Notifies of Actions Taken to Respond to NRC Review of TMI-2 Accident:Endorsed BWR Owners Group Responses,Emergency Plan & Training Program Underway & Preparing Suppl to NEDO-24708
ML19305A829
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 03/11/1980
From: Stampley N
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0578, RTR-NUREG-578 AECM-80-24, NUDOCS 8003180432
Download: ML19305A829 (7)


Text

,

. l i

l MISSISSIPPI POWER & LIGHT COMPANY

]

Helping Build Mississippi \

EdMdMdim P. O . B O X 1840. J AC K S O N, MIS SISSIP PI 3 9 2 0 5 l

l NoRRIS L. sTAMPLEY March 11, 1980 vtCE Part:0ENT U. S. Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Washington, D. C. 20555 ATTENTION: Mr. Harold R. Denton, Director

Dear Sir:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0272/0270/L-860.0/16684/0755 Follow-up Action Regarding the Three Mile Island Unit 2 Accident AECM-80/24

REFERENCES:

(1) T. D. Keenan to H. R. Denton dated October 1, 1979 (2) MP&L letter to H. R. Denton dated August 10, 1979 (AECM-79/85)

Subject:

Intermediate BWR Plant Owners Group (3) D. B. Vassallo letter for All Pending Operating License Applicants dated September 27, 1979 The purpose of this letter is to inform you of the actions we are tak-ing to respond to the NRC ataff review regarding the Three Mile Island-2 accident. As you are aware, we have been successful in our efforts to join the General Electric Operating Plant Owners Group as indicated in Reference

1. We have been participating in the Owners Group since August and will utilize the Owners Group activities in the same manner as the original mem-bers in responding to the Reference 3 letter and the NRR Bulletins & Orders Task Group. Therefore, the need for the Intermediate BWR Plant Owners Group, discussed in Reference 2, no longer exists and it has been disbanded.

Accordingly, NRC review effort unique to the Intermediate BWR Plants will generally not be required. This will sava time and effort both on your part and ours.

In response to your request in Reference 3 that we begin implementation of the actions contained in NUREG-0578 and its supplements, we have prepared Attachment I which basically endorses the BWR Owners Group responses. For those items where plent unique differences exist, we have added clarifications.

Our current schedule is to implement these action items prior to receipt of our operating license with changes to our FSAR being submitted in accordance with review schedule requirements.

With regard to our actions in the areas of Emergency Planning and Pre-paredness and Improvements in Operator Training, we are proceeding in accordance300/

with the intent of the guidelines provided in Enclosures 7, 8 and 9 of Reference 315

3. Revisions to our Emergency Plan and Training Program are currently underway ///

MD'. $6 Member Middle South Utilities System pn. 4..d I I i

- 6 ( 0318 0 %k l

e MISSISSIPPI POWER & LIGHT COMPANY Mr. Harold R. Denton Nuclear Regulatory Commission Page two and will be submitted in accordance with established review schedule require-ments prior to receipt of our operating license.

In keeping with your proposal of Reference 3 to become involved in the activities of the NRR Bulletins & Orders Task Group, we are participating in the preparation of a supplement to the General Electric report NEDO-24708. To this end, we are working with the other Owners formerly in the In-termediate BWR Plant Owners Group (Detroit Edison Company (Fermi-2), Washington Public Power Supply System (WPPSS-2), and Pennsylvania Power & Light (Susque-hanna-1/2) and G. E. to provide a supplement that includes these plants in the NEDO report. This supplement is currently being prepared and will be submitted in early 1980. Future Owners Group submittals in response to Bulletins and Orders Task Force requests will generally include where possible Grand Gulf, except that small break operator guidelines and responses to Bulletins and Orders Task Force Question 13 through 16 will be submitted by separate supple-ment to NEDO-24708. Responses to Inspection and Enforcement Bulletin No. 79-08 as well as plant unique data requested by the Bulletins & Order Task Force Group is being submitted by separate correspondence.

The information provided in the supplement to NEDO-24708, our response to I & E Bulletin No. 79-08, plus the plant unique data will provide you with the same information for Grand Gulf Units 1 and 2 as has been submitted for the original G. E. Operating Plant Owners Group. With similar submittals being made by Detroit Edison Company (Fermi-2), Washington Public Power Supply System (WPPSS-2) and Pennsylvania Power & Light (Susquehanna-1/2) you will have information in the same format for all G. E. Operating BWR's and BWR's with pending Operating Licenses. This provides an opportunity for you to review Grand Gulf Units 1 and 2 and the other intermediate BWR plants in the same manner and using the same resources used for the submittal by the original Owners Group members. We believe this approach to be of mutual benefit l in most efficiently utilizing available resources. We strongly urge you to pro- '

ceed accordingly.

