Final Part 21 Rept Re Incorrect Welds on safety-related Pullman Const Industries (Pci) HVAC Supports,Initially Reported 820201.PCI Personnel Interpreting Weld Symbols Incorrectly.Welds Reworked & Personnel Retrained
ML20041E377
Person / Time
Site: Marble Hill
Issue date: 03/02/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-82-570-000 PT21-82-570, PT21-82-570-000, S82-02, NUDOCS 8203100446
Download: ML20041E377 (1)


Text

&

edd! ,e PUBLIC W v

c SERVICE Q g. _

INDIANA March 2, 1982y ,

1 g

S82-02 C 7p%g5.

S. W. Shields b T ' ' /p /

Senior Vice President .

Nuclear Division I}/

j' Mr. James G. Keppler Docket Nos.: STN5b'-546 Regional Administrator STN 50-547 U.S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPP. - 171 Glen Ellyn, Illinois 60137 Marble 11111 Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On February 1, 1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as -

required by 10 CFR 50.55(e) . While performing construction surveillance, PSI quality assurance personnel observed incorrect welds on safety related llVAC supports supplied by Pullman Construction Industries, Inc. (PCI). Further investigation determined that PCI personnel were incorrectly interpreting a weld symbol during shop and field fabrication of these supports. Had this situation remained uncorrected these supports may not have been able to withstand their most severe design basis loads.

To prevent reoccurrence of this situation PCI has implemented a training program to educate its personnel on the correct interpretation of weld symbola used in their scope of work. PCI will also perform rework on the affected hangers so they will conform to the design drawings.

This letter is intended to fulfill the requirements of a final report as defined in 10 CFR 50.55(e). If you have any questions on this report, please feel free to contact me.

Si cerely, a

d NVQ S. W. Shields ON 00 SWS/TDC/bak

@@ cc: Director of Inspection and Enforcement O U.S. Nuclear Regulatory Commission b

40 Washington, D.C. 20555 00 J. E. Konklin gk O CC J. J. Harrison [ E/]

$$m P. O. Box 190, New Washington, Indiana 47162 812. 289.1000 MAR 4