Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000251/LER-1982-001, Forwards LER 82-001/01T-0 + (02:59:51, 20 December 2024)
- ML20040C844 + (02:59:52, 20 December 2024)
- ML20040C843 + (02:59:53, 20 December 2024)
- ML20040C842 + (02:59:53, 20 December 2024)
- ML20040C841 + (02:59:54, 20 December 2024)
- 05000366/LER-1981-132-03, /03L-0:on 811225,HPCI Turbine Trip & Exhaust Discharge Pressure Alarms Activated.Caused by Interference of Bourdon Tube.Spare Switch Backed Away from Tube.Calibr Procedure Revised + (02:59:55, 20 December 2024)
- 05000366/LER-1981-132, Forwards LER 81-132/03L-0 + (02:59:57, 20 December 2024)
- ML20040C835 + (02:59:59, 20 December 2024)
- ML20040C836 + (02:59:59, 20 December 2024)
- 05000261/LER-1981-034, Forwards LER 81-034/03L-0 + (03:00:00, 20 December 2024)
- ML20040C832 + (03:00:01, 20 December 2024)
- ML20040C831 + (03:00:03, 20 December 2024)
- ML20040C829 + (03:00:04, 20 December 2024)
- ML20040C830 + (03:00:04, 20 December 2024)
- ML20040C827 + (03:00:06, 20 December 2024)
- ML20040C828 + (03:00:06, 20 December 2024)
- ML20040C825 + (03:00:07, 20 December 2024)
- ML20040C826 + (03:00:07, 20 December 2024)
- PNO-I-82-010, on 820125,plant Will Be Shut Down for at Least 2 Days to Repair Leak in 12-inch Diameter Drain Line Between C Moisture Separator & Heater Drain Tank.Leak Is Blowing Steam Into Heater Bay Area + (03:00:09, 20 December 2024)
- ML20040C822 + (03:00:10, 20 December 2024)
- ML20040C821 + (03:00:11, 20 December 2024)
- ML20040C820 + (03:00:11, 20 December 2024)
- PNO-I-82-004A, on 820118,vehicle Owned by Us Priority Transport Co (non-licensee) Carrying Radioactive Matl Was Stolen.Boston Police Dept Recovered Vehicle Same Day.All Radioactive Contents Accounted for + (03:00:13, 20 December 2024)
- ML20040C818 + (03:00:14, 20 December 2024)
- PNO-III-81-121A, Region 2,NRR & Resident Inspector Completed Review of 811228 Plant Scram.Licensee Plans to Take Reactor Critical 820122.Special Testing & Monitoring of Main & Reserve Transformer Breakers Will Be Performed + (03:00:16, 20 December 2024)
- ML20040C816 + (03:00:17, 20 December 2024)
- IR 05000322/1981023 + (03:00:18, 20 December 2024)
- ML20040C813 + (03:00:21, 20 December 2024)
- PNO-I-82-009, on 820125,primary to Secondary Leakage Indicated in Steam Generator B & Reactor Trip Initiated. Site Alert Declared & Upgraded to Site Emergency.Reactor Containment Isolated.All Levels Returned to Background + (03:00:21, 20 December 2024)
- ML20040C811 + (03:00:23, 20 December 2024)
- ML20040C810 + (03:00:24, 20 December 2024)
- 05000324/LER-1981-130-03, /03L-0:on 811210,variable Sensing Log Isolation Root Valve of Reactor Level Instrument Found Not to Hold Pressure & Automatic Depressurization Sys Declared Inoperable.Cause Not Determined.Penetration Test Completed + (03:00:25, 20 December 2024)
- PNO-I-82-009A, on 820125,RCS at 822 psig,370 F.Bubble Drawn in Pressurizer & Pressurizer Leveled Out Near 50%.Cooldown Reduced to 5 F/H + (03:00:27, 20 December 2024)
- 05000324/LER-1981-130, Forwards LER 81-130/03L-0 + (03:00:29, 20 December 2024)
- ML20040C805 + (03:00:30, 20 December 2024)
- IR 05000278/1981032 + (03:00:35, 20 December 2024)
- ML20040C803 + (03:00:37, 20 December 2024)
- ML20040C802 + (03:00:39, 20 December 2024)
- ML20040C801 + (03:00:41, 20 December 2024)
- ML20040C799 + (03:00:42, 20 December 2024)
- ML20040C798 + (03:00:43, 20 December 2024)
- ML20040C796 + (03:00:43, 20 December 2024)
- 05000321/LER-1981-133-03, /03L-0:on 811204,recombiner Bldg Vent Monitor P003A Was Found Inoperable.Sample Pump a Was Inoperable But Redundant Pump B Was Put in Svc & Sys Resumed Normal Operation.Caused by Pump Being Wired W/Improper Voltage + (03:00:45, 20 December 2024)
- ML20040C794 + (03:00:46, 20 December 2024)
- ML20040C793 + (03:00:47, 20 December 2024)
- 05000321/LER-1981-133, Forwards LER 81-133/03L-0 + (03:00:48, 20 December 2024)
- ML20040C790 + (03:00:49, 20 December 2024)
- 05000339/LER-1981-089, Forwards LER 81-089/03L-0 + (03:00:51, 20 December 2024)
- 05000321/LER-1981-140-03, /03L-0:on 811218,overheating Electrical Insulation Was Observed in Main Control Room.Caused by Loose Connection on Line Side of Fuse Block Resulting in Overheating.Jumper & Fuse Block Replaced + (03:00:52, 20 December 2024)
- ML20040C786 + (03:00:54, 20 December 2024)
- ML20040C784 + (03:00:57, 20 December 2024)