In addition to the above activities, we have reviewed your TMI-2 Lessons Learned Task Force Final Report (NUREG-0585), the President's Commission l Report (Kereny Report), and the Report to the Conunissioners and to the Public I (Rogovin R> port) and are actively evaluating and addressing the recommendations )

therein.

J Sincerely, f 9 s

1o f

i j MRK/JDR:pa

( Attachment l cc: (See Next Page) '

I l

- . - . - .~ . -

A b ,

Mississippi POWER 8: LIGHT COMPANY Mr. Harold R. Denton Nuclear Regulatory CommisuAon '

Page three cc: Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Jr., Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Consnission Washington, D. C. 20555 1

1 F

I i

i l

1 l

l

. . - - . -- - .- . _ - . . . - - . . -. __ .--.1

t *

(Attachment 1)

Mississippi Power & Light Company - Grand Gulf Units 1 and 2 (Docket Nos. 50-416 and 50-417)

Commitments to Meet Requirements of NUREG-0578 This attachment contains commitments by Mississippi Power & Light Company for t Grand Gulf Nuclear Station to the requirements set forth in NUREG-0578 and

! items (a) through (f) of Mr. D.~B. Vassallo's letter of September 27, 1979.

Because of our active involvement in the BWR Owners Group and the subsequent review of the Owners Group positions on NUREG-0578 items by the NRC, we have chosen the Owners Group positions as the means of responding to Mr. D. B. Vassallo's letter of September 27, 1979. For reference purposes, a copy of the BWR Owners Group postions as transmitted by Mr. T. D. Keenan's letters on the subject to Mr. D. G. Eisenhut dated October 17, 1979, and November 15, 1979, are enclosed as part of this attachment.

NUREG-0578 Item 2.1.1 Emergency Power Supplies Grand Gulf concurs with the BWR Owners Group position.

NUREG-0578 Item 2.1.2 Performance Testing for Relief and Safety Valves i

We are aware of the NRC's rejection of the Owners Group position, and our own response to that rejection will be handled through the BWR Owners Group.

NUREG-0578 Item 2.1.3a Direct Indication of S/RV Valve Position Grand Gulf concurs with the Owners Group position and will implement the re-quiremants accordingly.

NUREG-0578 Item 2.1.3b Instrumentation for Inadequate Core Cooling Grand Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

.o

. (2)

NUREG-0578 Item 2.1.4 Containment Isolation Provisions for PWR's and BWR's Diversity of initiation parameters and manual reset are already implemented.

We are currently revissing essential and non-essential systems and will make needed isolation valve logic changes or provide appropriate justification in i

the FSAR where isolation is not desirable.

NUREG-0578 Item 2.1.5a Dedicated Hydrogen Control Penetrations I Grand Gulf has permanently installed inside the containment redundant post-LOCA dydrogen recombiners that meet the requirement of GDC 54 and 56.

NUREG-0578 Item 2.1.5b Inerting BWR Containments Since this item has been deferred by the NRC, it will not be addressed.

NUREG-0678 Item 2.1.Sc Installing Hydrogen Recombiners in LWR's Combustible gas control recombiners are permanently installed inside the containment and remotely operated. Personnel access to potentially contami-nated areas is not required for operation.

NUREG-0578 Item 2.1.6a Systems Integrity for High Radioactivity Because we are not confined by the same time limitations as the operating plants, we have not completed our investigations as of this date, however, Grand Gulf concurs with the BWR Owners Group position and will implement these requirements in accordance with the implementation schedule of NUREG-0578.

NUREG-0578 Item 2.1.6b Plant Shielding Review .

Grand Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

NUREG-0578 Item 2.1.7a Auto Initiation of Auxiliary Feedwater This item is not applicable to BWR's.

NUREG-0578 Item 2.1.7b Auxiliary Feedwater Flow Indication This item is not applicable to BWR's.

  • (3)

NUREG-0578 Item 2.1.8a Improved Post-Accident Sampling Capability Grand Gulf concurs in principle with the BWR Owners Group position; however, because we are not confined by the same time limitations, we are still in the review stage and are act able to commit to any specific design changes at this time. We are, however, actively pursuing a course of action that will satisfy the NRC position on this item, and implementation of these re-quirements will be in accordance with the implementation schedule of NUREG-0578.

