Application for Amends to Licenses NPF-11 & NPF-18,deleting cycle-specific Core Limits from Tech Specs Consistent W/ Guidance in Generic Ltr 88-16 & Changing Design Feature Description Re Transition to Advanced Fuel & Blade Design
ML20246E332
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/18/1989
From: Silady J
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
Shared Package
ML20246E337 List:
References
GL-88-16, NUDOCS 8908290093
Download: ML20246E332 (7)


Text

, ., _ _ _

~; .

g.A ']. 'Commonwilth Edison

? 1 ; 72 West Adams Street, Chicago, Illinois k " ' Address Reply to: Post Office Box 77

\ Chicago, lilinois 60690 - 0767 August 18, 1989 4

Dr. Thomas E. Murley, Director l Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

-Washington, DC 20555

~ Subjecti LaSalle County Station Units 1 and 2 Proposed Amendment to Remove Cycle-Specific Core Limits from the Technical Specifications NRC Docket Nos. 50-373 and 50-374 Reference (a): Generic Letter 88-16 dated October.4, 1988.

Dr. Murley:-

Pursuant to 10 CFR 50.90, Commonwealth Edison proposes tO amend the.

Technical Specifications (Appendix A) of Facility Operating Licenses NPF-11 and NPF-18 for LaSalle County Station Units 1 and 2,.respectively. The

' proposed amendment deletes cycle-specific core limits from the Technic?1.

Specifications consistent with the guidance in the referenced Generic Letter.

In addition, related changes to Appendix A Section 5 design feature descrip-

.tions are proposed to provide for efficient transition to advanced fuel.and control blade designs which have been NRC approved.

As suggested in the referenced Generic. Letter, the values of the removed core limits will be_ contained in a Core Operating Limits Report, which is referenced in each of the respective Limiting Conditions of Operation.

Similar amendments have been previously approved for the Oconee and Brunswick.

, plants. The bases for the proposed LaSalle changes are described in Attachment l 1 including a safety evaluation summary. The affected pages of the Technical Specifications are listed, described, and contained in Attachment 2.

The proposed changes have been reviewed and approved by both On-Site and Off-Site Review in accordance with Commonwealth Edison procedures. He have reviewed these proposed amendments in accordance with 10 CFR 50.92(c) and determined that no significant hazards consideration exists. This evaluation is documented in Attachment 3.

s 3

.P

u 1T.El Hurley 2- August 18, 1989 Enclosed as Attachment 4 are examples of the Core Operating Limits Report for both units using data for the operating cycles currently in progress. As suggested in the Generic Letter and specified in the proposed Section 6 administrative requirement, CECO will prcvide these reports for each future LaSalle County reload beginning with Unit 1 Cycle 4 (Reload 3), which is currently scheduled to start in December, 1989. Whenever appropriate, the reloads will be reviewed by CECO per 10.CFR 50.59 in order to realize the full benefits of the Generic Letter 88-16 approach including reduced NRC resources for reload reviews. . Since the Unit 1 Cycle 4 reload utilizes NRC-approved fuel types, analytical methodology, etc., CECO believes that 10 CFR 50.59 can be applied, provided this amendment is processed in a timely manner.

Commonwealth Edison is notifying the State of Illinois of our application for this amendment by transmitting a copy of this. letter and its attachment to the designated State Official.

Please direct any questions you may have regarding this matter to this office.

Very truly yours, g -

J. A. Silady Nuclear Licensing Administrator im Attachments 1: Description of Proposed Changes and Safety Evaluation 2: Proposed Changes to Appendix A Technical Specifications for LaSalle County Units 1 and 2 3: Significant Hazards Evaluation 4: Examples of Core Operating Limits Reports cc: A.B. Davis - Region Administrator, Region III R.D. Lanksbury - Senior Resident Inspector, LaSalle P.C. Shemanski - Project Manager - NRR Office of Nuclear Facility Services - IDNS SUBSCRIBED AfD S RN purr =======ue, befor nume t is / (lay *0FFICIAL SEAL" of

. , 1!l89 LELIA F. MAYO i T/ ,

'wot.ryPublic,stateof111tneisj D* dlO My Commission r.x Notary Pub 1iC {'======:pires4/25/93L = = = = :'

0189T:1-2

l l.

REMOVAL OF CYCLE SPECIFIC' EDMfjLDISIALEIIION LIMIIS.FROM LASALLE COUNTY STATION UNITS l' AND 2-

,.. /IECtlEC&L SPECIFICATIONS 1:.

