Forwards Insp Rept 50-346/93-07 on 930322-26.No Violations Noted
ML20035G255
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/20/1993
From: Schumacher M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
CENTERIOR ENERGY, TOLEDO EDISON CO.
Shared Package
ML20035G256 List:
References
NUDOCS 9304270050
Download: ML20035G255 (2)


See also: IR 05000346/1993007

Text

,

.. .

-

..

_ __

DO D

.

.

APR 2 01993

i

l

Docket No. 50-346

l'

i

Centerior Service Company

l

ATTN: Mr. Donald Shelton

!

Vice President

!

Nuclear - Davis-Besse

c/o Toledo Edison Company

300 Madison Avenue

Toledo, OH 43652

Dear Mr. Shelton:

SUBJECT:

INStECTION OF DAVIS BESSE-RADIATION PROTECTION PROGRAM UNDER THE

i

REVISED 10 CFR PART 20 REQUIREMENTS (REPORT NO. 50-346/93007(DRSS))

1

This refers to the routine safety inspection conducted by Mr. R. A. Paul of

l

this office on March 22 - 26, 1993, and a discussion with members of your

i

staff on March 31, 1993, of activities for your Davis-Besse Nuclear Power

Station.

At the conclusion of the inspection, the findings were discussed

l

with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

!

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations of

,

activities in progress.

During this inspection, certain of your activities, as described above, appear

l

to be in violation of-NRC requirements. However, the li:ensee identified this

violation and it is not being cited because the criteria specified in Section

l

VII.B.2 of the " General Statement of Policy and Procedures for NRC Enforcement

Actions," (Enforcement Policy, 10 CFR Part 2, Appendix C).

i

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

l

Public Document Room.

.!

We will gladly discuss any questions you have concerning this inspection.

Jgncerely,

Oal Signed b/ k'.C. Schucacher"

M. C. Schumacher, Chief

!.

Radiological Controls Section 1

Enclosure:

Inspection Report

No. 50-346/93007(DRSS)

See Attached Distribution

RL

RIII

RIMw

/ {Al,

f

q4

Sch{umacher

'P

1

Jack'ik

04/ /93

4 h/

eg

9304270050 930420

I

PDR

ADOCK 05000346

g ,-O h

G

PDR

(

'

-

_

_

_

_

_

.

~

--

c

.

.

APR 2 01993

Centerior Service Company

2

Distribution

cc w/ enclosure:

L. Storz, Plant Manager

OC/LFDCB

Resident Inspector, RIII

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

Department of Health

A. Grandjean, State of Ohio,

Public Utilities Commission

bec: PUBLIC