NUREG-0578 Item 2.1.8b Increased Range of Radiation Monitors Grand Gulf concurs with the BWR Owners Group position and will implement these requitr_aents accordingly.

l NUREG-0578 Item 2.1.8c Improved Inplant Iodine Instrumentation Grcnd Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

I NUREG-0578 Item 2.1.9 Transient and Accident Analyses Grand Gulf concurs with the BWR Owners Group position and will implement t

these requirements accordingly.

NUREG-0578 Item 2.2.la Shif t Supervisors' Responsibilities j

l Grand Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

J NUREG-0578 Item 2.2.lb Shift Technical Advisor Grand Gulf concurs with the BWR Owners Group position; however, it should be noted that we are aware of the NRC's rejection of the BWR Owners Group position, and our own response to that rejection will be handled through the BWR Owners Group.

NUREG-0578 Item 2.2.lc Shift Turnover Procedures

+

Grand Gulf concurs with the BWR Owrsrs Group position and will implement these requirements accordingly. -

e

- ~ - . - - --v -. , -

, (4)

NUREG-0578 Item 2.2.2a Control Room Access Control Grand Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

NUREG-0578 Item 2.2.2b On-site Technical Support Center Grand Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

N' <G-0578 Item 2.2.2c On-site Operation Support Center Grand Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

NUREG-0578 Item 2.2.3 Revised Limiting Conditions for Operations Since this item has been deferred by the NRC, it will not be addressed.

ACRS Items--Containment Pressure. Water Level, and Hydrogen Monitors i

Grand Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

H. R. Denton Item--Reactor Coolant Systems Venting Grand Gulf concurs with the BWR Owners Group position and will implement these requirements accordingly.

t

r j . .,

k ..- ,{ Q G: fi ' V.4hc sCX . ~

& u . b -. b .u

$-v v, i J '

ft ,y VERMONT YA.NKEE NUCLEAR POWER CORPORATION V scvorry styrx caovt stom-

-a

.W R c r t.A.x n , V I s n t o x T m ;o1

.s-

)

' i ."

TT.SihCD4 O N

.a.

c- t

.5 5

Ecvember 1.5, 1979 A l l

-?.s - ,

)

-ia s , 9 s

  1. e 1er. D.triell G. Eisenhut 1 :ing Director 9

D Div:. sic ef Operacing teae:crs U. S. Fucinar Regula:ory comissien

.h.. 7920 T.orfoli Avence

.g.I _ ._

2 .. 3ethesda, M.aryland 20014

.T 4P :- Suoject: E'1 Cvoers' Creup Posi: ices on EU"IG-CS78

.- . -. n~ n .

.4--...-- -._ n. w . _ _ _

.li i Refarance: 1.e::ar, T. D. Ieenas to D. C. Eisenhut, sue subject, Cc: ber 17,1979 I

. .I- .- ,

4-

Dear 'dr. i.ise hut:

1

.4

1. In zy 00::ber 17, 1979, Ls:ter to you (leference 1), i: was indicated that i I

j Cencral Elec:ri: 5:111:3 *='2:er Reactor Cvsers' Group pcsiticus on :hree of the q requirese::s of 571F.G-0578 v:.re s:ill u=dar develepsect and veuld be submit:ed

'( to you on 5cvember 1.5, 1979. The purpose of this letter is to r.stify you that 3 these three positi==.s are being ers:s 1 :ed to you tod.ay by :he General j- Ele::ric Coe:pa=y en behalf of the C*mers' Group.

3. These pcsittens should be inserted in:o the docune==, **KC4.EC-0578 and I=clemen-Q s. :scien Letter Eequirements - 3*41 Owners' Group Isolemen:atics Criteris,"

js Cet:ber, 1979, which vas submitted by :he Or.,ers' Group oc October 17, 1979.

3: All of :be prevdsions of my Oc:cber 17, 1979, le::er apply :o these positicas

-r as well. I a .c  !

3 s4- w y* /') /

j!.,

M.oe j / y#< .

T W

$z ... -- .b g

  • ~~

W r -si m. - e , hD 2-41 Trwee en,---rs oe.ners' C: nee

.s *

".4 3

8  % ~':=st .