L IABLE OF' CONTENTS L

L u

l .' ATTACHMENT (S) 'IDEIC

! 1. . Bases and' Safety Evaluation of. Proposed Changes

'A.' . Background B; Description of Technical Specification Changes C. Imhl'ementationPlan D. . Safety Evaluation Summary l

l~

l 2. Proposed' Technical Specifications

3. Significant Hazards Evaluation
4. Example Core Operating Limits Reports (COLR) l' f

I 1

u.

i l

Ol89T:3

.. j

m .

AHACHMENT 1 BASES AND SAFETY EVALUATION FOR PROEQSED CHANGES The following evaluation describes the proposed actions to remove

. cycle-specific. power distribution limits (Average Planar Linear Heat Generation. Rate... Minimum Critical Power Ratio, Linear Heat Generation Rate, and Rod Block Monitor Upscale Setpoints) from the LaSalle County Station Units l'and 2. Technical. Specifications, and place them in a controlled document y' . called the Core Operating Limits Report. In addition, the Section 5 descrip-tion of the fuel and control rod assemblies are reworded to allow transition to' approved, advanced designs as they become available. Completion of these

. actions will allow application of 10 CFR 50.59 to reload licensing submittals-for future LaSalle cycles. If no unreviewed safety questions exist, reload licensing.submittals and NRC' approval will not be required prior to. cycle operation.

A. BACKGROUND

-Currently, the LaSalle County Station, Units 1 and 2 Ttchnical-Specifications include cycle-specific and fuel bundle type specific power distribution operating limits. Typically, changes to these power distribution limits must be submitted prior to ecch refueling outage to reflec.t upcoming cycle' specific characteristics. Since these limits are developed using a methodology previously approved by the NRC, these frequent license amendments are an unnecessary burden on. utility and NRC resources. To eliminate these unnecessary amendments, the NRC has issued Generic Letter 88-16, " Removal of Cycle-Specific Parameter Limits From Technical Specifications", to provide guidance in changing the Technical Specifications. Commonwealth Edison has prepared changes to the Technical Specifications consistent with Generic 8.etter 88-16 and the previously approved lead BHR (Brunswick) amendment to allow an expedited NRC review l of the proposed amendment, i

B. DESCRIEHON OF TECHNICAL SPECIFICATI0JLCBAtiGES L- The Technical Specification changes are individually listed and described in Attachment 2 followed by the actual page changes for each unit. The following sections summarize the primary functions of the proposed changes.

. 1. Implementation of Generic Letter 88-16:

1 The proposed Technical Specification amendment removes the cycle-specific and fuel bundle type specific limits (Average Planar Linear Heat Generation Rate, Minimum Critical Power Ratio, Linear Heat Generation Rate, and Rod Block Monitor Upscale Setpoints) and in their place references the Core Operating Limits report (COLR). The j i

i

)

Ol89T:4 l l

COLR is a unit specific document containing the power distribution limits that are applicable for a specific cycle. Commonwealth Edison will continue to meet its responsibility for ensuring NRC approved analytical methods are used for reload safety analyses and, per this amendment, as the basis for the results reported in the COLR.

Examples of how the COLR would appear for the present LaSalle cycles (Unit 1 Cycle 3 and Unit 2 Cycle 3) are provided in Attachment 4.

The COLR for future operating cycles will be submitted to the NRC prior to startup from each refueling outage, as required by Generic Letter 88-16. The COLRs for both LaSalle units will be two separate attachments to a new LaSalle Administrative Procedure (LAP) which will control the implementation and revision of the COLR's. It should be noted that COLR revisions will receive the same level of detailed review and required approvals in the Nuclear Fuel Services Department (NFS), On-Site Review, and Off-Site Review as Technical Specification changes. In addition, the Definitions section of the Technical Specifications shall have an entry entitled " Core Operating Limits Report" and there will be a new administrative reporting requirement for the COLR added to the existing Section 6.

