Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246E450 + (04:57:42, 2 December 2024)
- ML20246E443 + (04:57:43, 2 December 2024)
- W3P89-0098, Application for Amend to License NPF-38,updating Section 6.0 Refs to 10CFR55 Re Operator Qualification & Training Requirements for Licensed Reactor Operators & Senior Reactor Operators + (04:57:44, 2 December 2024)
- BECO-89-124, Responds to Request for Addl Info Re Proposed Tech Spec Change on Visual Insp of High Energy Piping Outside Primary Containment During Plant Operation.Bechtel Calculation Re Pipe Break Outside Containment Encl + (04:57:45, 2 December 2024)
- ML20246E436 + (04:57:45, 2 December 2024)
- ML20246E430 + (04:57:46, 2 December 2024)
- ML20246E432 + (04:57:46, 2 December 2024)
- ML20246E429 + (04:57:47, 2 December 2024)
- ML20246E427 + (04:57:49, 2 December 2024)
- ML20246E422 + (04:57:50, 2 December 2024)
- ML20246E423 + (04:57:50, 2 December 2024)
- ST-HL-AE-3080, Forwards Update of Addl Actions Being Performed,Per NRC Bulletin 88-010.Molded-case Circuit Breakers,For Which Traceability Cannot Be Verified,Located in Warehouse, Segregated.No Refurbished Breakers Identified + (04:57:52, 2 December 2024)
- ML20246E411 + (04:57:53, 2 December 2024)
- ML20246E409 + (04:57:54, 2 December 2024)
- ML20246E406 + (04:57:55, 2 December 2024)
- ML20246E400 + (04:57:56, 2 December 2024)
- ML20246E401 + (04:57:56, 2 December 2024)
- ML20246E397 + (04:57:58, 2 December 2024)
- ML20246E398 + (04:57:58, 2 December 2024)
- 05000414/LER-1989-007, :on 890316,containment Air Return Fan 2A Started in Response to High Containment Pressure.Caused by Inadequate Policy Involving Control of Sliding Links.Fan Secured & Timer Calibr Reperformed + (04:58:00, 2 December 2024)
- ML20246E395 + (04:58:01, 2 December 2024)
- IR 05000282/1989019 + (04:58:02, 2 December 2024)
- ML20246E392 + (04:58:02, 2 December 2024)
- ML20246E389 + (04:58:03, 2 December 2024)
- ML20246E387 + (04:58:03, 2 December 2024)
- ML20246E386 + (04:58:04, 2 December 2024)
- 05000277/LER-1989-015-01, :on 890721,main Turbine Bypass & Control Valves Opened,Causing Main Steam Line Pressure to Decrease to Approx 480 Psig & Full Reactor Scram.Caused by Malfunction of Pressure Regulator Set.Component Replaced + (04:58:06, 2 December 2024)
- ML20246E377 + (04:58:07, 2 December 2024)
- ML20246E376 + (04:58:08, 2 December 2024)
- ML20246E375 + (04:58:09, 2 December 2024)
- 05000278/LER-1989-001-03, :on 890720,flow Estimate Not Performed When Reactor Bldg Exhaust Flow Recorder Made Inoperable.Caused by Procedure Not Requiring That Flow Rate Be Estimated within 4 H of Removing Recorder.Personnel Counseled + (04:58:10, 2 December 2024)
- 05000325/LER-1989-012, :on 890407,HPCI Sys Steam Line Differential Pressure Transmitter Monitor Operated Outside Required Tolerance.Caused by Conservatively Narrow Dsr Tolerances. Tolerance Range Expanded & Setpoints Revised + (04:58:13, 2 December 2024)
- 05000260/LER-1989-011, :on 890404,RHR Svc Water Pump Room A-1 Sump Pump Declared Inoperable Due to Problem W/Level Switch Controlling Pump Operation.Caused by Sys Outages in Progress.Rhr Loop II Declared Operable + (04:58:15, 2 December 2024)
- ML20246E364 + (04:58:16, 2 December 2024)
- ML20246E363 + (04:58:17, 2 December 2024)
- ML20246E360 + (04:58:17, 2 December 2024)
- 05000458/LER-1989-014, :on 890405,operator Inadvertently Initiated Standby Svc Water Sys During Svc Water Vacuum Release Valve Testing,Causing CRD Pump to Trip.Caused by Operator Error. Operator Reinstructed Re Board Manipulations + (04:58:19, 2 December 2024)
- ML20246E355 + (04:58:20, 2 December 2024)
- ML20246E353 + (04:58:21, 2 December 2024)
- ML20246E351 + (04:58:22, 2 December 2024)
- ML20246E348 + (04:58:23, 2 December 2024)
- ML20246E346 + (04:58:24, 2 December 2024)
- ST-HL-AE-3062, Forwards Rev 1 to Unit 2 Pump & Valve Inservice Test Plan. Changes Incorporated Into Rev 1 of Plan listed.W/51 Oversize Drawing + (04:58:25, 2 December 2024)
- ML20246E343 + (04:58:25, 2 December 2024)
- ML20246E342 + (04:58:26, 2 December 2024)
- ML20246E341 + (04:58:27, 2 December 2024)
- ML20246E328 + (04:58:28, 2 December 2024)
- ML20246E332 + (04:58:28, 2 December 2024)
- ML20246E326 + (04:58:29, 2 December 2024)
- ML20246E324 + (04:58:30, 2 December 2024)
- ML20246E320 + (04:58:31, 2 December 2024)