Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19310A315 + (07:01:51, 2 January 2025)
- 05000333/LER-1980-048-03, /03L-0:on 800507,personnel Discharged Contents of Laundry Drain Tank W/O Obtaining Permit.Operating Procedures Are Being Modified to More Clearly Indicate Requirement to Obtain Discharge Permit Prior to Start of Discharge + (07:01:52, 2 January 2025)
- ML19310A313 + (07:01:53, 2 January 2025)
- A800029, Discusses Effect of Dc Power Supply Failure on ECCS Performance.Forwards Listing of ECCS Sys Available W/ Various Single Failures.Loss of Equipment Due to Water Spillage Has Been Satisfactorily Addressed + (07:01:53, 2 January 2025)
- ML19310A311 + (07:01:55, 2 January 2025)
- ML19310A310 + (07:01:58, 2 January 2025)
- 05000333/LER-1980-048, Forwards LER 80-048/03L-0 + (07:01:59, 2 January 2025)
- ML19310A306 + (07:02:01, 2 January 2025)
- ML19310A305 + (07:02:01, 2 January 2025)
- ML19310A304 + (07:02:03, 2 January 2025)
- ML19310A303 + (07:02:03, 2 January 2025)
- ML19310A302 + (07:02:04, 2 January 2025)
- ML19310A301 + (07:02:04, 2 January 2025)
- ML19310A299 + (07:02:05, 2 January 2025)
- ML19310A300 + (07:02:05, 2 January 2025)
- ML19310A298 + (07:02:06, 2 January 2025)
- ML19310A297 + (07:02:07, 2 January 2025)
- ML19310A296 + (07:02:08, 2 January 2025)
- ML19310A294 + (07:02:11, 2 January 2025)
- ML19310A293 + (07:02:12, 2 January 2025)
- ML19310A292 + (07:02:13, 2 January 2025)
- 05000285/LER-1980-009-99, /99T-0:on 800522,during Maint on Stack Iodine Process Monitor,New Sensitivity Calibr Was Required.Caused by Use of Wrong Calibr Procedure.Training Will Be Conducted to Ensure Familiarity W/Procedures + (07:02:14, 2 January 2025)
- ML19310A289 + (07:02:16, 2 January 2025)
- ML19310A288 + (07:02:22, 2 January 2025)
- 05000285/LER-1980-009, Forwards LER 80-009/99T-0 + (07:02:23, 2 January 2025)
- ML19310A285 + (07:02:24, 2 January 2025)
- 05000333/LER-1980-050-03, /03L-0:on 800509,MSIV Failed Leak Tightness Limit of Tech Spec.Caused by Packing Leakage Due to Age.Valve Repacked + (07:02:25, 2 January 2025)
- ML19310A283 + (07:02:28, 2 January 2025)
- ML19310A281 + (07:02:29, 2 January 2025)
- ML19310A279 + (07:02:29, 2 January 2025)
- 05000333/LER-1980-050, Forwards LER 80-050/03L-0 + (07:02:31, 2 January 2025)
- 05000285/LER-1980-008-03, /03L-0:on 800515,during Check of Power Supply Trip Indicating lights,AB-1 Matrix Relay of Reactor Protective Sys Failed to Trip Clutch Power Supplies.Caused by Failure of Mercury Wetted Relay in Matrix Circuit + (07:02:33, 2 January 2025)
- 05000285/LER-1980-008, Forwards LER 80-008/03L-0 + (07:02:35, 2 January 2025)
- 05000333/LER-1980-049-03, /03L-0:on 800507,during Plant Shutdown & Cooldown for Refueling,Torus Water Level Exceeded Tech Spec Limit. Caused by Release of Drywell to Torus Differential Pressure. Addition of Water to Torus Restored Level within Limit + (07:02:37, 2 January 2025)
- ML19310A272 + (07:02:39, 2 January 2025)
- 05000333/LER-1980-049, Forwards LER 80-049/03L-0 + (07:02:40, 2 January 2025)
- ML19310A267 + (07:02:41, 2 January 2025)
- ML19310A265 + (07:02:42, 2 January 2025)
- ML19310A264 + (07:02:43, 2 January 2025)
- ML19310A262 + (07:02:44, 2 January 2025)
- ML19310A261 + (07:02:45, 2 January 2025)
- ML19310A260 + (07:02:46, 2 January 2025)
- ML19310A258 + (07:02:47, 2 January 2025)
- ML19310A257 + (07:02:49, 2 January 2025)
- ML19310A256 + (07:02:51, 2 January 2025)
- ML19310A255 + (07:02:52, 2 January 2025)
- ML19310A254 + (07:02:53, 2 January 2025)
- ML19310A253 + (07:02:55, 2 January 2025)
- ML19310A252 + (07:02:57, 2 January 2025)
- ML19310A251 + (07:02:58, 2 January 2025)
- ML19310A250 + (07:02:59, 2 January 2025)