4 a

6>#)\

4 l 4

3 s

d n ,

8 _ _ _ _ _ _ __

v m , s--r:- %.-:a-- p.a.cz i of ,,

N, e.. - - .. o

~-

-;. g.  %~ ,

.ct n

or ?r. n.zissV;::.RMONT n t m TMKEE

-2r cm en.c7

~

NTICLEAR POW ER CORPOR ATION ?G (R / g ty,,__)

eq v :m rv snm cacvc sms:r p V ke Rt.,r.em, VmurosT crimi / iid

a m

vqr, u- man P=m same W P. .

e V

u vs Oc:cber 17, 1979 e4 h 36" Mr. O,?.r:d1 G. Eisa-At, ic* ' 3 Dire =:ce D 01:'1310: of 07erati 4 Ieactors O U. 3. N cica.r Regulatory Ccuzissien D E

M 20 Scric1k Avenue lethe =ds, Ms..yissd 2C014

Subject:

5'41 C-s=ers Group Positicas on SiU?E-0573 E)

[4

f. closu =: CI K2 0:rcers Croup M 2.EG-0573 ?=sitic== Submitral Schadula h3 kt N' r F . Eise h.t:

P

,g b

1: pr: Tic =!7 disCOG5ed trith 700 and me2berS Cf your 0:M ation, the 'A* nerAl '24 Tlectric iot 3 %::er I=2c:cr Owner: Croup h== d= reI =ed = ==mber of dat=iled h c "':21 p :iticas for irII;-0573 recc :mendatices a.s they apply to soilleg Watar y Res::cr:. ne p:rpose of dis letter is to advise you of de status of preparation P.2 V cf these pe=i:icas a :4 to prov24c y:m with a schedule for sderittal of these  %

dec -m - s. - 3--8#-- cd i= :he e=cicsure := this let:er. The tandings of the h

-- rterm cela::s in de enciesure ara self-expiarlsto.ry and do ::ct require discussion. 9%

Tha po=itic:s being schnitted to you represa.nt a concesses cf de operating plant b

>i:Se:s of c..: Ow:ers Gre=p a:r.1 it is antic.ipated that =e.zher c=====ies vill he c: li:ing these st A--Ja 541:g st.11ed to you aa part of their c=ss:iement to d i== c=en: the racm=.andardens of NCIC-0573. In order to stre clina processir. . Q rypi:2 sad repre<iuctica, de C-?:eral T.iectric Cct: =y h== scted as the fo<:al if poi::: for subci::ai of de dec ::ents ce cur behalf. Cc:2:que. ly the positic:3 @)

ss indica:a' " -b e=clesura vill be m2.iled directly to ycur office frca Ge:.aral y Elec:r c ce r acy. Sch=Ittal of dese ;<>sitions by de Ow=ers cecus does cot G constitute cre=rir::ent by or for any indirideal utiliry. -Sc.,+se co'=m4 rze .cs will  %

be ==de is es" '~*:-idual utility i=pleot ets tium !=tter. .P2 U

7:r these i:m recuiri:: a Jmry 1,1930, i::piner:stion d.2te 10 is r.ecessary 3 t' a: we hne S.inefit of any ccmets frn your orgaa*

  • tie = en those Cars Group h, 204i M0*.3 vhich :n your ,adp,+witt Trs,uirm rdiftcaric:.

8 3+c...,6e af thia shon $

---~7' is =rcussary :h:t y :ur co--=--t be prov12 d := =s vit.hi: rvc vesi! M

" := fr.ra of r: ecip cf thma positten doc:::e:05 If ve do ot hur frs= your

=n=ima: ei, et ti:2 pe:-w - Vul asr=,. dat de y ir4.- .= p=vid-d y%,g Ar? M ipt.Nia 2 d vill pr:ce=d .id i: Ole:a:CatiO: aa indicatud hY dC54 pcGitie:3. i, 7

Ve believe the w i:.ieu 51:9 - - by cur ov=ers G::== are re.=pe==iv= t= the i::=: cf T.~-::- -0U.i f:r 1:i'irg Water Rs.ac;;rm ;-d trant you v:li concut vi:h k'j fp ' 'f, b

d f,

1) h  ?'

p ,- - .,.

..e.O

- .v.3 Hr. Ocr:ci C. Usenaut i

  • , ;w ti-:cher 17. 1979

?1?= 1 .

H e4 rj y +

-H C

cur positten en these =atters. If ycu have any questions or coxm cu the $

positiscs Sci == fervarded to you, ploasa call che work.ing chairman of the IGGG h.

I:plementarten T.u'c Force withis our Cuncrs Crcup, 2fr. .foe 3 una of the TW )

r-511ay .t.utherity (GU DF3435). If you are en.able es contact Mr. By=um p1*== h-carise e of your questicus or coccerns and 1 v1.11 tuare that a representaciw 3 cf our Crcrs.Cr=np coetacta you with =pecific respe=ses to thou concems.

