Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19289F590 + (15:21:44, 2 January 2025)
- ML19289F589 + (15:21:45, 2 January 2025)
- ML19289F587 + (15:21:46, 2 January 2025)
- ML19289F586 + (15:21:47, 2 January 2025)
- ML19289F584 + (15:21:48, 2 January 2025)
- ML19289F583 + (15:21:49, 2 January 2025)
- ML19289F582 + (15:21:50, 2 January 2025)
- ML19289F581 + (15:21:51, 2 January 2025)
- ML19289F580 + (15:21:52, 2 January 2025)
- ML19289F579 + (15:21:52, 2 January 2025)
- IR 05000313/1979006 + (15:21:56, 2 January 2025)
- IR 05000327/1979018 + (15:21:58, 2 January 2025)
- ML19289F575 + (15:22:00, 2 January 2025)
- ML19289F573 + (15:22:01, 2 January 2025)
- ML19289F570 + (15:22:01, 2 January 2025)
- ML19289F567 + (15:22:02, 2 January 2025)
- ML19289F566 + (15:22:04, 2 January 2025)
- ML19289F565 + (15:22:06, 2 January 2025)
- ML19289F564 + (15:22:07, 2 January 2025)
- ML19289F563 + (15:22:08, 2 January 2025)
- ML19289F562 + (15:22:09, 2 January 2025)
- ML19289F561 + (15:22:10, 2 January 2025)
- ML19289F560 + (15:22:11, 2 January 2025)
- ML19289F559 + (15:22:25, 2 January 2025)
- ML19289F558 + (15:22:25, 2 January 2025)
- ML19289F557 + (15:22:27, 2 January 2025)
- ML19289F556 + (15:22:28, 2 January 2025)
- 05000325/LER-1979-040, Forwards LER 79-040/01T-0 + (15:22:33, 2 January 2025)
- 05000277/LER-1979-025-01, /01T-0 on 790518:E-2 Diesel Tripped Causing half-scram & half-isolation on Unit 3.Caused by Loss of Control Oil from Diesel Governor.Cracked Pipe Fitting Was Replaced + (15:22:35, 2 January 2025)
- ML19289F551 + (15:22:36, 2 January 2025)
- 05000277/LER-1979-025, Forwards LER 79-025/01T-0 + (15:22:38, 2 January 2025)
- ML19289F546 + (15:22:39, 2 January 2025)
- ML19289F547 + (15:22:39, 2 January 2025)
- 05000304/LER-1979-007-01, Has Been Voided + (15:22:41, 2 January 2025)
- 05000338/LER-1979-074-03, /03L-0 on 790516:pressurizer Level Indicator L-1460 Failed During Performance of 1-PT-31.7.2.Cause Unknown.Wires Reconnected & Surveillance Undertaken + (15:22:43, 2 January 2025)
- 05000338/LER-1979-066-03, /03L-0 on 790506:narrow Range Level Transmitter LT-496 in L Steam Generator Read Erratically.Channel Inoperable.Probable Cause Was Drain Lines Off Both High & Low Pressure Sides of Transmitter.Lines Capped + (15:22:44, 2 January 2025)
- ML19289F540 + (15:22:46, 2 January 2025)
- ML19289F542 + (15:22:46, 2 January 2025)
- ML19289F538 + (15:22:47, 2 January 2025)
- ML19289F539 + (15:22:47, 2 January 2025)
- ML19289F537 + (15:22:48, 2 January 2025)
- TAC:11843 + (15:22:49, 2 January 2025)
- ML19289F536 + (15:22:50, 2 January 2025)
- 05000304/LER-1979-006-01, Has Been Voided + (15:22:51, 2 January 2025)
- ML19289F533 + (15:22:53, 2 January 2025)
- 05000295/LER-1979-012-01, Has Been Voided + (15:22:54, 2 January 2025)
- ML19289F531 + (15:22:55, 2 January 2025)
- 05000304/LER-1979-001-01, Has Been Voided + (15:22:57, 2 January 2025)
- ML19289F528 + (15:22:58, 2 January 2025)
- ML19289F527 + (15:22:59, 2 January 2025)
- ML19289F526 + (15:23:00, 2 January 2025)