Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/LER-1980-018-03, /03L-0:on 800217,during Refueling Operations 4 Kv Shutdown Board B Alternate Feeder Failed to Close During Board Transfer Test.Cause Unknown.Failure Appears Random + (11:16:44, 2 January 2025)
- ML19305A890 + (11:16:45, 2 January 2025)
- TMI-19-097, License Amendment Request - License Condition Revision for Removal of Cyber Security Plan Requirements + (11:16:46, 2 January 2025)
- 05000260/LER-1980-009-03, /03L-0:on 800213,during Normal Operation,Steam Line B Radiation Monitor 2-RM-90-138 Failed Downscale Resulting in Half Scram & Half Isolation.Caused by Loss of Power Output from Power Drawer.Power Drawer Replaced + (11:16:47, 2 January 2025)
- 05000260/LER-1980-010-03, /03L-0:on 800216,during Hot Shutdown,Crack Was Found in HPCI Turbine Coupling Bearing Support Pedestal. Probably Caused by Water Hammer While Warming HPCI from out- of-svc Condition.New Pedestal Installed + (11:16:49, 2 January 2025)
- ML19305A886 + (11:16:53, 2 January 2025)
- 05000259/LER-1980-018, Forwards LER 80-018/03L-0 + (11:16:54, 2 January 2025)
- ML19305A882 + (11:16:55, 2 January 2025)
- 05000260/LER-1980-010, Forwards LER 80-010/03L-0 + (11:16:57, 2 January 2025)
- ML19305A878 + (11:17:01, 2 January 2025)
- 05000260/LER-1980-009, Forwards LER 80-009/03L-0 + (11:17:03, 2 January 2025)
- ML19305A875 + (11:17:04, 2 January 2025)
- ML19305A871 + (11:17:04, 2 January 2025)
- ML19305A867 + (11:17:11, 2 January 2025)
- ML19305A866 + (11:17:12, 2 January 2025)
- ML19305A864 + (11:17:12, 2 January 2025)
- ML19305A863 + (11:17:13, 2 January 2025)
- 05000325/LER-1980-014-03, /03L-0:on 800214,while Performing Suppression Pool High Water Channel Functional Test,Manual Isolation Valve on Low Side of 1E41-LSH-N015A Was Found Closed.Cause Not Known.Valve Reopened + (11:17:16, 2 January 2025)
- TXX-3106, Advises That Motorized Svc Water Strainers Have Been Deleted from Facility Design + (11:17:17, 2 January 2025)
- 05000346/LER-1980-016-03, /03L-0:on 800213,while Reviewing Station Log,Shift Foreman Discovered That Containment Airlock Seal Leakage Test Had Not Been Performed After Last Entry Into Containment During Startup.Caused by Procedural Inadequacy + (11:17:23, 2 January 2025)
- 05000325/LER-1980-014, Forwards LER 80-014/03L-0 + (11:17:25, 2 January 2025)
- 05000346/LER-1980-016, Forwards LER 80-016/03L-0 + (11:17:29, 2 January 2025)
- ML19305A852 + (11:17:30, 2 January 2025)
- ML19305A851 + (11:17:31, 2 January 2025)
- ML19305A848 + (11:17:31, 2 January 2025)
- ML19305A847 + (11:17:33, 2 January 2025)
- 05000368/LER-1980-010-03, /03L-0:on 800212,during Mode 5 Operation, Discovered That Tech Spec 24-month Local Leak Rate Surveillance Requirements Had Not Been Performed.Caused by Confusion Over 24-month Surveillance Interval + (11:17:34, 2 January 2025)
- ML19305A845 + (11:17:35, 2 January 2025)
- ML19305A842 + (11:17:36, 2 January 2025)
- ML19305A840 + (11:17:36, 2 January 2025)
- 05000368/LER-1980-011-03, /03L-0:on 800214,during Mode 5 Operation,While Performing Local Leak Rate Test,Five Containment Penetration Leak Rates Exceeded Tech Specs.Caused by Corrosion Buildup on Seating Surface or Valves Needing Adjustment + (11:17:37, 2 January 2025)
- ML19305A837 + (11:17:38, 2 January 2025)
- 05000368/LER-1980-012-03, /03L-0:on 800222,during Mode 5 Operation,While Performing Surveillance Tests on Diesel Generator 1,unit Became Inoperable.Caused by Broken Generator Rotor Shaft in Area of Motor End Bearing Housing.Analyzing Exact Cause + (11:17:40, 2 January 2025)
- ML19305A832 + (11:17:42, 2 January 2025)
- ML19305A833 + (11:17:42, 2 January 2025)
- ML19305A830 + (11:17:43, 2 January 2025)
- ML19305A831 + (11:17:43, 2 January 2025)
- ML19305A829 + (11:17:44, 2 January 2025)
- 05000324/LER-1980-028-03, /03L-0:on 800212,while Performing PT 2.1.8PC, Reactor Core Isolation Cooling Exhaust Diaphragm Calibr & Functional Test,High Pressure Switches E51-PS-NO12A & C Actuated at 11.9 Psig.Caused by Instrument Drift + (11:17:45, 2 January 2025)
- 05000325/LER-1980-018-03, /03L-0:on 800213,during Surveillance Tour,B Loop of Core Spray Was Found Draining from Torus After Being Placed Under Clearance for Maint.Caused by Open FO-10B Valve,Pump Vents & Drain valves.FO-10B Valve Was Shut + (11:17:47, 2 January 2025)
- 05000324/LER-1980-028, Forwards LER 80-028/03L-0 + (11:17:49, 2 January 2025)
- ML19305A823 + (11:17:50, 2 January 2025)
- 05000325/LER-1980-018, Forwards LER 80-018/03L-0 + (11:17:51, 2 January 2025)
- ML19305A817 + (11:17:52, 2 January 2025)
- ML19305A816 + (11:17:53, 2 January 2025)
- 05000325/LER-1980-026-03, /03L-0:on 800212,during Normal Operation,Control Operator Received Upscale,Downscale,Inoperable & Rod Block Alarms on Rod Block Monitor A.Caused by Blown Fuse in 28 Volt Power Supply.Fuse Replaced + (11:17:54, 2 January 2025)
- 05000325/LER-1980-026, Forwards LER 80-026/03L-0 + (11:17:55, 2 January 2025)
- TXX-3107, Forwards Electrical Instrumentation & Control Drawings. Drawings Available in Central Files Only + (11:17:57, 2 January 2025)
- 05000313/LER-1980-004-03, /03L-0:on 800205,during Operational Test for Leak Rates,Reactor Bldg Ventilation Penetrations V1 & V2 Found Leaking in Excess of Tech Specs.Caused by Maladjusted Valve Seats.Valves Readjusted & Retested + (11:18:03, 2 January 2025)
- 05000313/LER-1980-004, Forwards LER 80-004/03L-0 + (11:18:05, 2 January 2025)
- ML19305A807 + (11:18:06, 2 January 2025)