Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246J762 + (04:08:48, 2 December 2024)
- ML20246J759 + (04:08:49, 2 December 2024)
- ML20246J755 + (04:08:50, 2 December 2024)
- ML20246J753 + (04:08:50, 2 December 2024)
- ML20246J748 + (04:08:51, 2 December 2024)
- ML20246J746 + (04:08:52, 2 December 2024)
- ML20246J741 + (04:08:53, 2 December 2024)
- ML20246J739 + (04:08:53, 2 December 2024)
- ML20246J736 + (04:08:54, 2 December 2024)
- ML20246J732 + (04:08:55, 2 December 2024)
- LD-89-063, Responds to Violations Noted in Insp Rept 70-1100/89-200. Response Withheld (Ref 10CFR2.790(d)) + (04:08:57, 2 December 2024)
- ML20246J725 + (04:08:58, 2 December 2024)
- ST-HL-AE-3161, Forwards Description of Change to Initial Test Program, Eliminating Previously Required Evaluation & Mgt Approval of 90% Power Tests Prior to Increasing Reactor Power to 100%. Approval Will Occur After Performance of 100% Power Tests + (04:08:59, 2 December 2024)
- ML20246J723 + (04:08:59, 2 December 2024)
- ML20246J721 + (04:09:00, 2 December 2024)
- ML20246J711 + (04:09:01, 2 December 2024)
- ML20246J716 + (04:09:01, 2 December 2024)
- ML20246J708 + (04:09:02, 2 December 2024)
- ML20246J707 + (04:09:03, 2 December 2024)
- ML20246J705 + (04:09:03, 2 December 2024)
- ML20246J704 + (04:09:04, 2 December 2024)
- ML20246J702 + (04:09:04, 2 December 2024)
- ML20246J701 + (04:09:05, 2 December 2024)
- ML20246J700 + (04:09:06, 2 December 2024)
- ML20246J697 + (04:09:06, 2 December 2024)
- ML20246J694 + (04:09:07, 2 December 2024)
- ML20246J693 + (04:09:08, 2 December 2024)
- 05000327/LER-1989-012-01, :on 890410,containment Ventilation Isolation Occurred Due to Spurious High Radiation Spike on Noble Gas Channel of Lower Containment Radiation Monitor.Investigation of Incident to Be Completed by 890531 + (04:09:10, 2 December 2024)
- W3P89-1533, Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Results of Program Demonstrated That Structural Integrity of Plant Pressurizer Surge Line Maintained 40-yr Design Life + (04:09:11, 2 December 2024)
- ML20246J684 + (04:09:12, 2 December 2024)
- 05000317/LER-1989-010, :on 890614,determined That High Energy Break Temp Profile Not Correct for 5 Ft East Piping Penetration Room.Cause Not Stated.Equipment Qualification Design Manual Updated to Reflect Correct Temp Profile + (04:09:13, 2 December 2024)
- ML20246J681 + (04:09:14, 2 December 2024)
- IR 05000369/1989002 + (04:09:54, 2 December 2024)
- 05000483/LER-1989-004, :on 890517,feedwater Isolation Signal Occurred Due to Water Level in Steam Generator a Increasing to High Level Trip Setpoint.Caused by Failure to Adequately Equalize Pressure Across MSIV Prior to Opening Valves + (04:09:56, 2 December 2024)
- 05000455/LER-1989-001-12, :on 890211,safety Injection Actuation of Train a & B Equipment Occurred During Performance of Diesel Generator Operability Test.Caused by Inadequate Precautions in Surveillance Test.Procedures Revised + (04:09:59, 2 December 2024)
- ML20246J669 + (04:10:00, 2 December 2024)
- ML20246J667 + (04:10:01, 2 December 2024)
- ML20246J658 + (04:10:05, 2 December 2024)
- ML20246J657 + (04:10:05, 2 December 2024)
- ML20246J653 + (04:10:06, 2 December 2024)
- ML20246J649 + (04:10:07, 2 December 2024)
- ML20246J651 + (04:10:07, 2 December 2024)
- IR 05000259/1988007 + (04:10:08, 2 December 2024)
- ML20246J645 + (04:10:08, 2 December 2024)
- ML20246J641 + (04:10:09, 2 December 2024)
- ML20246J640 + (04:10:09, 2 December 2024)
- ML20246J637 + (04:10:10, 2 December 2024)
- ML20246J632 + (04:10:11, 2 December 2024)
- ML20246J633 + (04:10:11, 2 December 2024)
- ML20246J626 + (04:10:13, 2 December 2024)
- ML20246J627 + (04:10:13, 2 December 2024)