2. MCPR and MAPLHGR Bases Section Changes:

For consistency with the above Generic Letter 88-16 changes, some MCPR bases changes are appropriate. General Electric has performed generic analyses to establish conservative MCPR Operating Limits l

which may be applied to support operation with certain equipment out-of-service (NEDC-31455). The analyses are bounding in that a conservative end of cycle power distribution is assumed. However, the report requires that a cycle-specific verification of MCPR LCO values for certain limiting transients be performed to ensure these assumptions remain conservative. These statements to perform these cycle-specific checks are being removed from the MCPR Technical Specification bases since it is not appropriate for the criteria to determine the Limiting Condition for Operation values to be included in the bases section. The MCPR Technical Specification bases will now state that the MCPR LCO values for these certain equipment out-of-services will be valid provided that these limits bound the cycle specific results. This will require that the MCPR LCO values are verified to be valid, either by the required checks for the certain limiting transients, or if necessary, by cycle-specific analyses of the appropriate out-of-services.

1 Bases section details on the MCPR limit derivation as a function of non-rated flow conditions (Kf) and whether Rod Withdrawal Error is limiting for the cycle are also removed for simplicity and since the COLR will contain the appropriate MCPR LCO's and turves. Also deleted from the MAPLHGR Bases section is a discussion of how APLHGR i

i Ol89T:5 l

_ __ __u

x values.are calculated for the specific fuel types. This.is replaced with a more general statement that.the calculation procedure is consistent with the requirement of 10 CFR 50, Appendix K.

3. Design Feature (Section 5) Changes:

The transition to advanced fuel and control blade designs has necessitated a modification to certain Technical Specification design features (Section 5). These changes provide the required flexibility to allow installation of NRC approved fuel and control blade designs as they become available.

C. IMPLEMENTATION P_LM Although this amendment proposes Technical Specification changes for both LaSalle County Station units Commonwealth Edison intends to implement these changes as Cycle 4 operation begins on the individual unit. The primary difference between the current Cycle 3 operation and Cycle 4 operation is that_the reload fuel for both Units will consist of the GE9B Fuel Design during Cycle 4 operation. Amendment 18 to GESTAR (NEDE-240ll-P-A) incorporated the GE9B design, and received generic NRC approval in May of 1988. For this reason, Commonwealth Edison intends to employ the provisions in 10 CFR 50.59 for reviewing this new fuel design-and wil.1 include the appropriate power distribution limits in the updated COLR's. Therefore, issuance of this amendment is needed to support the

. initial start-up of LaSalle County Unit 1 Cycle 4, currently projected for December, 1989. The Unit 2 Technical Specification changes will not be required until Cycle 4 operation begins in June, 1990 based on the current outage schedule.

D. SAFETY EVALUATION

SUMMARY

The preceding discussions in Section B addressed removal of cycle specific power distribution limits from the Technical Specifications of LaSalle County Station Units 1 and 2, and referencing of a unit-specific Core Operating Limits Report per Generic Letter 88-16. Since CECO will continue to assure that NRC approved methodology and fuel types are utilized for each reload application and will submit the COLR prior to post-refueling startup for NRC information and trending, Commonwealth Edison concludes L that the proposed changes do not represent an unreviewed safety question and are acceptable to facilitate 10 CFR 50.59 reload licensing (with Edison .i having responsibility for updating cycle specific power distribution limits) for LaSalle Unit 1 Cycle 4, LaSalle Unit 2 Cycle 4, and future LaSalle operating cycles.

l-0189T:6 l

1

_ . =. _ _ _ _ ._ _ _ _ - _ . . .

p '

p,,j.

- 4'-

L With respect to the associated changes to the design features section,-the deletion of some fuel and control rod design details also has no safety impact since NRC review and approval of new designs which involve potential unreviewed: safety. questions is Gill required and'will be obtained via current' programs (e.g. GESTAR amendments for new GE fuel' types) and as. required by 10 CFR 50.92(c) and 10 CFR 50.59. Similarly, the simplification of the Bases discussion on MCPR limit verification.for equipment out-of-service.is-administrative in nature and consistent with the. Generic Letter.88-16 changes.

These conclusions are valid provided the following items are completed 4 ,

' prior to startup of. Cycle 4 operation of the respective unit:

a. The Attachment 2 Technical Specifications are.NRC approved and LaSalle procedures are modified to be consistent with the revised Technical Specifications.
b. A'LaSalle Administration Procedure (LAP) is developed to contain and-control implementation and revision of each unit's Core Operating Limits Report.

c'. The'GE98 fuel design is reviewed per 10 CFR 50.59, and the appropriate power distribution limits added to each Units Core-Operating Limits Report.

As requ' ired by 10 CFR 50.92(c), significant hazards considerations has been provided in Attachment 3.

Ol89T:7