ML20247J980

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/89-27 on 890605-09 & 19-23 & Notice of Violation
ML20247J980
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/17/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20247J983 List:
References
NUDOCS 8907310408
Download: ML20247J980 (2)


See also: IR 05000458/1989027

Text

.._ _ _ _ _

U q.  ;;

- O'

(j "
_

p g; JJL I-71989,

h In Reply' Refer To:

Docket: 50-458/89-27'

i

e

Gulf States' Utilities- l

-ATTN: .Mr. James C. Deddens

Senior'Vice President (RBNG) j

.P.O. Box 220 l

.St. Francisville Louisiana 70775

Gentlemen:

This refers to the inspection conducted by Messrs. W. M. McNeill and

D. 'L. Kelley of this office during the periods June 5-9' and 19-23,1989, of

activities authorized by NRC Opereting License NPF-47 for the River Bend

~ Station, and to the discussion of our findings with you and other members of

.'your staff at the conclusion of the inspection.

,

The area examined during the inspection was self-assessment capabilities.

'

Within this area, the inspection consisted of selective examination of

procedures and representative records,' interviews with personnel and  ;

observations by the NRC inspectors. The inspection findings are documented in

-the enclosed inspection report.

]

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions-of Section 2.201

.of the NRC's " Rules of' Practice," Part 2. Title 10, Code of Federal

F Regulations. Your response should be based on the specifics contained in the

-Notice of Violation enclosed with this letter.

The response' directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as' required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

'

Sincer ly,

&t. /

a,eN.M1 i ector

Division of Reactor Projects i

Enclosures: (see next page) j

'

'

,/ . h

RIV:0PS* C:0PS* RI:MQPS* C:MQPS AD S kl3 D:DRP

'DLKelley/tw JEGagliardo WMMcNeill IBarnes LOCellan MLMilhoan

/ /89 / /89 / /89 7 //2/89 g/p,/89 9 1 //T/89

  • previously concurred

8907310408

PDR

890717 1\

O ADOCK 05000458 i

FDC

_ - _ _ _ _ _ _ _ - _ _

%,y, -

-

>

, .., a

L,. .'

1

..

f,9 .

, . >

s

'

?: Gulf States' Utilities '- 2-

,

n, -

'

Enclosures:- ' .

.

l 1. ' Appendix'A - Notice of Violation

,  ? ' ;2. Appendix'B - NRC Inspection Report'

15

'50-458/89-27

cc w/ enclosures:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

River. Bend 0versight

P.O. Box 2951

.

Beaumont, Texas 77704

,

Gulf States' Utilities

,

ATTN:- Les England, Director

-

. Nuclear Licensing.- RBNG

P.O. Box 220-

St. Francisville Louisiana 707+5

Louisiana State University,

,..

Government. Documents Department

Louisiana Radiation Control Program Director

'

bec to DMB (IE01)

ill bec distrib. by RIV:

  • DRP *RRI

a 1*R.:D. Martin, RA' *Section Chief (DRP/C)

Lisa Shea,LRM/ALF' * MIS System

  • RPB-DRSS *RSTS Operator
  • Project Engineer (DRP/C) *RIV File
  • DRS(2 copies) G. F. Sanborn, E0
  • D.-L. Kelley *W. M. McNeill
  • J. E. Gagliardo *I. Barnes

'*W. Paulson, NRR Project Manager (MS: 13-D-18)

  • w/766

I

t )

l

P

u--.-___ _ . _ . _ . . _ _ . _ _ _ _ _