Siccarely ycurs, // d l T,

_/ -. /

y 'Qi \

Nas D. Ice * *a , Chairs =n ,4 Ga.neral Electric ' Jailing Eater h Reactor Cwners Creep G w

T'm$C2C ,

9( E a

i 9 3, J

s n

I I

?y

's n

. o. . .'.: ~ ~.: . ' . ~ v -.i...*** . 6*: h ' ;. ; '. *; : '.' a . L'. ;1.--~.:.t

. ws.~~,*_,,.,.a..,..,. -

s ,.,,,..z.a,-.,, ..a . , . , .. . ., ., y, . E

r e~..- ,

3 Ia CE I*. t cWS cro ".U Tr,-CUS MITic35 wed!!U. SCEDCI.E Ta bc b..: Sutgittad N/A Provided Individt 4 ESC to IEC to to RC Ccur;:an y %1EC Dele _r:s1 en 10/17 322s ,bv 11/15 Positie g Irri $cb4ect

?!

/yZ1.1 -.

Imersecc7 ?cse: 54 ply X C3 2.1.2 lelief .5:4 'a' fety 721w Iest

. I

1 3 ;4 .M 3.1.3.a "Jirec t T-dicatics of Valre Pesition I 14

.9 I

.i 2.1.3.b Iastr;:ssntatica for Tr.sdequata Cara y'$.

Co=11=;

4 Ccetai==en: Eschtic: 1 I Q?.1.6

.M 1 4 G?.1.3.s Dedicatad 5, CcutTol Panstraticus

.*t

~

I:ertin:; E Ceutaincents I g 7 H2.1.5.b Q

!" d.2.1.5.e txc=bi- - 7:=c *es 9 I 9

13 7 3j2.1.6.s Syst m_._s Inte d 27 for High 2=dioactivity 9 I

>J

=1 Pl=== Shielding Review Q I

/e 732.1.6.5 I

// N~2.1.7.3 Auto !=itist'.au of A=rilim Teedwater

.- -t.

< i=ill ry Feeevstar Ikw rat,--tica I

%.32.1.7.b M T

/.7 @ .1.3.a  ?.7st-Arci!. =t C2=cli=g ,

d I

/,G' M1.1.3.b **@ knge "hdiatirm 14:n.itors c-Igrrriad Icdine !=stT==euratf=n I

/f'g'l.1.3.c D I

/4 Ij2.I.9 A Tr=nsic=:t 404 A.:cident Anal 7713 11 1

/7 M:I !.2.1.a $hift kpe niser 2:spensibl.II:lec n I

/ T U2.2.1.5 Shift Itchnical Liv'.scr

.,2 2.u:: ..

,. recvar ?roced=rms A

'f 1, 3. . .. 1,: .

2 e 2 ;. :'.2,a ca.t :1 3cca Access I

?

2/ i-f 2.2.2.5 0: lite 7.@.ir.21 h. er- m Cc= car I

I 12 "f'.2.*.c y
n Si;a 0:c-s:ic=.4i S== ce: Cam:er
  • s

) . ' I.2.3 ". */ifed ! 3ICi. $ OA*0.5I$id f4Y 0?Cr301C3 I

.~*.

e.

h 4 i

'8,

  • Y O.".9 715""*4"'. *= 3 *
  • f dVW1 U . "* OCeCIT10iO:

'. O" * "3 *.: ' t 0 ', 3

.4; p. :is c '.*4:ttic ; <

. . i i

G E N E R A L h: E LE CT R I C , NUCLEAR POWER ,

! SYSTEMS DIVISION l l GENERAL ELECTRIC COMPANY,17s CURTNER AVE., SAN JOSE. CALIFORNIA 9s12s i MO 682, (408)-925-5722 4

MFN-277-79 N0Y //, / 7it.9 i

t 1

i U. S. Nuclear Regulatory Commission Division of Operating Reactors i' Office of Nuclear Reactor Regulation .

Washington, D.C. 20555

) '

Attention: Darrell G. Eisenhut, Acting Director l Division of Operating Reactors BJ 4

- BWR OWNERS GROUP POSITIONS ON NUREG-0578

Reference:

Letter, T. D. Keenan to D. G. Eisenhut, same subject,

. November 15, 1979 1 -

1 As described in the reference, sixty (60) copies of the BWR Owners Group l positions on NUREG-0578 Requirements 2.1.6A, 2.1.68, and 2.1.8A are i

transmitted herewith on behalf of the BWR Owners Group.

. These positions should be inserted into the document "NUREG-0578 and j Implementation Letter Requirements - BWR Owners Group Implementation j Criteria," October 1979, which was submitted by the Owners Group on j October 17, 1979.

1 Very truly yours, LM -

i i R. H. Buchholz, Manager l BWR Systems Licensing

! Safety and Licensing Operation RHB:bjr/1059 N l D DUPLICATE DOCUMENT Entire document previousl.y + y>

entered into system under: Nj ANO h No. of pages: N