in Blocked Initiation of Scram Signal.Caused by Procedural Deficiency.Procedures Revised + (09:15:43, 20 December 2024)