Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20041E414 + (00:30:57, 20 December 2024)
- 05000346/LER-1982-001, Forwards LER 82-001/01X-1 + (00:30:59, 20 December 2024)
- ML20041E410 + (00:31:00, 20 December 2024)
- ML20041E409 + (00:31:01, 20 December 2024)
- ML20041E408 + (00:31:02, 20 December 2024)
- ML20041E407 + (00:31:03, 20 December 2024)
- ML20041E406 + (00:31:04, 20 December 2024)
- ML20041E405 + (00:31:05, 20 December 2024)
- ML20041E404 + (00:31:08, 20 December 2024)
- ML20041E403 + (00:31:09, 20 December 2024)
- ML20041E402 + (00:31:10, 20 December 2024)
- ML20041E399 + (00:31:14, 20 December 2024)
- ML20041E398 + (00:31:15, 20 December 2024)
- ML20041E397 + (00:31:16, 20 December 2024)
- 05000247/LER-1982-004-03, /03L-0:on 820125,charging Pump 22 Declared Inoperable Due to Excessive Plunger Seal Leakage.Caused by Normal Wear.Seal Packing Replaced + (00:31:17, 20 December 2024)
- ML20041E394 + (00:31:18, 20 December 2024)
- ML20041E393 + (00:31:19, 20 December 2024)
- ML20041E392 + (00:31:20, 20 December 2024)
- 05000275/LER-1982-001-03, /03L-0:on 820129,during Audit Prior to Fuel Load, Communication Phone Mounted on Front Section of Hot Shutdown Panel Was Discovered Excluded from Seismic Analysis.Caused by Coordination Failure.Panel Will Be Reanalyzed + (00:31:21, 20 December 2024)
- ML20041E390 + (00:31:22, 20 December 2024)
- ML20041E387 + (00:31:24, 20 December 2024)
- ML20041E389 + (00:31:24, 20 December 2024)
- ML20041E386 + (00:31:25, 20 December 2024)
- ML20041E385 + (00:31:26, 20 December 2024)
- ML20041E384 + (00:31:28, 20 December 2024)
- 05000133/LER-1982-001, Forwards LER 82-001/03L-0.Detailed Event Analysis Submitted + (00:31:29, 20 December 2024)
- ML20041E380 + (00:31:31, 20 December 2024)
- 05000275/LER-1982-001, Forwards LER 82-001/03L-0 + (00:31:33, 20 December 2024)
- ML20041E377 + (00:31:33, 20 December 2024)
- ML20041E376 + (00:31:35, 20 December 2024)
- ML20041E375 + (00:31:36, 20 December 2024)
- ML20041E374 + (00:31:37, 20 December 2024)
- ML20041E373 + (00:31:38, 20 December 2024)
- NUREG-0877, Forwards Incomplete Draft SER,NUREG-0877.Responses to Open Areas Should Be Reviewed & Responses Provided + (00:31:41, 20 December 2024)
- 05000312/LER-1982-002-03, /03L-0:on 820130,snubbers 1SW-21007-7 & 1SW-23823-13A Failed Visual Insps.Caused by Low Fuel Level. Snubber 1SW-21007-7 Rebuilt & Passed.Snubber 1SW-23823-13A Failed Until Bechtel Developed New Criteria + (00:31:44, 20 December 2024)
- 05000255/LER-1982-010-03, /03L-0:on 820202,during Surveillance of Hydraulic Snubbers,Snubber 37 (LPSI Pump Discharge Piping) Contained Insufficient Oil & Declared Inoperable.Caused by Deteriorated O-rings.New O-rings Installed + (00:31:45, 20 December 2024)
- ML20041E367 + (00:31:47, 20 December 2024)
- IR 05000324/1982004 + (00:31:48, 20 December 2024)
- 05000255/LER-1982-010, Forwards LER 82-010/03L-0 + (00:31:50, 20 December 2024)
- ML20041E362 + (00:31:51, 20 December 2024)
- ML20041E359 + (00:31:52, 20 December 2024)
- 05000312/LER-1982-002, Forwards LER 82-002/03L-0.Detailed Event Analysis Submitted + (00:31:54, 20 December 2024)
- ML20041E356 + (00:31:55, 20 December 2024)
- TXX-3488, Forwards Model Testing of Recirculation Containment Sump, Per Reg Guide 1.79 Requirements + (00:31:56, 20 December 2024)
- ML20041E352 + (00:31:58, 20 December 2024)
- ML20041E353 + (00:31:58, 20 December 2024)
- ML20041E351 + (00:31:59, 20 December 2024)
- ML20041E349 + (00:32:00, 20 December 2024)
- ML20041E348 + (00:32:01, 20 December 2024)
- ML20041E347 + (00:32:02, 20 December 2024)
- ML20041E345 + (00:32:02, 20 December 2024)