Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247K050 + (01:11:14, 2 December 2024)
- ML20247K046 + (01:11:15, 2 December 2024)
- ML20247K047 + (01:11:15, 2 December 2024)
- ML20247K044 + (01:11:16, 2 December 2024)
- 05000368/LER-1989-007, :on 890424,snubber on Valve (2CV-4653) on Pressurizer Spray Line Found Disconnected While Performing Inservice Insp of Mechanical Snubbers.Caused by Inadequate Work Controls.Snubber on 2CV-4653 Replaced + (01:11:18, 2 December 2024)
- ML20247K040 + (01:11:19, 2 December 2024)
- 05000271/LER-1989-016, :on 890330,automatic Start of Core Spray & Sys a RHR Pumps Occurred While Pressurizing Primary Containment.Caused by Inadequate Procedure.Design Change That Implemented Logic Change Reviewed + (01:11:21, 2 December 2024)
- 05000458/LER-1989-011, :on 890321,leak Rate Test Results of Each Penetration Was in Excess of 2.4 Std Cubic Ft Per Minute. Caused by Corrosion Products Preventing Full Closure of Valves.Maint Work Orders Issued + (01:11:23, 2 December 2024)
- ML20247K034 + (01:11:24, 2 December 2024)
- ML20247K033 + (01:11:26, 2 December 2024)
- ML20247K032 + (01:11:26, 2 December 2024)
- 05000352/LER-1989-008, :on 890126,various Plant Sys Inoperable Due to Deficiencies in Physical Separation Between Class 1E & non-Class 1E Cables & Different ESF Divs.Caused by Inadequate Procurement Spec.Panels Deenergized + (01:11:29, 2 December 2024)
- 05000364/LER-1989-005, :on 890429,ESF Actuation Occurred When Safety Injection Signal Generated After Train a Solid State Selector Switch Placed in Operate Mode.Caused by Personnel Error.Disciplinary Action Administered + (01:11:33, 2 December 2024)
- ML20247K026 + (01:11:34, 2 December 2024)
- ML20247K027 + (01:11:34, 2 December 2024)
- IR 05000458/1989027 + (01:11:36, 2 December 2024)
- ML20247K022 + (01:11:37, 2 December 2024)
- ML20247K021 + (01:11:37, 2 December 2024)
- 05000373/LER-1989-009-01, :on 890302,phase to Ground Fault Resulted in Generator Isolation.Caused by Failure Phase C Lightning Arrestor on Primary of Side of Station Auxiliary Transformer + (01:11:39, 2 December 2024)
- ML20247K019 + (01:11:40, 2 December 2024)
- ML20247K017 + (01:11:41, 2 December 2024)
- ML20247K018 + (01:11:41, 2 December 2024)
- ML20247K016 + (01:11:42, 2 December 2024)
- ML20247K012 + (01:11:43, 2 December 2024)
- ML20247K013 + (01:11:43, 2 December 2024)
- ML20247K011 + (01:11:44, 2 December 2024)
- ML20247K010 + (01:11:45, 2 December 2024)
- ML20247K009 + (01:11:45, 2 December 2024)
- BECO-89-040, Forwards Update to long-term Plan as Part of Semiannual Rept,Consisting of Commitment Description,Progress Since Mar 1986 Update & Summary of Changes & Reasons Associated W/Regulatory Requirements + (01:11:46, 2 December 2024)
- 05000220/LER-1998-004-01, :on 980411,identified That Containment Spray Flow Control Valve 80-118 Had Been Left Open Since 980407. Caused by Failure by Chief Shift Operator to Properly Follow Procedure.Procedures Revised + (01:11:48, 2 December 2024)
- 05000416/LER-1989-005, :on 890429 & 0508,RCIC Sys Isolated on Indicated High Steam Line Flow.Caused by Steam Line Pressure Transients,Resulting in Oscillations in Sensing Line. Procedure Re Instrument Calibrs Revised + (01:11:50, 2 December 2024)
- ML20247K002 + (01:11:51, 2 December 2024)
- ML20247K001 + (01:11:52, 2 December 2024)
- ML20247J996 + (01:11:53, 2 December 2024)
- ML20247J997 + (01:11:53, 2 December 2024)
- NRC-89-0057, Submits Supplemental Response to Allegation RIII-88-A-0054. While Some Statements Included in Specs Intended for Const/ Installation,Engineering Justification Provided Documenting Adequate Qualification for Each Spec Deviation + (01:11:54, 2 December 2024)
- ML20247J995 + (01:11:54, 2 December 2024)
- ML20247J991 + (01:11:55, 2 December 2024)
- JPN-89-025, Forwards Application for Amend to License DPR-59,revising Tech Spec Tables 4.1-1,4.1-2 & 4.2-1 to Correct Typos + (01:11:56, 2 December 2024)
- ML20247J990 + (01:11:56, 2 December 2024)
- 05000352/LER-1988-042, :on 881223,inoperability of Plant Sys Due to Unacceptable Physical Separation Between safety-related Cabling Determined.Caused by Personnel Error.Plant Procedure Will Incorporate Consolidated Open Items List.W/Undated Ltr + (01:12:00, 2 December 2024)
- ML20247J985 + (01:12:01, 2 December 2024)
- ST-HL-AE-3224, Forwards Rev 0 to Core Operating Limits Rept, Unit 2, Cycle 1,dtd 890804,per Tech Spec 6.9.1.6 + (01:12:02, 2 December 2024)
- ML20247J984 + (01:12:02, 2 December 2024)
- ML20247J980 + (01:12:03, 2 December 2024)
- ML20247J981 + (01:12:03, 2 December 2024)
- ML20247J979 + (01:12:04, 2 December 2024)
- IR 05000245/1989009 + (01:12:05, 2 December 2024)
- RBG-44496, Forwards Rev 7 to Safeguards Contingency Plan.Changes Have Been Determined to Not Decrease Effectiveness of Security Program.Encl Withheld,Per 10CFR73.21 + (01:12:05, 2 December 2024)
- ML20247J976 + (01:12:06, 2 December 2024)
- B13229, Forwards Addl Info Re Generic Ltr 88-01 in Response to 890422 Request.Submittals Constitute Complete IGSCC Program, W/Responses to NRC Positions & No Other Interpretation of Program Should Be Construed by Omission of Any Info + (01:12:07, 2 December 2024)