Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19301C908 + (11:42:38, 2 January 2025)
- ML19301C889 + (11:42:39, 2 January 2025)
- ND-19-1316, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item C.3.8.02.01 (Index Number 843) + (11:42:39, 2 January 2025)
- PMNS20191182, Pre-Submittal Meeting for Forthcoming Framatome Topical Report on Fluence Methodologies for Subsequent License Renewal + (11:42:40, 2 January 2025)
- OI 2-2017-004, Closeout Letter Investigation Report to Westinghouse Plant Solution (OI 2-2017-004); (EA-18-149) + (11:42:42, 2 January 2025)
- ML19301C692 + (11:42:48, 2 January 2025)
- ML19301C683 + (11:42:49, 2 January 2025)
- ML19301C562 + (11:42:50, 2 January 2025)
- ML19301C499 + (11:42:51, 2 January 2025)
- ML19301C498 + (11:42:53, 2 January 2025)
- ML19301C497 + (11:42:54, 2 January 2025)
- ML19301C496 + (11:42:55, 2 January 2025)
- ML19301C495 + (11:42:56, 2 January 2025)
- ML19301C494 + (11:42:57, 2 January 2025)
- ML19301C493 + (11:42:58, 2 January 2025)
- ML19301C492 + (11:42:59, 2 January 2025)
- ML19301C491 + (11:43:00, 2 January 2025)
- ML19301C490 + (11:43:01, 2 January 2025)
- ML19301C489 + (11:43:02, 2 January 2025)
- ML19301C488 + (11:43:03, 2 January 2025)
- ML19301C487 + (11:43:05, 2 January 2025)
- IR 05000261/1983009 + (11:43:06, 2 January 2025)
- ML19301C425 + (11:43:07, 2 January 2025)
- IR 05000315/2019012 + (11:43:08, 2 January 2025)
- AECM-83-0228, Forwards Safety Relief Valve Discharge Test, Final Rept for Kuosheng Nuclear Power Station,Including Apps A-T.Rept Withheld (Ref 10CFR2.790).Info Submitted Per OL Condition 2.C(45) + (11:43:10, 2 January 2025)
- ML19301C316 + (11:43:12, 2 January 2025)
- ML19301C295 + (11:43:14, 2 January 2025)
- ML19301C233 + (11:43:15, 2 January 2025)
- ML19301C243 + (11:43:15, 2 January 2025)
- ML19301C190 + (11:43:16, 2 January 2025)
- ML19301C176 + (11:43:17, 2 January 2025)
- ML19301C175 + (11:43:18, 2 January 2025)
- ML19301C173 + (11:43:20, 2 January 2025)
- ML19301C172 + (11:43:21, 2 January 2025)
- ML19301C171 + (11:43:22, 2 January 2025)
- ML19301C170 + (11:43:23, 2 January 2025)
- ML19301C169 + (11:43:24, 2 January 2025)
- 05000387/LER-2019-002, Inoperability of C Emergency Service Water Pump + (11:43:26, 2 January 2025)
- ML19301B980 + (11:43:28, 2 January 2025)
- ML19301C131 + (11:43:28, 2 January 2025)
- L-77-364, Provide Evaluation Results to Determine Potential for Boron Dilution Occurrences Which Was Associated with Chemical & Volume Control System as Addresses in FSAR + (11:43:30, 2 January 2025)
- L-76-404, Attached Additional Information Re Revised Fq Limit Relating to Reduction of Maximum Allowable Heat Flux Hot Channel Factor (Fq) from 2.32 to 2.00 + (11:43:30, 2 January 2025)
- ML19301B898 + (11:43:31, 2 January 2025)
- ML19301B758 + (11:43:32, 2 January 2025)
- ML19301B814 + (11:43:32, 2 January 2025)
- L-78-234, Response to Request for Additional Information Re Steam Generator & Reactor Coolant Pump Support Materials. Requires Bechtel Corp Service & Will Take 3 to 4 Months to Compete + (11:43:33, 2 January 2025)
- ML19301B650 + (11:43:34, 2 January 2025)
- ML19301B640 + (11:43:35, 2 January 2025)
- ML19301B645 + (11:43:35, 2 January 2025)
- ML19301B618 + (11:43:36, 2 January 2025)
- ML19301B638 + (11:43:36, 2 January 2025)