g g" "' Coq'o
UNITED STATES
'
NUCLE AR REGULATORY COMMISSION
g
3
o
REGION IV
5-
$
611 RYAN PLAZA DRIVE, SUITE 1000
f
o
ARLINGTON, TEXAS 76011
%v ,/
- .. *
April 4, 1979
In Reply Refer To:
Docket Nos. 50-313/79-06
50-368/79-06
Arkansas Power and Light Company
ATTH: Mr. William Cavanaugh III
Vice President of Generation
and Construction
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen :
This refers to the ine' ection conducted under the Resident Inspection Pro-
gram by Messrs. T. F. ,lesterman, R. G. Span:'N and W. D. Johnson of this
office covering the period of February 12, i
i to March 18, 1979, of
activities authorized by NRC Facility Operat: 19 License Nos. DPR-51 and
NPF-6 for the Arkansas Nuclear One, Units 1 and 2, and to the discussion
of the findings by the inspectors with members of your staff at the con-
clusion of each segment of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
During this inspection it was found that one of your activities was
not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Enclosure (1).
This notice
is sent to you pursuant to the provisions of Section 2.201 of tM NRC's
" Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this offi. , within 20 days of
your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps wSich will be taken by you, and the
results achieved; (2) corrective steps which will be taken to avoid further
noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Docunent
Room.
If the report contains any information that you believe to be
2228 330
7906150623.g
.
.
.
.
Arkansas Power and Light Company
-2-
April 4, 1979
proprietary, it is necessaiy that you submit a written application to this
office within 20 days of the date of this lettar, requesting that such
information be withheld from public disclosure. The application must
include a full statement of the reasons why it is claimed that the infor-
mation is proprietary. The application should be prepared so that any
proprietary information identified is contained in an enclosure to the
application, since the application without the enclosure will also be
placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
f V)f0W
G. L. Madsen, Chief,
Reactor Operations and
Nuclear Support Branch
Enclosuras:
1.
Notice of Violation - Unit 2
2.
IE Inspection Report Nos'. 50-313/79-06
50-368/79-06
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
J. P. O'Hanlon, Manager
P. O. Box 608
Russellville, Arkansas 72801
b 33!
L. Alexander, QC Supervisor
(Same Address)