Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309F413 + (07:47:49, 2 January 2025)
- ML19309F408 + (07:47:52, 2 January 2025)
- ML19309F407 + (07:47:52, 2 January 2025)
- ML19309F406 + (07:47:53, 2 January 2025)
- ML19309F404 + (07:47:54, 2 January 2025)
- ML19309F405 + (07:47:54, 2 January 2025)
- ML19309F401 + (07:47:55, 2 January 2025)
- ML19309F403 + (07:47:55, 2 January 2025)
- ML19309F399 + (07:47:57, 2 January 2025)
- TXX-3127, Provides Status of Interim Deficiency Rept Re Installation & Insp Requirements for Class V non-nuclear safety-related Piping Supports.Final Rept Will Be Forwarded by 800715 + (07:47:58, 2 January 2025)
- 05000265/LER-1980-009-03, /03L-0:on 800322,while Performing Pci Simulated Automatic Closure Initiation Test,Procedure Qos 1600-13, Transient in-core Probe 2,failed to Respond to Group 2 Isolation Signal.Caused by Dirty Contacts on Relay K21 + (07:48:02, 2 January 2025)
- ML19309F394 + (07:48:03, 2 January 2025)
- 05000325/LER-1980-031-03, /03L-0:on 800329,during Normal Operation, Containment Atmosphere Oxygen Monitor 1-CAC-AT-1263 Had Step Change.On 800330,1% Step Change Observed.Caused by Shift in Instrument Calibr.Oxygen Monitor Will Be Replaced + (07:48:04, 2 January 2025)
- ML19309F392 + (07:48:05, 2 January 2025)
- 05000325/LER-1980-031, Forwards LER 80-031/03L-0 + (07:48:06, 2 January 2025)
- 05000334/LER-1980-023-01, /01T-0:on 800411,during Operational Mode 5,w/ Steam Generators Drained & RCS Level mid-span in Loops, Complete Loss of RHR Flow Occurred While Plant Operators Were Increasing RHR Heat Exchanger Flow + (07:48:08, 2 January 2025)
- ML19309F388 + (07:48:09, 2 January 2025)
- 05000334/LER-1980-023, Forwards LER 80-023/01T-0 + (07:48:10, 2 January 2025)
- 05000317/LER-1980-016-03, /03L-0:on 800325,during Surveillance Testing, Channel a Wide Range Nuclear Instrument Did Not Respond in Calibr Mode.Apparently Caused by Failure of Channel Preamplifier.Power Supply Replaced W/Spare + (07:48:11, 2 January 2025)
- 05000313/LER-1980-008-03, /03L-0:on 800324,while Performing Surveillance Test,Bypass Flow Was Observed to Be Zero Due to Failure of CV-2126 in Closed Position.Caused by Blown Control Fuse.Fuse Replaced & Valve Proved Operable + (07:48:13, 2 January 2025)
- 05000317/LER-1980-016, Forwards LER 80-016/03L-O + (07:48:14, 2 January 2025)
- ML19309F380 + (07:48:16, 2 January 2025)
- 05000265/LER-1980-009, Forwards LER 80-009/03L-0 + (07:48:17, 2 January 2025)
- 05000317/LER-1980-005-03, /03L-0:on 800325,during Normal Operation,Control Room Air Conditioning Unit 12 Tripped.Caused by Failure of Diaphragm on Unipressure Valve.Valve Replaced & Unit Returned to Svc + (07:48:19, 2 January 2025)
- 05000313/LER-1980-008, Forwards LER 80-008/03L-0 + (07:48:20, 2 January 2025)
- 05000317/LER-1980-005, Forwards LER 80-005/03L-0 + (07:48:22, 2 January 2025)
- ML19309F372 + (07:48:23, 2 January 2025)
- 05000348/LER-1980-024-03, /03L-0:on 800330,while Performing Turbine Startup, 1B SGFP Tripped Due to 1B Steam Generator High Level Signal. Caused by Poor Communication Between Plant Operators. Personnel Instructed Re Maintaining Proper Communication + (07:48:24, 2 January 2025)
- 05000348/LER-1980-024, Forwards LER 80-024/03L-0 + (07:48:25, 2 January 2025)
- ML19309F367 + (07:48:26, 2 January 2025)
- ML19309F366 + (07:48:27, 2 January 2025)
- ML19309F364 + (07:48:27, 2 January 2025)
- ML19309F360 + (07:48:31, 2 January 2025)
- ML19309F358 + (07:48:32, 2 January 2025)
- ML19309F354 + (07:48:33, 2 January 2025)
- ML19309F357 + (07:48:33, 2 January 2025)
- ML19309F353 + (07:48:34, 2 January 2025)
- 05000266/LER-1980-003-03, /03T-0:on 800318,during post-mod Testing of Containment Spray Sys,Relay 1CSB Would Not Latch.Caused by Latching Mechanism Misalignment.Latch Adjusted & Proper Operation Verified on 800318.Similar Relay Bench Tested + (07:48:39, 2 January 2025)
- 05000266/LER-1980-003, Forwards LER 80-003/03T-0 + (07:48:41, 2 January 2025)
- 05000266/LER-1980-002, Updated LER 80-002/01T-01:on 800311,during 800 Psi Secondary to Primary Hydrostatic Leak Test,Tubes R23C44 & R8C37 & Plug End R23C50 Found Leaking.Eddy Current Insp Performed.Tube Holes & Leaking Explosive Plugs Were Plug Welde + (07:48:42, 2 January 2025)
- 05000245/LER-1980-006-03, /03L-0:on 800407,during Normal Operation,Pressure Indicating Switch That Senses Drywell Pressure for Automatic Pressure Relief Sys Logic Initiation,Found Isolated.Caused by Personnel Error.Switch Returned to Svc + (07:48:45, 2 January 2025)
- 05000245/LER-1980-006, Forwards LER 80-006/03L-0 + (07:48:47, 2 January 2025)
- ML19309F339 + (07:48:48, 2 January 2025)
- ML19309F333 + (07:48:49, 2 January 2025)
- ML19309F337 + (07:48:49, 2 January 2025)
- ML19309F332 + (07:48:50, 2 January 2025)
- ML19309F330 + (07:48:51, 2 January 2025)
- TXX-3124, Forwards Deficiency Rept Re Concrete Honeycomb Condition Encountered in Steam Generator Compartment Walls of Unit 2 Reactor Containment Bldg + (07:48:52, 2 January 2025)
- ML19309F327 + (07:48:53, 2 January 2025)
- ML19309F325 + (07:48:54, 2 January 2025)
- ML19309F324 + (07:48:55, 2 January 2025)