Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000244/LER-1989-006, :on 890616,operators Observed That Radiation Monitoring Sys R-10A,R-11 & R-12 Monitors Selected to Sample Ambient Air Instead of Required Containment Air.Caused by Personnel Error.Procedures Changed + (04:11:30, 2 December 2024)
- 05000425/LER-1989-018, :on 890422,feedwater Isolation Occurred Due to Turbine Trip from Loss of Stator Cooling Water.Caused by Procedure That Allowed Reactor Power to Rapidly Drop to Level Too Difficult to Control Steam Generator + (04:11:32, 2 December 2024)
- ML20246J415 + (04:11:34, 2 December 2024)
- ML20246J416 + (04:11:34, 2 December 2024)
- ML20246J411 + (04:11:35, 2 December 2024)
- ML20246J406 + (04:11:36, 2 December 2024)
- NLS8900308, Forwards Revised Inservice Insp Program to Include Jul 1989 Addenda Incorporating New Augmented Insps in Response to Many GE Svc Info Ltrs & Various Supports & Welds + (04:11:36, 2 December 2024)
- 05000425/LER-1989-022, :on 890615,determined That Between 890527-0614, Unit Had Potentially Been Operated Above Max Power Level Specified in License Due to Calorimetric Instrument Errors. Caused by Improper Venting of Transmitter + (04:11:38, 2 December 2024)
- ML20246J402 + (04:11:39, 2 December 2024)
- ML20246J396 + (04:11:40, 2 December 2024)
- ML20246J394 + (04:11:41, 2 December 2024)
- ML20246J391 + (04:11:41, 2 December 2024)
- ML20246J390 + (04:11:42, 2 December 2024)
- ML20246J386 + (04:11:43, 2 December 2024)
- ML20246J382 + (04:11:44, 2 December 2024)
- ML20246J381 + (04:11:45, 2 December 2024)
- ML20246J380 + (04:11:45, 2 December 2024)
- ML20246J377 + (04:11:46, 2 December 2024)
- ML20246J367 + (04:11:47, 2 December 2024)
- AECM-89-0134, Responds to NRC Re Violations Noted in Insp Rept 50-416/89-14.Corrective Actions:Radiological Deficiency Rept Initiated to Document Removal of Contamination Barrier & Contamination Survey of Area Performed by Health Physics + (04:11:48, 2 December 2024)
- 05000352/LER-1989-047, :on 890720,identified That Svc Water Sys Unavailable to Provide Cooling Water to ECCS & RCIC Sys Due to Valve Position.Caused by Inadequate Emergency Procedures. Valve Reopened & Procedure T-103 Revised + (04:11:50, 2 December 2024)
- ML20246J362 + (04:11:51, 2 December 2024)
- ML20246J360 + (04:11:52, 2 December 2024)
- ML20246J355 + (04:11:53, 2 December 2024)
- 05000352/LER-1989-041, :on 890613,four Channels of Primary Containment post-LOCA Radiation Monitor Instrumentation Inoperable. Caused by Procedural Deficiency.Temporary Procedure Change Implemented to Affected Surveillance Tests + (04:11:59, 2 December 2024)
- ML20246J348 + (04:12:00, 2 December 2024)
- ML20246J342 + (04:12:01, 2 December 2024)
- ML20246J344 + (04:12:01, 2 December 2024)
- ML20246J330 + (04:12:20, 2 December 2024)
- ML20246J334 + (04:12:20, 2 December 2024)
- ML20246J326 + (04:12:21, 2 December 2024)
- ML20246J322 + (04:12:22, 2 December 2024)
- ML20246J321 + (04:12:23, 2 December 2024)
- ML20246J319 + (04:12:23, 2 December 2024)
- L-89-168, Forwards Intake Canal Barrier Improvements Status Rept for Jan-Mar 1989,per 880218 Meeting W/Nrc.Rept Withheld (Ref 10CFR2.790(a)(3)) + (04:12:24, 2 December 2024)
- ML20246J316 + (04:12:25, 2 December 2024)
- ML20246J313 + (04:12:25, 2 December 2024)
- ML20246J309 + (04:12:26, 2 December 2024)
- ML20246J305 + (04:12:27, 2 December 2024)
- IR 05000416/1989012 + (04:12:30, 2 December 2024)
- ML20246J297 + (04:12:31, 2 December 2024)
- ML20246J295 + (04:12:32, 2 December 2024)
- ML20246J291 + (04:12:33, 2 December 2024)
- ML20246J282 + (04:12:34, 2 December 2024)
- ML20246J284 + (04:12:34, 2 December 2024)
- ML20246J279 + (04:12:35, 2 December 2024)
- ML20246J280 + (04:12:35, 2 December 2024)
- ML20246J275 + (04:12:36, 2 December 2024)
- BECO-89-053, Marine Ecology Studies Re Operation of Pilgrim Station, Semiannual Rept 33,Jan-Dec 1988s + (04:12:37, 2 December 2024)
- RBG-31412, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/89-28.Corrective actions:SOP-0002 Valve Lineup Performed + (04:12:37, 2 December 2024)
- 05000277/LER-1989-006-01, :on 890209,NRC Inspector Discovered That Tubing to Torus Air & Nitrogen Purge 18 Inch Containment Isolation Valve Installed W/Inadequate Support.Caused by Deficient Installation & Maint Instructions + (04:12:40, 2 December 2024)
- AECM-89-0092, Forwards Endorsements 55 & 34 to Nelia Policy NF-257 & Maelu Policy MF-106,respectively + (04:12:41, 2 December 2024)