Forwards List of Submittals to Be Included in Inservice Insp Relief Request Review.Extension of Testing Interval to 840701 Granted.Other Requests for Relief Re Insp of pressure-bearing Components Due in 30 Days
ML20041E384
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/23/1982
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
References
TAC-08295, TAC-8295, NUDOCS 8203100451
Download: ML20041E384 (6)


Text

_ _

FEBRUARY 2 3 812 4

_y g

,, Dy~

l Docket No. 50-298

\\

s Mr. J. M. Pilant, Director MiO.Er/2D

\\

Licensing & Quality Assurance

(

Nebraska Public Power District pIIR I 1982x '-9 P. O. Box 499

' ""$."f7g'we Columbus, Nebraska 68601

'2, na.M~ d o

Dear Mr. P11 ant:

N g

Re: Cooper Nuclear Power Station We have initiated a substantial effort to bring current our approvals of inservice inspection relief requests. The purpose of this letter is to ensure that the infomation we are supplying to our contractors for review v is current and reflects the latest requirements for your facility.

For the Cooper Nuclear Power Station our review will include your previous submittals identified in the enclosure.

Any earlier submittals on the subject of the ISI Program will be considered obsolete.

Based on your submittals, the inspection interval for this facility is Novenber 1,1977 to March 1,1981. We will be conducting the review against the requirenents of the 1974 edition of Section XI of the ASME Code up to and including the S-75 Addenda.

You requested extending the inspection interval from November 1,1977 to l

March 1,1981. The November 1,1979 regulation pemits extension of the l

testing interval from November 1,1977 to July 1,1984. We are granting you the extension permitted by the regulation and will assume this is acceptable unless we hear otherwise.

1 Please determine if there are any additional previous submittals that we should be reviewing. Also, if there are any additional requests for relief that should be considered for the inspection interval, please submit these requests within thirty days.

. Note that such requests should deal with only the inservice inspection J of pressure-bearing components including supports and with system pressure tests. The inservice testing of pumps and valves is being treated separately and you will receive information regarding it by separate correspondence.

'"c'>

8203100451 020223 PDR ADOCK 05000298 om) 0

PDR,
NRC FORM 3tB OO 80l NRCM O240 OFFICIAL RECORD COPY
  • "o was329 824

~

v 7

g~

4 g}

-u-Your requests should include both exempted components under the terms of the Code as well as relief from the requirements of the Code in accordance with paragraph g of 10 CFR 50.55a. Also, please advise when you are using later Code versions that the S-75 Addenda (per Item (g)(4)(iv) of 10 CFR 50.55a) for certain examir.ations, particularly how you are meeting "all related requirements" from the same version.

Because your previous submittals generally seem to follow the appropriate guidelines, we are proceeding with the review. Early in that review, we may be contacting you for additional information. To expedite the review, please advise ycur assigned project manager orally as soon as possible (within 10 days) as to previous submittals we should be reviewing or other requests for relief that are forthcoming.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely.

Orig 1nst signed by Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Enclosure:

Review Document Record c: See next page DISTRIBUTION:

Docket File J. Hel temes I&E-1 NRC PDR NSIC D. Eisenhut Local PDR S. Norris ORB #2 Rdg 0 ELD ACRS-10 Gray B. Siegel D. Chaney d

DLj0RBQ DL:0RBf2 DL:0RB#2

..StToWii.

BSiegelfp; b.

DBVassal l o..

sua-+

zg7/82 2/4 /,tg 2/.g.3/.82

[NRC FORM 3I8110 801 NRCM O240 OFFICIAL RECORD COPY

  • = ' + = "

>S CIC

[*'

UNITED STATES NUCLEAR REGULATORY COMMISSION 3

n

{.g E

3 WASHINGTON, D. C. 20555 4

o#

'%...+S February 23,1982

+

Docket No. 50-298 Mr.,J. M. Pilant, Director Licensing & Quality Assurance Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601

Dear Mr. Pilant:

Re:

Cooper Nuclear Power Station We have initiated a substantial effort to bring current our approvals of inservice inspection relief requests. The purpose of this letter is to ensure that the information we are supplying to our contractors for review is current and reflects the latest requirements for your facility.

