Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246K044 + (04:07:01, 2 December 2024)
- 05000416/LER-1989-003, :on 890414,insp of Fire Walls & Penetrations Identified Nonconformance in 3 H fire-rated Wall in Control Bldg Separating HVAC Chase from Lower Cable Spreading Room. Caused by Notch in Block Wall.Wall Sealed + (04:07:03, 2 December 2024)
- ML20246K039 + (04:07:04, 2 December 2024)
- ML20246K037 + (04:07:05, 2 December 2024)
- ML20246K031 + (04:07:06, 2 December 2024)
- ML20246K029 + (04:07:06, 2 December 2024)
- ML20246K028 + (04:07:07, 2 December 2024)
- 05000219/LER-1989-018, :on 890729,loose Wire Found in High Pressure Actuation Circuit for Electromatic Relief Valve D. Possibly Caused While Performing Surveillance on 890628. Proper Connection for Wire Verified + (04:07:09, 2 December 2024)
- A07218, Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Data Collected to Date Continues to Support Conclusions Included in Util Stating That Problems Do Not Exist at Plants + (04:07:10, 2 December 2024)
- 05000311/LER-1989-013-01, :on 890610,control Room Alarm Annunciated Due to High Differential Pressure & Reactor Tripped Resulting in in Five of Six Circulating Pumps Becoming Inoperable.Caused by Inadequate Corrective Action + (04:07:13, 2 December 2024)
- ML20246K018 + (04:07:14, 2 December 2024)
- 05000327/LER-1989-023-01, :on 890728,Limiting Condition for Operation 3.4.11 Not Entered After RCS Head Vents Inoperable.Caused by Personnel Error.Plant Drawing Changes & Procedures Revs Will Be Implemented + (04:07:16, 2 December 2024)
- ML20246K014 + (04:07:17, 2 December 2024)
- 05000353/LER-1989-004-02, :on 890725,inoperability of Reactor Encl Cooling Water Radiation Monitor in Excess of Tech Spec Allowed Time.Caused by Personnel Error.Personnel Counseled & Surveillance Tests Will Be Revised + (04:07:19, 2 December 2024)
- IR 05000425/1989016 + (04:07:21, 2 December 2024)
- ML20246K009 + (04:07:22, 2 December 2024)
- IR 05000259/1988013 + (04:07:23, 2 December 2024)
- ST-HL-AE-3163, Forwards Response to NRC Re Open Item Noted in Insp Repts 50-498/89-10 & 50-499/89-10.Response Withheld + (04:07:23, 2 December 2024)
- ML20246K004 + (04:07:24, 2 December 2024)
- ML20246K003 + (04:07:25, 2 December 2024)
- JPN-89-022, Informs That Licensee Will Work W/Nrc to Implement Emergency Response Data Sys at Plant + (04:07:26, 2 December 2024)
- ML20246J997 + (04:07:26, 2 December 2024)
- ML20246J991 + (04:07:28, 2 December 2024)
- ML20246J992 + (04:07:28, 2 December 2024)
- ML20246J986 + (04:07:29, 2 December 2024)
- ML20246J985 + (04:07:30, 2 December 2024)
- ML20246J980 + (04:07:31, 2 December 2024)
- ML20246J979 + (04:07:31, 2 December 2024)
- ML20246J977 + (04:07:32, 2 December 2024)
- ELV-00634, Responds to Generic Ltr 89-08 Re Erosion/Corrosion Induced Pipe Wall Thinning.Erosion/Corrosion Monitoring Program Implemented for Unit 1 & Will Be Developed for Unit 2.Insps for Unit 2 Will Be Performed During First Refueling Outage + (04:07:33, 2 December 2024)
- ML20246J965 + (04:07:34, 2 December 2024)
- LD-89-049, Application for Amend to License SNM-0033,making Additions & Changes to Allow Pellet Production W/Enriched U.Fee Paid + (04:07:36, 2 December 2024)
- 05000293/LER-1986-026, :on 861029,QA Audit Identified That Surveillances Required by Tech Spec Tables 4.2.D,Note 6 & 4.8-2 Not Procedurally Addressed.Caused by Lack of Verifications in Administrative Controls + (04:07:38, 2 December 2024)
- ML20246J958 + (04:07:42, 2 December 2024)
- ML20246J957 + (04:07:43, 2 December 2024)
- ML20246J956 + (04:07:44, 2 December 2024)
- 05000461/LER-1989-018, :on 890414,high Neutron Flux Signal Occurred on intermediate-range Monitor C & intermediate-range Monitor D Tripped.Caused by Recessed Connector Pin for Monitor C Signal Lead.Pin Repaired & Operators Briefed + (04:07:46, 2 December 2024)
- RBG-31428, Responds to Request for Addl Info Re Rev 3 of First 10-yr Interval Inservice Insp Program Plan + (04:07:50, 2 December 2024)
- ML20246J949 + (04:07:51, 2 December 2024)
- ML20246J950 + (04:07:51, 2 December 2024)
- ML20246J947 + (04:07:52, 2 December 2024)
- ML20246J944 + (04:07:52, 2 December 2024)
- ML20246J943 + (04:07:53, 2 December 2024)
- ML20246J938 + (04:07:54, 2 December 2024)
- ML20246J934 + (04:07:55, 2 December 2024)
- ML20246J929 + (04:07:55, 2 December 2024)
- ML20246J927 + (04:07:56, 2 December 2024)
- ML20246J922 + (04:07:57, 2 December 2024)
- ML20246J923 + (04:07:57, 2 December 2024)
- ML20246J920 + (04:07:58, 2 December 2024)
- ML20246J919 + (04:07:59, 2 December 2024)