Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19296A788 + (12:50:42, 2 January 2025)
- ML19296A787 + (12:50:43, 2 January 2025)
- ML19296A786 + (12:50:44, 2 January 2025)
- ML19296A785 + (12:50:44, 2 January 2025)
- ML19296A782 + (12:50:45, 2 January 2025)
- ML19296A780 + (12:50:47, 2 January 2025)
- ML19296A781 + (12:50:47, 2 January 2025)
- ML19296A778 + (12:50:49, 2 January 2025)
- ML19296A777 + (12:50:50, 2 January 2025)
- ML19296A775 + (12:50:51, 2 January 2025)
- ML19296A774 + (12:50:52, 2 January 2025)
- ML19296A772 + (12:50:53, 2 January 2025)
- ML19296A771 + (12:50:54, 2 January 2025)
- ML19296A769 + (12:50:56, 2 January 2025)
- ML19296A768 + (12:50:57, 2 January 2025)
- ML19296A767 + (12:50:58, 2 January 2025)
- ML19296A765 + (12:50:59, 2 January 2025)
- ML19296A764 + (12:51:00, 2 January 2025)
- ML19296A763 + (12:51:01, 2 January 2025)
- ML19296A762 + (12:51:02, 2 January 2025)
- ML19296A761 + (12:51:03, 2 January 2025)
- ML19296A758 + (12:51:04, 2 January 2025)
- ML19296A756 + (12:51:05, 2 January 2025)
- ML19296A755 + (12:51:06, 2 January 2025)
- ML19296A754 + (12:51:07, 2 January 2025)
- ML19296A752 + (12:51:08, 2 January 2025)
- ML19296A749 + (12:51:09, 2 January 2025)
- ML19296A750 + (12:51:09, 2 January 2025)
- 05000366/LER-1980-004-03, /03L-0:on 800118,during Steady State Power Operation Hydrogen Recombiner Inlet Valve 2T49-F003A Did Not Open.Caused by a Failed Torque Switch.Sys Returned to Operation After Switch Was Replaced + (12:51:11, 2 January 2025)
- 05000366/LER-1980-004, Forwards LER 80-004/03L-0 + (12:51:12, 2 January 2025)
- 05000321/LER-1980-012-03, /03L-0:on 800122,while Reactor Core Isolation Cooling Sys Was Tagged Out for Maint,Hpci Was Found Inoperable,Requiring Orderly Shutdown.Caused by Leak in Line to HPCI Booster Pump Discharged Pressure Gauge + (12:51:14, 2 January 2025)
- 05000321/LER-1980-012, Forwards LER 80-012/03L-0 + (12:51:16, 2 January 2025)
- ML19296A742 + (12:51:17, 2 January 2025)
- ML19296A741 + (12:51:18, 2 January 2025)
- 05000334/LER-1980-006-04, /04T-0:on 800130,tritium Activity in Quarterly Grab Samples Collected in Oh River Near Facility Discharge During Fourth quarter,1979 Exceeded ETS But Below 10CFR20 Limits + (12:51:19, 2 January 2025)
- ML19296A738 + (12:51:22, 2 January 2025)
- 05000334/LER-1980-005-03, /03L-0:on 800112,decontamination Proceedings Were in Progress When Waste Water Tank Filled.Operator Instructed to Do Valving in Area Was Not Familiar W/Tech Specs & Failed to Have Radiation Technician or Ratemeter Available + (12:51:24, 2 January 2025)
- ML19296A732 + (12:51:28, 2 January 2025)
- 05000366/LER-1980-007-01, /01T-0:on 800130,while Performing High Drywell Pressure Instrument (Reactor Protection Sys) Functional Test & Calibr,Instruments 2C71-N002A,B & D Exceeded Tech Specs.Caused by Instrument Drift + (12:51:29, 2 January 2025)
- 05000321/LER-1980-007-03, /03L-0:on 800114,while Testing Standby Svc Water Pump,Pump Would Not Meet Criteria.Caused by Disengagement of Pump First Stage Impeller Lock Collet.Lock Collet Replaced & Pump Reinstalled + (12:51:31, 2 January 2025)
- 05000334/LER-1980-004-03, /03L-0:on 800123,radiation Monitor Setpoints Less Conservative than Those Required in Mode 6 During Refueling Operations.Caused by Personnel Error.Reactor Vessel Head Studs Detensioned + (12:51:33, 2 January 2025)
- ML19296A727 + (12:51:35, 2 January 2025)
- ML19296A726 + (12:51:36, 2 January 2025)
- 05000334/LER-1979-048-03, /03L-0:on 791210,during 24-h Load Test on Emergency Diesel Generator 2, Discharge Pressure Gage of Backup Electric Fuel Oil Pump Indicated Zero.Caused by Significant Breakdown in QA Program During Const + (12:51:37, 2 January 2025)
- 05000321/LER-1980-007, Forwards LER 80-007/03L-0 + (12:51:39, 2 January 2025)
- 05000366/LER-1980-007, Forwards LER 80-007/01T-0 + (12:51:43, 2 January 2025)
- ML19296A717 + (12:51:45, 2 January 2025)
- ML19296A715 + (12:51:46, 2 January 2025)
- ML19296A713 + (12:51:47, 2 January 2025)
- 05000318/LER-1980-003-03, /03L-0:on 800110,repairs to Number 21 Diesel Generator Jacket Coolant Sys Required Diesel Be Out of Svc. Caused by Leaking Gasket on Jacket Cooling Water Discharge Header.Leak Located & Repaired + (12:51:51, 2 January 2025)
- ML19296A702 + (12:51:53, 2 January 2025)
- 05000318/LER-1980-003, Forwards LER 80-003/03L-0 + (12:51:56, 2 January 2025)