Summary of 890411 Meeting W/Westinghouse Owners Group, Wisconsin Electric Power Co,Duquesne Light Co & Westinghouse in Rockville,Md to Discuss Generic Program on Surge Line Stratification & Schedule for Response to Bulletin 88-011
ML20246J394
Person / Time
Issue date: 05/12/1989
From: Hou S
Office of Nuclear Reactor Regulation
To: Marsh L
Office of Nuclear Reactor Regulation
Shared Package
ML20246J373 List:
References
FOIA-89-296 IEB-88-011, IEB-88-11, NUDOCS 8909050137
Download: ML20246J394 (2)


Text

(

_~.

Enclosure j

  1. h-(

EAY ! ! 1989 HEHORANDUM FOR: Ledyard B. Marsh, Chief

)

i Mechanical Engineering Branch Division of Engineering and Systems Technology THRU:

Pao-Tsin Kuo, Section Chief Mechanical Engineering Branch Division of Engineering and Systems Technology

'TROM:

Shou-nien Hou i

Mechanical Engineering Branch Division of Engir:ering and Systems Technology "UBJECT:

MINUTES OF MEETING WITH WOG ON SURGE L1HE STRATIFICATION The staff met with Westinghouse Owners Group (WOG) on April 11, 1989, at NRC office in Rockville, Maryland. The purpose was to discuss WOG generic program on surge line stratification and overall schedules to provide responses to Bulletin 88-11. WOG presentation consisted of their collective; siforts and their generic approaches on plant grouping, plant parameter comparisons, bounding analysis on stresses and fatigue, &nd the plant specific monitoring programs. At the end of the meeting, the following understandings were reachec:

1.

A generic WOG report will be submitted for HRC review in two mon'ths (mid-June,1989).

2.

Each plant should complete bonding analysis /JC0 by the end of May, 1989. The analysis should assess all aspects of stratification and striping issues, including bounding evaluation on stresses and fatigue, based on currently available information. This means Item 1.b of the Bulletin requested actions should be completei nearly on Bulletin suggested schedule.

3.

The staff will visit Westinghouse in the week of May 15, 1989, to discuss generic bonding analysis.

4.

Proje:t Manager (Terence Chan) of this Multi-plant-action will respond to each licensee regarding requested schedule extension on Bulletin action item 1.b.

Shou-Nien Hou Mechanical Engineering Branch' Division of Engineering and Systems Technology cc: L.C.Shao DISTRIBUTION J.E. Richardson

'EMEB RF Project Directorate, NRR Shou T.L.Chan PTKuo S. Lee r

DEST:E DEST:EMEB:.b PTKuo Shou:rse 5/ p /89 5/lV81' i

.e909050137 890831 f

NOR

-296 PDR 1

I

L :.

s.,.

ATTENDANCE LIST.

L-

- NRC L. B. Harsh S. N. Hou S. Lee-P. Hadambi WOG Roger Newton, Chairman Wisconsin Electric Power Company Gree Kammerdeiner Duquesne Light Company Dave Roarty Westinghouse Bill Coslow Westinghouse Brad Mauver Westinghouse Ken Chang Westinghouse R. B. Patel Westinghouse H. H. Sandner Westinghouse S. S. Palusary Westinghouse Brain McIntyre Westinghouse 4