For the Cooper Nuclear Power Station our review will include your previous submittals identified in the enclosure.

Any earlier submittals on the subject of the ISI Program will be considered obsolete.

Based on your submittals, the inspection interval for this facility is November 1,1977 to March 1,1981. We will be conducting the review against the requirements of the 1974 edition of Section XI of the ASME' Code up to and including the S-75 Addenda.

You requested extending the inspection interval from November 1,1977 td March 1,1981. The November 1,1979 regulation permits extension of the testing interval from November 1,1977 to July 1,1984. We are granting you the extension permitted by the regulation and will assume this is acceptable unless we hear otherwise.

Please determine if there are any additional previous subrpittals that we should be reviewing.

Also, if there are any additional requests for relief that should be considered for the inspection interval, please submit these requests within thirty days.

' Note that such requests should deal with only the inservice inspection of pressure-bearing components including supports and with system pressure tests. The inservice testing of pumps and valves is being treated separately and you will receive information regarding it by separate correspondence.

i l

G' -

-2 Your requests should include both exempted components under the terms of the Code as well as relief from the requirements of the Code in accordance with paragraph g of 10 CFR 50.55a. Also, please advise when you are using later Code versions that the S-75 Addenda (per Item (g)(4)(iv) of 10 CFR 50.55a) for certain examinations, particularly how you are meeting "all related requirements" from the same version.

Beca'use your previous submittals generally seem to follow the appropriate gu'idelines, we are proceeding with the review.

Early in that revi2w, we may be contacting you for additional information. To expedite the review, please advise your assigned project manager orally as soon as possible (within 10 days) as to previous submittals we should be reviewing or other requests for relief that are forthcoming.

The reporting and/or reco.rdkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is nct required under P.L.96-511.

Sincerely, Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Enclosure:

Review Document Record c:

See next page i

Mr. J..M. Pflant Nebraska Public P.ower pistrict cc:

Mr. G. D. Watson, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, Nebraska. 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer 3100 Val. ley Center Phoenix, Arizona 85073

. Cooper Nuclear Station ATTN: Mr. L. Lessor Station Superintendent P.. O. Box 98 Brownville, Nebraska 68321 Auburn Public Library 118 - 15th Street Auburn, Nebraska 68305 Mr..D'ennis Dubois USNRC Resident Inspector P.O. Box 218 Brownvill e, NE 68321 John T. Collins Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 l

1 a

~

b P

Enclosure Task A REVIEW DOCUMENT RECORD Unit (s)

Cooper Date Type Subject Matter 4/28/76 (NRC)/(NPPD)

L Initial Guidance ISI 6/02/76 Pilant(NPPD)/Ziemann(NRC)

L Response to above 11/24/76 Ziemann(NRC)/Pilant(NPPD)

L Further Guidance 5/16/77 Pilant(NPPD)/Ziemann(NRC)

Subm Tech. Spec. Channes 7/29/77 Pilant(NPPD)/ Davis (NRC)

Subm ISI AT Pronram/R.R.

8/12/77 KRG Memo on ISI Resolution?

12/29/77 Davis (NRC)/Pilant(NPPD)

L Interim relief oranted 1/26/78 Pilant(NPPD)/ Davis (NRC)

Subm Description of Chanaes to 7/29/77 Submittal 2/24/78 Lear (NRC)/Pilant(NPPD)

RAI Initial Questions 3/23/78 Pflant(NPPD)/ Lear (NRC)

L Response to RAI 7/18/78 Pilant(NPPD)/lopolito(NRC)

L hesnonse to RAI of 6/7/78 Meetino

~

r 7/79 Hall & Osborne(BNL)

R

" Recommendations to NRC for the SER of Copies ISI & T Progran Summary of Procedures for Glad Removal & Inspection of 8/79 Pilant(NPPD)/Ippolito(NRC)

L Feedwater Nozzles (NRC')

3/28/80

'Carfanno, (Franklin) to Butcher TER Feedwater Nozzle Cracking: TAC No.10423 12/29/80 hosnak(NRC)/Ippolito(NRC)

SER

( Draft' SER

_