ML20035G273
| ML20035G273 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/21/1993 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Broughton T GENERAL PUBLIC UTILITIES CORP. |
| References | |
| NUDOCS 9304270068 | |
| Download: ML20035G273 (3) | |
Text
_ _
l f
APR 2 y Docket No. 50-289 Mr. T. Gary Broughton Vice President and Director, TMI-1 GPU Nuclear Corporation Three Mile Island Nuclear Station P. O. Box 480 Middletown, Pennsylvania 17057-0191
Dear Mr. Broughton:
SUBJECT:
SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation on April 20,1993, between Mr. J. Prell and Mr. M. Trump, arrangements were made for the administration oflicensing examinations at the Three Mile Island, Unit I facility.
The written examinations and operating tests are scheduled for the week of August 30,1993.
Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in NUREG-1021, " Operator Licensing Examiner Standards," (ES-201, ) during the week of August 16,1993.
I a
To prepare the examinations and meet the above schedule, it will be necessary for your staff 1
to fumish the reference materials identified in Attachment 2 of ES-201 by May 29,1993.
Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled.
The NRC will prepare and administer the written examinations in accordance with ES-401 I
and ES-402 of NUREG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
OFFICIAL RECORD COPY G:TM183093 9304270068 930421 I
PDR ADOCK 05000289 V
PDR h,9 G
n\\n I
I f
i APR 211993 l
Mr. T. Gary Broughton 2
', and ES-302, Attachment 1, contain a number of NRC policies and guidelines i
that will be in effect while the written examination and operating tests are being I
administered.
l Your staff should submit preliminary senior reactor operator license applications and waiver
(
requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If -
j l
the applications are not received at least 30 days before the examination date, a postponement j
may be necessary. Final, signed applications certifying that all training has been completed
(
should be submitted at least 14 days before the first examination date.
l This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101 which expires October 31,1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including l
suggestions for reducing this burden, to the Information and Records Management Branch, i
i j
MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101) ifice ofInformation and Regulatory Affairs, l
l NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
1 4
Thank you for your consideration in this matter. Mr. Trump has been advised of the NRC j
guidelines and policies addressed in this letter. If you have any questions on the evaluation 1
process, please contact me at (215) 337-5211.
j i
Sincerely,
)
0:;ginal Signed :17:
(~nn W. Mnv" Glenn W. Meyer, Chief PWR Section Operations Branch I
Division of Reactor Safety 4
1 i
1 OFFICIAL RECORD COPY G:TM183093 1
1 i
i
i i
Mr. T. Gary Broughton 3
APR 2 j yggy cc:
R. E. Rogan, TMl Licensing Director M. J. Ross, Operations and Maintenance Director, TMI-1 J. Fornicola, Licensing and Regulatory Affairs Director TMI-1 Licensing Department Mark Trump, Operations Training Manager E. L. Blake, Jr., Esquire TMI-Alert (TMIA) l Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania s
l bec:
Region I Docket Room (with concurrences) l R. Blough, DRP
[
J. Joyner, DRSS J. Rogge, DRP N. Dudley, SRI, Seabrook D. Vito, SRI, Oyster Creek V. McCree, OEDO R. Hernan, PD I-4, NRR j
t i
RI:DRS RI:DRS Prell me Meye D,
s 04/2 3
04M/93 OFFICIAL RECORD COPY G:TM183093 1
i
-